2,607
Projects
912,713 MW
Capacity waiting
494,460 MW
Clean energy capacity waiting
1281/2607 projects are zero-carbon generation
$1326.65B
Est. investment waiting
2071/2607 projects have an applicable estimate
Documented estimates, not precise figures. See methodology.
Status
State
Length of delay
Project type
Fuel / technology
Capacity
Stage
Interconnection queue stage
Data source
Loading map…
2607 projects
| Project | Fuel | Location | Waiting ↓ | Capacity | Stage | Queue stage |
|---|---|---|---|---|---|---|
| Duke Energy Florida Interconnection Request 4 (Gas) | Gas | FL | 27.4 yrs | 537 MW | Interconnection study | In Progress (unknown study) |
| UPPER NORTH FORK FEATHER RIVER (FERC No. P-2105) | Hydro | CA | 23.9 yrs | 362 MW | Agency permitting | — |
| HELLS CANYON (FERC No. P-1971) | Hydro | ID | 23.1 yrs | 1,167 MW | Agency permitting | — |
| FEATHER RIVER (PS&CON) (FERC No. P-2100) | Hydro | CA | 21.6 yrs | 763 MW | Agency permitting | — |
| COOSA RIVER (FERC No. P-2146) | Hydro | AL | 21.1 yrs | 961 MW | Agency permitting | — |
| BIG CREEK 2A, 8, EASTWOOD (PS&CON) (FERC No. P-67) | Hydro | CA | 19.5 yrs | 373 MW | Agency permitting | — |
| Florida Power & Light Interconnection Request 108 (Nuclear) | Nuclear | FL | 19.0 yrs | 1,300 MW | Interconnection study | Facility Study |
| Florida Power & Light Interconnection Request 107 (Nuclear) | Nuclear | FL | 19.0 yrs | 1,300 MW | Interconnection study | Facility Study |
| Interconnection Request G0344 (Wind) | Wind (onshore) | OR | 18.0 yrs | 488 MW | Interconnection study | Facility Study |
| Interconnection Request G0366 (Wind) | Wind (onshore) | OR | 17.3 yrs | 302 MW | Interconnection study | Facility Study |
| MCCLOUD PIT (FERC No. P-2106) | Hydro | CA | 17.1 yrs | 386 MW | Agency permitting | — |
| Interconnection Request G0478 (Solar+Battery) | Solar | OR | 14.0 yrs | 300 MW | Interconnection study | Facility Study |
| Interconnection Request G0490 (Hydro) | Hydro | WA | 13.2 yrs | 345 MW | Interconnection study | Facility Study |
| BPA Power Services Interconnection Request G0492 (Hydro) | Hydro | ID | 13.1 yrs | 300 MW | Interconnection study | Facility Study |
| Los Angeles Department of Water and Power Interconnection Request Q44 (Solar+Battery) | Solar | UT | 13.0 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| YUBA RIVER (FERC No. P-2246) | Hydro | CA | 12.4 yrs | 362 MW | Agency permitting | — |
| WAPA/BEPC/HCPD Integrated System Interconnection Request GI-1404 (Wind) | Wind (onshore) | ND | 12.3 yrs | 383 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0501 (Gas) | Gas | OR | 11.9 yrs | 1,100 MW | Interconnection study | Facility Study |
| WAPA/BEPC/HCPD Integrated System Interconnection Request GI-1503 (Wind) | Wind (onshore) | ND | 11.5 yrs | 251 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 18INR0009 (Gas) | Gas | TX | 11.4 yrs | 1,174 MW | Interconnection study | Facility Study |
| Navajo-Crystal Interconnection Request NC5-001 (Solar+Battery) | Solar | UT | 11.3 yrs | 480 MW | Interconnection study | — |
| Los Angeles Department of Water and Power Interconnection Request Q49 (Solar+Battery) | Solar | UT | 11.0 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| NYSEG Interconnection Request 519 (Wind) | Wind (onshore) | NY | 10.8 yrs | 291 MW | Interconnection study | Facility Study |
| NYPA Interconnection Request 521 (Wind) | Wind (onshore) | NY | 10.7 yrs | 449 MW | Interconnection study | Facility Study |
| Los Angeles Department of Water and Power Interconnection Request Q50 (Solar+Battery) | Solar | UT | 10.7 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q51 (Solar+Battery) | Solar | UT | 10.7 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q52 (Solar+Battery) | Solar | UT | 10.6 yrs | 324 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 17INR0043 (Wind) | Wind (onshore) | TX | 10.4 yrs | 400 MW | Interconnection study | Facility Study |
| NORTHFIELD MOUNTAIN PUMPED STORAGE (FERC No. P-2485) | Hydro | MA | 10.4 yrs | 1,167 MW | Agency permitting | — |
| NorthWestern Energy Interconnection Request 300 (Wind+Battery) | Wind (onshore) | MT | 10.2 yrs | 315 MW | Interconnection study | Facility Study |
| Heritage Wind, LLC (NY DPS Case 16-F-0546) | Wind (onshore) | NY | 10.0 yrs | Not disclosed | Local/state review | — |
| Atlantic Wind LLC (NY DPS Case 16-F-0713) | Wind (onshore) | NY | 9.7 yrs | Not disclosed | Local/state review | — |
| Dairy Air Wind, LLC (VT 8887) | Wind (onshore) | VT | 9.7 yrs | 2.2 MW | Local/state review | — |
| NM-NG Interconnection Request 596 (Wind) | Wind (onshore) | NY | 9.7 yrs | 339 MW | Interconnection study | System Impact Study |
| Interconnection Request G0558 (Wind) | Wind (onshore) | WA | 9.5 yrs | 500 MW | Interconnection study | Facility Study |
| NorthWestern Energy Interconnection Request 311 (Solar+Battery) | Solar | MT | 9.5 yrs | 300 MW | Interconnection study | Facility Study |
| Interconnection Request G0559 (Wind) | Wind (onshore) | WA | 9.5 yrs | 250 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q255 (Solar+Battery) | Solar | AZ | 9.3 yrs | 2,000 MW | Interconnection study | In Progress (unknown study) |
| Navajo-Crystal Interconnection Request NC5-002 (Other) | Other | NV | 9.3 yrs | 499 MW | Interconnection study | — |
| Interconnection Request G0566 (Hydro) | Hydro | MT | 9.3 yrs | 646 MW | Interconnection study | Facility Study |
| Interconnection Request 19INR0075 (Solar) | Solar | TX | 9.2 yrs | 301 MW | Interconnection study | Facility Study |
| Navajo-Crystal Interconnection Request NC5-003 (Solar+Battery) | Solar | NV | 9.1 yrs | 250 MW | Interconnection study | — |
| Watkins Glen Solar Energy Center, LLC (NY DPS Case 17-F-0595) | Solar | NY | 9.0 yrs | Not disclosed | Local/state review | — |
| Franklin Solar, LLC (NY DPS Case 17-F-0602) | Solar | NY | 8.9 yrs | Not disclosed | Local/state review | — |
| Riverhead Solar 2, LLC (NY DPS Case 17-F-0655) | Solar | NY | 8.9 yrs | Not disclosed | Local/state review | — |
| Central Hudson Gas and Electric Corporation (NY DPS Case 17-T-0816) | Transmission | NY | 8.7 yrs | Not disclosed | Local/state review | — |
| Galloo Island Wind, LLC (NY DPS Case 18-T-0015) | Transmission | NY | 8.7 yrs | Not disclosed | Local/state review | — |
| Jacksonville Electric Authority Interconnection Request JEA-Q008 (Gas) | Gas | FL | 8.5 yrs | 645 MW | Interconnection study | Feasibility Study |
| Circular EnerG, LLC (NY DPS Case 18-F-0150) | Other | NY | 8.5 yrs | 80 MW | Local/state review | — |
| Interconnection Request G0585 (Wind) | Wind (onshore) | WA | 8.5 yrs | 313 MW | Interconnection study | In Progress (unknown study) |
| Bull Run Solar LLC (NY DPS Case 18-F-0189) | Solar | NY | 8.5 yrs | 170 MW | Local/state review | — |
| Arizona Public Service Interconnection Request Q274 (Solar) | Solar | AZ | 8.4 yrs | 1,000 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q273 (Wind) | Wind (onshore) | AZ | 8.4 yrs | 477 MW | Interconnection study | In Progress (unknown study) |
| SDGE Interconnection Request 1534 (Solar+Battery) | Solar | AZ | 8.4 yrs | 250 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 1522 (Solar+Battery) | Solar | NV | 8.4 yrs | 370 MW | Interconnection study | System Impact Study |
| Danskammer Energy, LLC (NY DPS Case 18-F-0325) | Other | NY | 8.3 yrs | Not disclosed | Local/state review | — |
| Interconnection Request G0589 (Solar) | Solar | WA | 8.3 yrs | 381 MW | Interconnection study | Facility Study |
| Bear Ridge Solar, LLC (NY DPS Case 18-F-0338) | Solar | NY | 8.3 yrs | Not disclosed | Local/state review | — |
| NYPA Interconnection Request 721 (Solar) | Solar | NY | 8.3 yrs | 280 MW | Interconnection study | System Impact Study |
| NSTAR Gas Company d/b/a Eversource Energy (MA EFSB EFSB18-02) | Other | MA | 8.2 yrs | Not disclosed | Local/state review | — |
| ConEd Interconnection Request 737 (Offshore Wind) | Wind (offshore) | NY | 8.2 yrs | 816 MW | Interconnection study | System Impact Study |
| Arizona Public Service Interconnection Request Q278 (Battery) | Storage | AZ | 8.2 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| EDF Renewables Development, Inc (NY DPS Case 18-F-0440) | Solar | NY | 8.1 yrs | 175 MW | Local/state review | — |
| EDF Renewables Development, Inc (NY DPS Case 18-F-0498) | Solar | NY | 8.1 yrs | Not disclosed | Local/state review | — |
| Niagara Mohawk Power Corporation d/b/a National Grid (NY DPS Case 18-T-0561) | Other | NY | 8.0 yrs | Not disclosed | Local/state review | — |
| WAPA Rocky Mountain Region Interconnection Request 2018-G6 (Solar+Battery) | Solar | — | 8.0 yrs | 360 MW | Interconnection study | In Progress (unknown study) |
| Deepwater Wind South Fork, LLC (NY DPS Case 18-T-0604) | Wind (onshore) | NY | 8.0 yrs | Not disclosed | Local/state review | — |
| ComEd Interconnection Request AE1-172 (Wind) | Wind (onshore) | IL | 8.0 yrs | 255 MW | Interconnection study | System Impact Study |
| LIPA Interconnection Request 766 (Offshore Wind) | Wind (offshore) | NY | 7.9 yrs | 880 MW | Interconnection study | System Impact Study |
| Horseshoe Solar Energy LLC (NY DPS Case 18-F-0633) | Solar | NY | 7.9 yrs | 180 MW | Local/state review | — |
| NorthWestern Energy Interconnection Request 357 (Wind) | Wind (onshore) | MT | 7.9 yrs | 750 MW | Interconnection study | Facility Study |
| NorthWestern Energy Interconnection Request 356 (Wind) | Wind (onshore) | MT | 7.9 yrs | 750 MW | Interconnection study | Facility Study |
| The Empire District Electric Company (MO PSC Case EA-2019-0118) | Other | MO | 7.9 yrs | Not disclosed | Local/state review | — |
| Interconnection Request G0608 (Battery) | Storage | WA | 7.8 yrs | 1,200 MW | Interconnection study | In Progress (unknown study) |
| NM-NG Interconnection Request 783 (Solar+Battery) | Solar | NY | 7.8 yrs | 270 MW | Interconnection study | Facility Study |
| Astoria Generating Company, L.P (NY DPS Case 18-F-0758) | Other | NY | 7.7 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 806 (Offshore Wind) | Wind (offshore) | MA | 7.7 yrs | 827 MW | Interconnection study | Facility Study |
| Interconnection Request G0609 (Battery) | Storage | OR | 7.7 yrs | 400 MW | Interconnection study | Facility Study |
| Interconnection Request 20INR0233 (Wind) | Wind (onshore) | TX | 7.7 yrs | 282 MW | Interconnection study | Facility Study |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2019-0209) | Solar | MO | 7.6 yrs | Not disclosed | Local/state review | — |
| Niagara Mohawk Power Corporation (NY DPS Case 19-T-0069) | Other | NY | 7.6 yrs | Not disclosed | Local/state review | — |
| PacifiCorp Interconnection Request C006 (Wind) | Wind (onshore) | MT | 7.5 yrs | 600 MW | Interconnection study | — |
| Interconnection Request G0615 (Solar+Battery) | Solar | OR | 7.5 yrs | 800 MW | Interconnection study | Facility Study |
| Los Angeles Department of Water and Power Interconnection Request Q67 (Solar+Battery) | Solar | NV | 7.5 yrs | 250 MW | Interconnection study | Facility Study |
| NorthWestern Energy Interconnection Request 361 (Wind) | Wind (onshore) | MT | 7.5 yrs | 600 MW | Interconnection study | Facility Study |
| EDF Renewables Development, Inc (NY DPS Case 19-F-0201) | Solar | NY | 7.5 yrs | Not disclosed | Local/state review | — |
| Los Angeles Department of Water and Power Interconnection Request Q68 (Solar+Battery) | Solar | CA | 7.5 yrs | 1,200 MW | Interconnection study | Facility Study |
| PacifiCorp Interconnection Request C007 (Wind) | Wind (onshore) | MT | 7.4 yrs | 300 MW | Interconnection study | — |
| ComEd Interconnection Request AE2-261 (Solar) | Solar | IL | 7.4 yrs | 299 MW | Interconnection study | System Impact Study |
| NYPA Interconnection Request 811 (Solar) | Solar | NY | 7.4 yrs | 500 MW | Interconnection study | System Impact Study |
| Interconnection Request G0619 (Wind) | Wind (onshore) | OR | 7.4 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| SCE Interconnection Request 1647 (Solar+Battery) | Solar | NV | 7.4 yrs | 700 MW | Interconnection study | In Progress (unknown study) |
| SDGE Interconnection Request 1663 (Solar+Battery) | Solar | AZ | 7.4 yrs | 460 MW | Interconnection study | System Impact Study |
| Interconnection Request 21INR0294 (Solar) | Solar | TX | 7.4 yrs | 332 MW | Interconnection study | Facility Study |
| Interconnection Request 22INR0218 (Solar+Battery) | Solar | TX | 7.3 yrs | 252 MW | Interconnection study | Facility Study |
| EDF Renewables Development, Inc (NY DPS Case 19-F-0461) | Solar | NY | 7.2 yrs | Not disclosed | Local/state review | — |
| EDF Renewables Development, Inc (NY DPS Case 19-F-0471) | Solar | NY | 7.2 yrs | Not disclosed | Local/state review | — |
| Boralex, Inc (NY DPS Case 19-F-0512) | Solar | NY | 7.1 yrs | 120 MW | Local/state review | — |
| Interconnection Request 21INR0380 (Solar+Battery) | Solar | TX | 7.1 yrs | 262 MW | Interconnection study | Facility Study |
| WAPA Sierra Nevada Interconnection Request 2019-G1 (Solar+Battery) | Solar | CA | 7.1 yrs | 300 MW | Interconnection study | Facility Study |
| Prattsburgh Wind, LLC (NY DPS Case 19-F-0540) | Wind (onshore) | NY | 7.1 yrs | 147 MW | Local/state review | — |
| LS Power Grid New York, LLC, LS Power Grid New York Corporation I, and the New York Power Authority (NY DPS Case 19-T-0549) | Other | NY | 7.0 yrs | Not disclosed | Local/state review | — |
| ConnectGen LLC (NY DPS Case 19-F-0560) | Solar | NY | 7.0 yrs | 270 MW | Local/state review | — |
| EDF Renewables Development, Inc (NY DPS Case 19-F-0588) | Solar | NY | 7.0 yrs | Not disclosed | Local/state review | — |
| ConnectGen LLC (NY DPS Case 19-F-0591) | Solar | NY | 7.0 yrs | Not disclosed | Local/state review | — |
| EDF Renewables (NY DPS Case 19-F-0602) | Solar | NY | 7.0 yrs | Not disclosed | Local/state review | — |
| EDF Renewables (NY DPS Case 19-F-0603) | Solar | NY | 7.0 yrs | 350 MW | Local/state review | — |
| AEP Interconnection Request AF1-176 (Solar+Battery) | Solar | MI | 7.0 yrs | 300 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request AF1-204 (Wind) | Wind (onshore) | IN | 7.0 yrs | 255 MW | Interconnection study | System Impact Study |
| Alder Creek Solar, LLC (NY DPS Case 19-F-0638) | Solar | NY | 7.0 yrs | 200 MW | Local/state review | — |
| Arizona Public Service Interconnection Request Q312 (Solar) | Solar | AZ | 6.9 yrs | 500 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q311 (Wind+Battery) | Wind (onshore) | AZ | 6.9 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| EDF Renewables (NY DPS Case 19-F-0639) | Solar | NY | 6.9 yrs | 350 MW | Local/state review | — |
| Arizona Public Service Interconnection Request Q314 (Battery) | Storage | AZ | 6.9 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Arizona Public Service Interconnection Request Q317 (Solar+Battery) | Solar | AZ | 6.9 yrs | 750 MW | Interconnection study | Cluster Study |
| EDF Renewables (NY DPS Case 19-F-0641) | Solar | NY | 6.9 yrs | 350 MW | Local/state review | — |
| Salt River Project Interconnection Request Q28 (Solar+Battery) | Solar | AZ | 6.9 yrs | 250 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q28 (Solar+Battery) | Solar | AZ | 6.9 yrs | 250 MW | Interconnection study | — |
| New York Transco LLC (NY DPS Case 19-T-0684) | Transmission | NY | 6.9 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 22INR0237 (Solar+Battery) | Solar | TX | 6.8 yrs | 411 MW | Interconnection study | Facility Study |
| DEVIL'S CANYON (FERC No. P-14797) | Hydro | CA | 6.8 yrs | 273 MW | Agency permitting | — |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2020-0160) | Other | MO | 6.8 yrs | Not disclosed | Local/state review | — |
| ComEd Interconnection Request AF2-041 (Solar) | Solar | IL | 6.7 yrs | 300 MW | Interconnection study | System Impact Study |
| Interconnection Request 23INR0008 (Solar+Battery) | Solar | TX | 6.7 yrs | 506 MW | Interconnection study | Facility Study |
| Verona Solar LLC (NY DPS Case 19-F-0777) | Solar | NY | 6.7 yrs | Not disclosed | Local/state review | — |
| Riverside Solar, LLC (NY DPS Case 19-F-0781) | Solar | NY | 6.7 yrs | 100 MW | Local/state review | — |
| White Creek Solar LLC (NY DPS Case 20-F-0019) | Solar | NY | 6.6 yrs | Not disclosed | Local/state review | — |
| Brookside Solar, LLC (NY DPS Case 20-F-0023) | Solar | NY | 6.6 yrs | 100 MW | Local/state review | — |
| Interconnection Request 23INR0006 (Solar) | Solar | TX | 6.6 yrs | 255 MW | Interconnection study | Facility Study |
| Orleans Solar LLC (NY DPS Case 20-F-0037) | Solar | NY | 6.6 yrs | Not disclosed | Local/state review | — |
| SOUTH SWP (FERC No. P-2426) | Hydro | CA | 6.6 yrs | 1,349 MW | Agency permitting | — |
| Hecate Energy Columbia County 1, LLC (NY DPS Case 20-F-0048) | Solar | NY | 6.6 yrs | Not disclosed | Local/state review | — |
| New Bremen Solar, LLC (NY DPS Case 20-F-0051) | Solar | NY | 6.6 yrs | 100 MW | Local/state review | — |
| Sacramento Municipal Utility District Interconnection Request 3 (Solar+Battery) | Solar | CA | 6.6 yrs | 250 MW | Interconnection study | Facility Study |
| Empire Solar, LLC (NY DPS Case 20-F-0085) | Solar | NY | 6.6 yrs | 125 MW | Local/state review | — |
| Interconnection Request G0643 (Battery) | Storage | OR | 6.5 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0642 (Battery) | Storage | OR | 6.5 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q76 (Solar+Battery) | Solar | CA | 6.5 yrs | 400 MW | Interconnection study | System Impact Study |
| Sugar Maple Solar, LLC (NY DPS Case 20-F-0129) | Solar | NY | 6.5 yrs | 125 MW | Local/state review | — |
| North Park Energy, LLC (NY DPS Case 20-F-0133) | Solar | NY | 6.5 yrs | 450 MW | Local/state review | — |
| ComEd Interconnection Request AF2-182 (Solar) | Solar | IL | 6.5 yrs | 300 MW | Interconnection study | Feasibility Study |
| Arizona Public Service Interconnection Request Q334 (Solar+Battery) | Solar | AZ | 6.5 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Arizona Public Service Interconnection Request Q337 (Solar+Battery) | Solar | AZ | 6.4 yrs | 450 MW | Interconnection study | Facility Study |
| ComEd Interconnection Request AF2-349 (Solar) | Solar | IL | 6.4 yrs | 300 MW | Interconnection study | System Impact Study |
| NPPD Interconnection Request GEN-2020-011 (Solar+Battery) | Solar | NE | 6.4 yrs | 320 MW | Interconnection study | Facility Study |
| PGAE Interconnection Request 1745 (Gas) | Gas | CA | 6.4 yrs | 656 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 1766 (Battery) | Storage | CA | 6.4 yrs | 250 MW | Interconnection study | System Impact Study |
| PGAE Interconnection Request 1736 (Solar+Battery) | Solar | CA | 6.4 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| DCRT Interconnection Request 1678 (Solar+Battery) | Solar | AZ | 6.4 yrs | 309 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 1795 (Solar+Battery) | Solar | NV | 6.4 yrs | 450 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2020-067 (Wind) | Wind (onshore) | TX | 6.4 yrs | 353 MW | Interconnection study | Facility Study |
| Interconnection Request 22INR0330 (Solar+Battery) | Solar | TX | 6.4 yrs | 303 MW | Interconnection study | Facility Study |
| Interconnection Request 22INR0332 (Battery) | Storage | TX | 6.4 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 22INR0347 (Battery) | Storage | TX | 6.3 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request G0648 (Solar+Battery) | Solar | OR | 6.3 yrs | 300 MW | Interconnection study | Facility Study |
| Interconnection Request 22INR0337 (Solar) | Solar | TX | 6.3 yrs | 610 MW | Interconnection study | Facility Study |
| NM-NG Interconnection Request 1031 (Solar+Battery) | Solar | NY | 6.2 yrs | 250 MW | Interconnection study | System Impact Study |
| Interconnection Request 22INR0365 (Battery) | Storage | TX | 6.2 yrs | 307 MW | Interconnection study | Facility Study |
| Interconnection Request G0651 (Solar) | Solar | OR | 6.2 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy (NV PUCN Docket 20-07024) | Transmission | NV | 6.1 yrs | Not disclosed | Local/state review | — |
| Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy (NV PUCN Docket 20-07025) | Transmission | NV | 6.1 yrs | Not disclosed | Local/state review | — |
| PacifiCorp Interconnection Request C012 (Wind) | Wind (onshore) | MT | 6.1 yrs | 750 MW | Interconnection study | — |
| ENTERGY TEXAS, INC. Interconnection Request R1003 (Gas+Other) | Gas | TX | 6.1 yrs | 1,166 MW | Interconnection study | — |
| NorthWestern Energy Interconnection Request 390 (Solar+Wind+Battery) | Wind (onshore) | MT | 6.1 yrs | 500 MW | Interconnection study | Facility Study |
| NYSEG Interconnection Request 1080 (Solar) | Solar | PA | 6.0 yrs | 402 MW | Interconnection study | System Impact Study |
| Interconnection Request 22INR0400 (Solar+Battery) | Solar | TX | 6.0 yrs | 408 MW | Interconnection study | Facility Study |
| Ameren Transmission Company of Illinois (MO PSC Case EA-2021-0045) | Transmission | MO | 6.0 yrs | Not disclosed | Local/state review | — |
| ComEd Interconnection Request AG1-118 (Solar) | Solar | IL | 6.0 yrs | 300 MW | Interconnection study | Feasibility Study |
| Interconnection Request 22INR0402 (Solar+Battery) | Solar | TX | 6.0 yrs | 504 MW | Interconnection study | Facility Study |
| Interconnection Request 23INR0055 (Solar) | Solar | TX | 6.0 yrs | 506 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q347 (Wind) | Wind (onshore) | AZ | 6.0 yrs | 345 MW | Interconnection study | Cluster Study |
| Interconnection Request 22INR0350 (Solar) | Solar | TX | 6.0 yrs | 287 MW | Interconnection study | Facility Study |
| Interconnection Request G0656 (Battery) | Storage | WA | 6.0 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0657 (Solar+Battery) | Solar | OR | 6.0 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Arizona Public Service Interconnection Request Q348 (Solar+Wind+Battery) | Wind (onshore) | AZ | 6.0 yrs | 300 MW | Interconnection study | Cluster Study |
| AEP Interconnection Request AG1-226 (Solar) | Solar | IN | 6.0 yrs | 450 MW | Interconnection study | Feasibility Study |
| Interconnection Request 22INR0423 (Battery) | Storage | TX | 5.9 yrs | 301 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q352 (Solar+Battery) | Solar | AZ | 5.9 yrs | 450 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q354 (Solar+Battery) | Solar | AZ | 5.9 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Arizona Public Service Interconnection Request Q359 (Solar+Battery) | Solar | AZ | 5.9 yrs | 315 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q362 (Solar+Battery) | Solar | NC | 5.9 yrs | 275 MW | Interconnection study | Cluster Study |
| AEP Interconnection Request AG1-410 (Solar) | Solar | OH | 5.9 yrs | 300 MW | Interconnection study | System Impact Study |
| ComEd Interconnection Request AG1-374 (Solar) | Solar | IL | 5.9 yrs | 300 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AG1-553 (Solar) | Solar | IL | 5.9 yrs | 260 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AG1-462 (Solar) | Solar | IL | 5.9 yrs | 255 MW | Interconnection study | Feasibility Study |
| Los Angeles Department of Water and Power Interconnection Request Q78 (Other Storage) | Storage | CA | 5.9 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q79 (Battery) | Storage | CA | 5.9 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 22INR0462 (Solar+Battery) | Solar | TX | 5.8 yrs | 512 MW | Interconnection study | Facility Study |
| Interconnection Request 23INR0139 (Battery) | Storage | TX | 5.8 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 24INR0011 (Solar+Battery) | Solar | TX | 5.8 yrs | 503 MW | Interconnection study | Facility Study |
| CLECO POWER Interconnection Request R1004 (Solar+Other) | Solar | LA | 5.7 yrs | 330 MW | Interconnection study | — |
| Heritage Wind, LLC (NY DPS Case 21-00026) | Wind (onshore) | NY | 5.7 yrs | Not disclosed | Local/state review | — |
| Morris Ridge Solar Energy Center, LLC (NY DPS Case 21-00025) | Solar | NY | 5.7 yrs | Not disclosed | Local/state review | — |
| Riverhead Solar 2, LLC (NY DPS Case 21-00024) | Solar | NY | 5.7 yrs | Not disclosed | Local/state review | — |
| Alle-Catt Wind Energy LLC (NY DPS Case 21-T-0059) | Wind (onshore) | NY | 5.6 yrs | Not disclosed | Local/state review | — |
| Sacramento Municipal Utility District Interconnection Request 8 (Solar+Battery) | Solar | CA | 5.6 yrs | 344 MW | Interconnection study | Facility Study |
| Interconnection Request G0668 (Solar+Battery) | Solar | WA | 5.6 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| PacifiCorp Interconnection Request C013 (Wind) | Wind (onshore) | MT | 5.6 yrs | 326 MW | Interconnection study | — |
| NorthWestern Energy Interconnection Request 406 (Wind) | Wind (onshore) | MT | 5.6 yrs | 300 MW | Interconnection study | Facility Study |
| NorthWestern Energy Interconnection Request 407 (Wind) | Wind (onshore) | MT | 5.6 yrs | 300 MW | Interconnection study | Facility Study |
| NorthWestern Energy Interconnection Request 408 (Wind) | Wind (onshore) | MT | 5.6 yrs | 326 MW | Interconnection study | Facility Study |
| Interconnection Request 22INR0480 (Wind) | Wind (onshore) | TX | 5.6 yrs | 300 MW | Interconnection study | Facility Study |
| Interconnection Request G0669 (Solar) | Solar | OR | 5.5 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0670 (Solar+Battery) | Solar | WA | 5.5 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 23INR0209 (Solar+Battery) | Solar | TX | 5.5 yrs | 508 MW | Interconnection study | Facility Study |
| Interconnection Request 23INR0214 (Solar+Battery) | Solar | TX | 5.5 yrs | 503 MW | Interconnection study | Facility Study |
| Interconnection Request G0673 (Solar) | Solar | OR | 5.5 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0675 (Other+Battery+Other Storage) | Storage | OR | 5.5 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Ameren Transmission Company of Illinois (MO PSC Case EA-2021-0288) | Transmission | MO | 5.5 yrs | Not disclosed | Local/state review | — |
| Ameren Transmission Company of Illinois (MO PSC Case EA-2021-0287) | Transmission | MO | 5.5 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 22INR0497 (Gas) | Gas | TX | 5.5 yrs | 680 MW | Interconnection study | Facility Study |
| Interconnection Request 1109 (Offshore Wind) | Wind (offshore) | MA | 5.5 yrs | 487 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q368 (Solar+Battery) | Solar | AZ | 5.5 yrs | 500 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q370 (Wind) | Wind (onshore) | AZ | 5.4 yrs | 310 MW | Interconnection study | Cluster Study |
| ConnectGen Chautauqua County LLC (NY DPS Case 21-00750) | Solar | NY | 5.4 yrs | Not disclosed | Local/state review | — |
| Arizona Public Service Interconnection Request Q387 (Solar+Battery) | Solar | AZ | 5.4 yrs | 588 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q392 (Solar+Battery) | Solar | AZ | 5.4 yrs | 270 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q393 (Solar+Battery) | Solar | AZ | 5.4 yrs | 500 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q388 (Solar+Battery) | Solar | AZ | 5.4 yrs | 323 MW | Interconnection study | Cluster Study |
| Prattsburgh Wind, LLC (NY DPS Case 21-00749) | Wind (onshore) | NY | 5.4 yrs | Not disclosed | Local/state review | — |
| Riverside Solar, LLC (NY DPS Case 21-00752) | Solar | NY | 5.4 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 23INR0227 (Solar+Battery) | Solar | TX | 5.4 yrs | 255 MW | Interconnection study | Facility Study |
| Los Angeles Department of Water and Power Interconnection Request Q80 (Solar+Battery) | Solar | CA | 5.4 yrs | 350 MW | Interconnection study | In Progress (unknown study) |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2021-0341) | Other | MO | 5.4 yrs | Not disclosed | Local/state review | — |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2021-0340) | Other | MO | 5.4 yrs | Not disclosed | Local/state review | — |
| PGAE Interconnection Request 1842 (Battery) | Storage | CA | 5.4 yrs | 417 MW | Interconnection study | System Impact Study |
| PGAE Interconnection Request 1854 (Battery) | Storage | CA | 5.4 yrs | 476 MW | Interconnection study | System Impact Study |
| PGAE Interconnection Request 1843 (Battery) | Storage | CA | 5.4 yrs | 400 MW | Interconnection study | System Impact Study |
| PGAE Interconnection Request 1892 (Battery) | Storage | CA | 5.4 yrs | 308 MW | Interconnection study | System Impact Study |
| PGAE Interconnection Request 1904 (Battery) | Storage | CA | 5.4 yrs | 365 MW | Interconnection study | System Impact Study |
| PGAE Interconnection Request 1915 (Battery) | Storage | CA | 5.4 yrs | 256 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 2033 (Battery) | Storage | CA | 5.4 yrs | 292 MW | Interconnection study | System Impact Study |
| PGAE Interconnection Request 1963 (Battery) | Storage | CA | 5.4 yrs | 256 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 2060 (Battery) | Storage | CA | 5.4 yrs | 528 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 2092 (Battery) | Storage | CA | 5.4 yrs | 512 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 2111 (Battery) | Storage | CA | 5.4 yrs | 406 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 2114 (Battery) | Storage | CA | 5.4 yrs | 403 MW | Interconnection study | In Progress (unknown study) |
| SCE Interconnection Request 2115 (Battery) | Storage | CA | 5.4 yrs | 406 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 2117 (Battery) | Storage | CA | 5.4 yrs | 406 MW | Interconnection study | System Impact Study |
| SDGE Interconnection Request 2176 (Battery) | Storage | CA | 5.4 yrs | 633 MW | Interconnection study | System Impact Study |
| SDGE Interconnection Request 2186 (Battery) | Storage | CA | 5.4 yrs | 256 MW | Interconnection study | System Impact Study |
| SDGE Interconnection Request 2185 (Battery) | Storage | CA | 5.4 yrs | 256 MW | Interconnection study | System Impact Study |
| SDGE Interconnection Request 2180 (Battery) | Storage | CA | 5.4 yrs | 313 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 2141 (Battery) | Storage | NV | 5.4 yrs | 256 MW | Interconnection study | System Impact Study |
| SDGE Interconnection Request 2157 (Battery) | Storage | CA | 5.4 yrs | 304 MW | Interconnection study | System Impact Study |
| SDGE Interconnection Request 2178 (Battery) | Storage | CA | 5.4 yrs | 313 MW | Interconnection study | System Impact Study |
| PGAE Interconnection Request 1980 (Solar+Battery) | Solar | CA | 5.4 yrs | 412 MW | Interconnection study | System Impact Study |
| PGAE Interconnection Request 2004 (Solar+Battery) | Solar | CA | 5.4 yrs | 410 MW | Interconnection study | System Impact Study |
| PGAE Interconnection Request 1968 (Solar+Battery) | Solar | CA | 5.4 yrs | 1,040 MW | Interconnection study | System Impact Study |
| PGAE Interconnection Request 2015 (Solar+Battery) | Solar | CA | 5.4 yrs | 311 MW | Interconnection study | System Impact Study |
| DCRT Interconnection Request 2025 (Solar+Battery) | Solar | AZ | 5.4 yrs | 719 MW | Interconnection study | System Impact Study |
| DCRT Interconnection Request 2023 (Solar+Battery) | Solar | AZ | 5.4 yrs | 2,042 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 2045 (Solar+Battery) | Solar | CA | 5.4 yrs | 430 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 2085 (Solar+Battery) | Solar | CA | 5.4 yrs | 464 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 2140 (Solar+Battery) | Solar | NV | 5.4 yrs | 250 MW | Interconnection study | System Impact Study |
| DCRT Interconnection Request 2027 (Solar+Battery) | Solar | AZ | 5.4 yrs | 411 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 2052 (Solar+Battery) | Solar | AZ | 5.4 yrs | 1,010 MW | Interconnection study | System Impact Study |
| GLW Interconnection Request 2146 (Solar+Battery) | Solar | NV | 5.4 yrs | 517 MW | Interconnection study | System Impact Study |
| DCRT Interconnection Request 2022 (Solar+Battery) | Solar | AZ | 5.4 yrs | 380 MW | Interconnection study | System Impact Study |
| SCE Interconnection Request 2078 (Solar+Battery) | Solar | CA | 5.4 yrs | 372 MW | Interconnection study | System Impact Study |
| SDGE Interconnection Request 2162 (Solar+Battery) | Solar | MX | 5.4 yrs | 286 MW | Interconnection study | System Impact Study |
| GLW Interconnection Request 2150 (Solar+Battery) | Solar | NV | 5.4 yrs | 307 MW | Interconnection study | System Impact Study |
| SDGE Interconnection Request 2154 (Solar+Battery) | Solar | AZ | 5.4 yrs | 308 MW | Interconnection study | System Impact Study |
| Interconnection Request 23INR0228 (Solar+Battery) | Solar | TX | 5.4 yrs | 604 MW | Interconnection study | Facility Study |
| SUNC Interconnection Request GEN-2021-070 (Wind) | Wind (onshore) | KS | 5.4 yrs | 504 MW | Interconnection study | Facility Study |
| Brookside Solar, LLC (NY DPS Case 21-00917) | Solar | NY | 5.4 yrs | Not disclosed | Local/state review | — |
| WAPA Desert Southwest Region Interconnection Request 2021-G4 (Solar+Battery) | Solar | AZ | 5.4 yrs | 463 MW | Interconnection study | — |
| WERE Interconnection Request GEN-2021-096 (Solar) | Solar | KS | 5.4 yrs | 500 MW | Interconnection study | Facility Study |
| NPPD Interconnection Request GEN-2021-057 (Wind) | Wind (onshore) | NE | 5.4 yrs | 300 MW | Interconnection study | Facility Study |
| Tracy Solar Energy Center, LLC (NY DPS Case 21-00962) | Solar | NY | 5.4 yrs | Not disclosed | Local/state review | — |
| AEP Interconnection Request GEN-2021-016 (Wind) | Wind (onshore) | OK | 5.4 yrs | 250 MW | Interconnection study | Facility Study |
| SPS Interconnection Request GEN-2021-090 (Solar+Battery) | Solar | TX | 5.4 yrs | 400 MW | Interconnection study | Facility Study |
| Greens Corners Solar LLC (NY DPS Case 21-00982) | Solar | NY | 5.4 yrs | Not disclosed | Local/state review | — |
| Homer Solar Energy Center, LLC (NY DPS Case 21-00976) | Solar | NY | 5.4 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 23INR0127 (Battery) | Storage | TX | 5.3 yrs | 409 MW | Interconnection study | Facility Study |
| Salt River Project Interconnection Request Q76 (Gas) | Gas | AZ | 5.3 yrs | 332 MW | Interconnection study | — |
| WERE Interconnection Request GEN-2021-006 (Battery) | Storage | KS | 5.3 yrs | 300 MW | Interconnection study | Facility Study |
| Interconnection Request 23INR0126 (Battery) | Storage | TX | 5.3 yrs | 408 MW | Interconnection study | Facility Study |
| Watkins Glen Solar Energy Center, LLC (NY DPS Case 21-01069) | Solar | NY | 5.3 yrs | Not disclosed | Local/state review | — |
| KCPL Interconnection Request GEN-2021-030 (Solar) | Solar | KS | 5.3 yrs | 510 MW | Interconnection study | Facility Study |
| KCPL Interconnection Request GEN-2021-029 (Battery) | Storage | KS | 5.3 yrs | 254 MW | Interconnection study | Facility Study |
| Hecate Energy Cider Solar LLC (NY DPS Case 21-01108) | Solar | NY | 5.3 yrs | Not disclosed | Local/state review | — |
| NYPA Interconnection Request 1183 (Solar) | Solar | NY | 5.3 yrs | 250 MW | Interconnection study | System Impact Study |
| Sacramento Municipal Utility District Interconnection Request 12 (Solar+Battery) | Solar | CA | 5.3 yrs | 250 MW | Interconnection study | Facility Study |
| Navajo-Crystal Interconnection Request NC5-008 (Wind) | Wind (onshore) | AZ | 5.3 yrs | 500 MW | Interconnection study | — |
| Interconnection Request 23INR0272 (Battery) | Storage | TX | 5.3 yrs | 304 MW | Interconnection study | Facility Study |
| New York Power Authority and Niagara Mohawk Power Corporation d/b/a National Grid (NY DPS Case 21-T-0340) | Other | NY | 5.2 yrs | Not disclosed | Local/state review | — |
| Interconnection Request G0678 (Solar) | Solar | OR | 5.2 yrs | 1,200 MW | Interconnection study | In Progress (unknown study) |
| Tucson Electric Power Company Interconnection Request 95 (Other) | Other | AZ | 5.2 yrs | 250 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q29 (Solar+Battery) | Solar | AZ | 5.2 yrs | 250 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q29 (Solar+Battery) | Solar | AZ | 5.2 yrs | 250 MW | Interconnection study | — |
| Empire Offshore Wind LLC (NY DPS Case 21-T-0366) | Transmission | NY | 5.2 yrs | Not disclosed | Local/state review | — |
| Interconnection Request G0681 (Solar+Battery) | Solar | OR | 5.2 yrs | 1,000 MW | Interconnection study | In Progress (unknown study) |
| ITC MIDWEST Interconnection Request J2272 (Solar+Battery) | Solar | IA | 5.1 yrs | 250 MW | Interconnection study | Cluster Study |
| Interconnection Request G0684 (Solar+Battery) | Solar | WA | 5.1 yrs | 470 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q82 (Battery) | Storage | CA | 5.1 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| ITC MIDWEST Interconnection Request J2268 (Solar) | Solar | IA | 5.1 yrs | 400 MW | Interconnection study | Cluster Study |
| AMEREN MISSOURI Interconnection Request J2205 (Solar+Battery) | Solar | MO | 5.1 yrs | 300 MW | Interconnection study | Cluster Study |
| METC Interconnection Request J2100 (Battery) | Storage | MI | 5.1 yrs | 250 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J2128 (Wind+Battery) | Wind (onshore) | IL | 5.1 yrs | 300 MW | Interconnection study | Cluster Study |
| HOOSIER ENERGY Interconnection Request J2270 (Solar) | Solar | IN | 5.1 yrs | 300 MW | Interconnection study | Cluster Study |
| GREAT RIVER ENERGY Interconnection Request S1009 (Wind+Other) | Wind (onshore) | — | 5.1 yrs | 259 MW | Interconnection study | — |
| METC Interconnection Request J2098 (Solar) | Solar | MI | 5.0 yrs | 309 MW | Interconnection study | Cluster Study |
| Platte River Power Authority Interconnection Request 21-08242 (Wind) | Wind (onshore) | WY | 5.0 yrs | 350 MW | Interconnection study | System Impact Study |
| Interconnection Request G0687 (Solar) | Solar | OR | 5.0 yrs | 900 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0688 (Solar+Battery) | Solar | WA | 5.0 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| ITC Interconnection Request J2139 (Solar+Battery) | Solar | MI | 5.0 yrs | 250 MW | Interconnection study | Cluster Study |
| Interconnection Request 24INR0118 (Solar+Battery) | Solar | TX | 5.0 yrs | 262 MW | Interconnection study | Facility Study |
| Interconnection Request 23INR0273 (Solar) | Solar | TX | 5.0 yrs | 439 MW | Interconnection study | Facility Study |
| Interconnection Request 23INR0330 (Battery) | Storage | TX | 5.0 yrs | 411 MW | Interconnection study | Facility Study |
| Interconnection Request 24INR0094 (Solar+Battery) | Solar | TX | 5.0 yrs | 666 MW | Interconnection study | Facility Study |
| Interconnection Request G0702 (Solar+Battery) | Solar | OR | 5.0 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0695 (Other+Battery+Other Storage) | Storage | OR | 5.0 yrs | 1,200 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0699 (Solar+Other+Battery) | Solar | OR | 5.0 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Arizona Public Service Interconnection Request Q401 (Solar+Battery) | Solar | AZ | 4.9 yrs | 700 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q402 (Solar+Battery) | Solar | AZ | 4.9 yrs | 750 MW | Interconnection study | Cluster Study |
| Interconnection Request 24INR0125 (Solar) | Solar | TX | 4.9 yrs | 408 MW | Interconnection study | Facility Study |
| Interconnection Request 24INR0098 (Solar+Battery) | Solar | TX | 4.9 yrs | 509 MW | Interconnection study | Facility Study |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2022-0089) | Other | MO | 4.9 yrs | Not disclosed | Local/state review | — |
| Bear Ridge Solar, LLC (NY DPS Case 21-02104) | Solar | NY | 4.9 yrs | Not disclosed | Local/state review | — |
| Arizona Public Service Interconnection Request Q427 (Battery) | Storage | AZ | 4.9 yrs | 250 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q437 (Solar+Battery) | Solar | AZ | 4.9 yrs | 300 MW | Interconnection study | Facility Study |
| INDIANAPOLIS POWER & LIGHT COMPANY Interconnection Request R1011 (Solar+Other+Battery) | Solar | IN | 4.9 yrs | 250 MW | Interconnection study | — |
| METC Interconnection Request J2260 (Wind) | Wind (onshore) | MI | 4.9 yrs | 252 MW | Interconnection study | Cluster Study |
| Tennessee Valley Authority Interconnection Request 483 (Gas) | Gas | TN | 4.9 yrs | 1,600 MW | Interconnection study | Facility Study |
| Southwestern Electric Power Company (LA PSC Docket U-36165) | Other | LA | 4.9 yrs | Not disclosed | Local/state review | — |
| Los Angeles Department of Water and Power Interconnection Request Q84 (Battery) | Storage | CA | 4.9 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 24INR0095 (Solar+Battery) | Solar | TX | 4.9 yrs | 666 MW | Interconnection study | Facility Study |
| Los Angeles Department of Water and Power Interconnection Request Q85 (Solar+Battery) | Solar | UT | 4.9 yrs | 275 MW | Interconnection study | In Progress (unknown study) |
| Tucson Electric Power Company Interconnection Request 100 (Other) | Other | AZ | 4.9 yrs | 250 MW | Interconnection study | — |
| Tucson Electric Power Company Interconnection Request 103 (Other) | Other | AZ | 4.8 yrs | 768 MW | Interconnection study | — |
| Interconnection Request 24INR0145 (Gas) | Gas | TX | 4.8 yrs | 450 MW | Interconnection study | Facility Study |
| Orange and Rockland Utilities, Inc (NY DPS Case 21-T-0569) | Transmission | NY | 4.8 yrs | Not disclosed | Local/state review | — |
| Horseshoe Solar Energy LLC (NY DPS Case 21-02480) | Solar | NY | 4.8 yrs | Not disclosed | Local/state review | — |
| Interconnection Request G0711 (Solar) | Solar | OR | 4.8 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0712 (Solar) | Solar | OR | 4.8 yrs | 448 MW | Interconnection study | In Progress (unknown study) |
| Rochester Gas and Electric Corporation (NY DPS Case 21-T-0574) | Transmission | NY | 4.8 yrs | Not disclosed | Local/state review | — |
| Los Angeles Department of Water and Power Interconnection Request Q86 (Wind) | Wind (onshore) | UT | 4.8 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Hecate Energy Columbia County 1, LLC (NY DPS Case 21-02553) | Other | NY | 4.8 yrs | Not disclosed | Local/state review | — |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J2304 (Battery) | Storage | WI | 4.8 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Tucson Electric Power Company Interconnection Request 106 (Other) | Other | AZ | 4.7 yrs | 320 MW | Interconnection study | — |
| Tucson Electric Power Company Interconnection Request 107 (Other) | Other | AZ | 4.7 yrs | 400 MW | Interconnection study | — |
| Tennessee Valley Authority Interconnection Request 489 (Gas) | Gas | TN | 4.7 yrs | 1,689 MW | Interconnection study | Facility Study |
| Interconnection Request 24INR0097 (Solar+Battery) | Solar | TX | 4.7 yrs | 666 MW | Interconnection study | Facility Study |
| Interconnection Request 24INR0130 (Battery) | Storage | TX | 4.7 yrs | 411 MW | Interconnection study | Facility Study |
| Interconnection Request 24INR0135 (Battery) | Storage | TX | 4.7 yrs | 410 MW | Interconnection study | Facility Study |
| Interconnection Request 24INR0157 (Battery) | Storage | TX | 4.7 yrs | 402 MW | Interconnection study | Facility Study |
| Stonefield Solar, LLC (KY PSC Case 2022-00011) | Solar | KY | 4.7 yrs | 120 MW | Local/state review | — |
| GridLiance West LLC (NV PUCN Docket 22-01021) | Transmission | NV | 4.7 yrs | Not disclosed | Local/state review | — |
| Moraine Solar Energy Center, LLC (NY DPS Case 22-00024) | Solar | NY | 4.7 yrs | Not disclosed | Local/state review | — |
| Somerset Solar, LLC (NY DPS Case 22-00026) | Solar | NY | 4.7 yrs | Not disclosed | Local/state review | — |
| NorthWestern Energy Interconnection Request 418 (Wind) | Wind (onshore) | MT | 4.7 yrs | 750 MW | Interconnection study | System Impact Study |
| Georgia Transmission Interconnection Request GI-160 (Solar+Battery) | Solar | GA | 4.7 yrs | 250 MW | Interconnection study | Facility Study |
| AEP Interconnection Request AH2-069 (Solar) | Solar | VA | 4.6 yrs | 250 MW | Interconnection study | Feasibility Study |
| Montana-Dakota Utilities Co. (ND PSC PU-22-034) | Gas | ND | 4.6 yrs | Not disclosed | Local/state review | — |
| Tucson Electric Power Company Interconnection Request 112 (Other) | Other | AZ | 4.6 yrs | 250 MW | Interconnection study | — |
| Interconnection Request G0724 (Battery) | Storage | OR | 4.6 yrs | 280 MW | Interconnection study | In Progress (unknown study) |
| WAPA Desert Southwest Region Interconnection Request 2022-G1 (Solar+Battery) | Solar | AZ | 4.6 yrs | 250 MW | Interconnection study | — |
| Southwestern Electric Power Company (LA PSC Docket U-36259) | Solar | LA | 4.6 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 24INR0172 (Solar+Battery) | Solar | TX | 4.6 yrs | 402 MW | Interconnection study | Facility Study |
| NorthWestern Energy Interconnection Request 419 (Solar) | Solar | MT | 4.6 yrs | 300 MW | Interconnection study | System Impact Study |
| Alliant Energy East Interconnection Request R1015 (Other+Battery) | Storage | — | 4.6 yrs | 423 MW | Interconnection study | — |
| Tri-State Generation & Transmission (CO PUC Docket 22A-0085E) | Other | CO | 4.6 yrs | Not disclosed | Local/state review | — |
| AEP Interconnection Request AH2-112 (Solar+Battery) | Solar | IN | 4.5 yrs | 250 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AH2-113 (Solar+Battery) | Solar | IL | 4.5 yrs | 250 MW | Interconnection study | Feasibility Study |
| Dominion Interconnection Request AH2-133 (Battery) | Storage | VA | 4.5 yrs | 300 MW | Interconnection study | Feasibility Study |
| Continental Resources, Inc. (ND PSC PU-22-141) | Gas | ND | 4.5 yrs | Not disclosed | Local/state review | — |
| PacifiCorp Interconnection Request S0005 (Solar) | Solar | WY | 4.5 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| PacifiCorp Interconnection Request S0006 (Solar) | Solar | WY | 4.5 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| AEP Interconnection Request AH2-257 (Solar) | Solar | IN | 4.5 yrs | 400 MW | Interconnection study | Feasibility Study |
| PSEG Interconnection Request AH2-334 (Battery) | Storage | NJ | 4.5 yrs | 300 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AH2-270 (Wind) | Wind (onshore) | IL | 4.5 yrs | 300 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AH2-340 (Solar) | Solar | IL | 4.5 yrs | 350 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AH2-342 (Solar) | Solar | IL | 4.5 yrs | 280 MW | Interconnection study | Feasibility Study |
| AEP Interconnection Request AH2-351 (Solar) | Solar | KY | 4.5 yrs | 1,000 MW | Interconnection study | Feasibility Study |
| AEP Interconnection Request AH2-348 (Solar) | Solar | IN | 4.5 yrs | 700 MW | Interconnection study | Feasibility Study |
| AEP Interconnection Request AH2-352 (Solar) | Solar | IN | 4.5 yrs | 400 MW | Interconnection study | Feasibility Study |
| AEP Interconnection Request AH2-353 (Solar) | Solar | KY | 4.5 yrs | 1,000 MW | Interconnection study | Feasibility Study |
| AEP Interconnection Request AH2-413 (Solar+Battery) | Solar | IN | 4.5 yrs | 365 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AH2-415 (Battery) | Storage | IL | 4.5 yrs | 300 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AH2-416 (Battery) | Storage | IL | 4.5 yrs | 450 MW | Interconnection study | Feasibility Study |
| AEP Interconnection Request AH2-322 (Solar) | Solar | VA | 4.5 yrs | 290 MW | Interconnection study | Feasibility Study |
| AEC Interconnection Request AH2-333 (Battery) | Storage | NJ | 4.5 yrs | 415 MW | Interconnection study | Feasibility Study |
| AEP Interconnection Request AH2-414 (Battery) | Storage | IN | 4.5 yrs | 350 MW | Interconnection study | Feasibility Study |
| Interconnection Request 23INR0233 (Solar) | Solar | TX | 4.5 yrs | 371 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q443 (Solar+Battery) | Solar | AZ | 4.5 yrs | 300 MW | Interconnection study | Facility Study |
| Interconnection Request 1238 (Battery) | Storage | MA | 4.5 yrs | 300 MW | Interconnection study | Feasibility Study |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J2275 (Wind) | Wind (onshore) | IL | 4.5 yrs | 250 MW | Interconnection study | Cluster Study |
| NV Energy Interconnection Request Company PK (Solar+Battery) | Solar | NV | 4.5 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| AMEREN ILLINOIS Interconnection Request J2267 (Solar+Battery) | Solar | IL | 4.5 yrs | 250 MW | Interconnection study | Cluster Study |
| NORTHERN INDIANA PUBLIC SERVICE COMPANY Interconnection Request J2215 (Battery) | Storage | IN | 4.5 yrs | 300 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J2171 (Solar+Wind) | Wind (onshore) | IL | 4.5 yrs | 500 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q446 (Solar+Battery) | Solar | AZ | 4.4 yrs | 250 MW | Interconnection study | Cluster Study |
| Interconnection Request 24INR0282 (Battery) | Storage | TX | 4.4 yrs | 311 MW | Interconnection study | Facility Study |
| Interconnection Request 25INR0057 (Solar) | Solar | TX | 4.4 yrs | 352 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q465 (Solar+Battery) | Solar | AZ | 4.4 yrs | 300 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q466 (Solar+Battery) | Solar | AZ | 4.4 yrs | 1,000 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q467 (Battery) | Storage | AZ | 4.4 yrs | 300 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q468 (Battery) | Storage | AZ | 4.4 yrs | 1,000 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q474 (Solar+Gas+Battery) | Solar | AZ | 4.4 yrs | 1,000 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q475 (Solar+Battery) | Solar | AZ | 4.4 yrs | 250 MW | Interconnection study | Facility Study |
| Dominion Interconnection Request AI1-017 (Battery) | Storage | VA | 4.4 yrs | 300 MW | Interconnection study | Feasibility Study |
| Dominion Interconnection Request AI1-018 (Battery) | Storage | VA | 4.4 yrs | 300 MW | Interconnection study | Feasibility Study |
| AEP Interconnection Request AI1-022 (Battery) | Storage | IN | 4.4 yrs | 450 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AI1-024 (Battery) | Storage | IL | 4.4 yrs | 300 MW | Interconnection study | Feasibility Study |
| Los Angeles Department of Water and Power Interconnection Request Q89 (Solar+Battery) | Solar | CA | 4.4 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q88 (Solar+Battery) | Solar | NV | 4.4 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q90 (Solar+Battery) | Solar | UT | 4.4 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Tri-State Generation and Transmission (CO PUC Docket 22A-0145E) | Other | CO | 4.4 yrs | Not disclosed | Local/state review | — |
| JCPL Interconnection Request AI1-001 (Offshore Wind) | Wind (offshore) | NJ | 4.4 yrs | 2,100 MW | Interconnection study | Feasibility Study |
| Tucson Electric Power Company Interconnection Request 118 (Wind) | Wind (onshore) | AZ | 4.4 yrs | 300 MW | Interconnection study | — |
| Navajo-Crystal Interconnection Request NC5-009 (Wind) | Wind (onshore) | AZ | 4.4 yrs | 300 MW | Interconnection study | — |
| ONEOK Bakken Pipeline, L.L.C. (ND PSC PU-22-164) | Gas | ND | 4.4 yrs | Not disclosed | Local/state review | — |
| Tucson Electric Power Company Interconnection Request 119 (Solar+Battery) | Solar | AZ | 4.4 yrs | 270 MW | Interconnection study | — |
| PacifiCorp Interconnection Request C2-39 (Solar+Battery) | Solar | UT | 4.4 yrs | 300 MW | Interconnection study | — |
| APS Interconnection Request AI1-040 (Solar) | Solar | PA | 4.4 yrs | 250 MW | Interconnection study | Feasibility Study |
| PacifiCorp Interconnection Request C2-72 (Solar+Battery) | Solar | UT | 4.3 yrs | 300 MW | Interconnection study | Facility Study |
| PacifiCorp Interconnection Request C2-106 (Wind) | Wind (onshore) | WY | 4.3 yrs | 400 MW | Interconnection study | Facility Study |
| Beacon Wind LLC (NY DPS Case 22-T-0294) | Transmission | NY | 4.3 yrs | Not disclosed | Local/state review | — |
| PacifiCorp Interconnection Request C2-152 (Solar+Battery) | Solar | OR | 4.3 yrs | 320 MW | Interconnection study | Facility Study |
| PacifiCorp Interconnection Request C2-182 (Solar+Battery) | Solar | OR | 4.3 yrs | 320 MW | Interconnection study | Facility Study |
| PacifiCorp Interconnection Request C2-208 (Solar+Battery) | Solar | OR | 4.3 yrs | 320 MW | Interconnection study | Facility Study |
| PacifiCorp Interconnection Request C2-203 (Solar+Battery) | Solar | OR | 4.3 yrs | 400 MW | Interconnection study | Facility Study |
| PacifiCorp Interconnection Request C2-187 (Solar+Battery) | Solar | OR | 4.3 yrs | 320 MW | Interconnection study | Facility Study |
| BEPC Interconnection Request GEN-2022-010 (Other) | Other | ND | 4.3 yrs | 250 MW | Interconnection study | Facility Study |
| Eversource Gas Company of Massachusetts (MA EFSB EFSB22-05) | Pipeline | MA | 4.3 yrs | Not disclosed | Local/state review | — |
| Empire Offshore Wind LLC (NY DPS Case 22-T-0346) | Transmission | NY | 4.3 yrs | Not disclosed | Local/state review | — |
| WAPA Desert Southwest Region Interconnection Request 2022-G7 (Solar+Battery) | Solar | AZ | 4.3 yrs | 250 MW | Interconnection study | — |
| OGE Interconnection Request GEN-2022-016 (Solar) | Solar | OK | 4.2 yrs | 288 MW | Interconnection study | Facility Study |
| SUNC Interconnection Request GEN-2022-015 (Solar) | Solar | KS | 4.2 yrs | 270 MW | Interconnection study | Facility Study |
| WERE Interconnection Request GEN-2022-013 (Solar) | Solar | KS | 4.2 yrs | 300 MW | Interconnection study | Facility Study |
| National Water Infrastructure, LLC (LA PSC Docket U-36383) | Other | LA | 4.2 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 24INR0368 (Solar+Battery) | Solar | TX | 4.2 yrs | 305 MW | Interconnection study | Facility Study |
| Los Angeles Department of Water and Power Interconnection Request Q91 (Hydrogen) | Hydro | CA | 4.2 yrs | 346 MW | Interconnection study | In Progress (unknown study) |
| Tucson Electric Power Company Interconnection Request 124 (Solar+Battery) | Solar | AZ | 4.2 yrs | 300 MW | Interconnection study | — |
| Interconnection Request G0758 (Solar+Gas+Battery) | Solar | OR | 4.2 yrs | 365 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0760 (Gas+Battery) | Storage | WA | 4.2 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0752 (Gas+Battery) | Storage | OR | 4.2 yrs | 340 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q92 (Solar+Battery) | Solar | CA | 4.2 yrs | 1,650 MW | Interconnection study | In Progress (unknown study) |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J2107 (Solar) | Solar | WI | 4.2 yrs | 399 MW | Interconnection study | In Progress (unknown study) |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J2099 (Solar) | Solar | WI | 4.2 yrs | 399 MW | Interconnection study | In Progress (unknown study) |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J2186 (Solar) | Solar | IL | 4.2 yrs | 821 MW | Interconnection study | Cluster Study |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J2185 (Solar) | Solar | WI | 4.2 yrs | 399 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0761 (Wind) | Wind (onshore) | WA | 4.2 yrs | 290 MW | Interconnection study | In Progress (unknown study) |
| Tucson Electric Power Company Interconnection Request 125 (Solar+Battery) | Solar | AZ | 4.2 yrs | 1,000 MW | Interconnection study | — |
| GridLiance West LLC (NV PUCN Docket 22-06042) | Transmission | NV | 4.2 yrs | Not disclosed | Local/state review | — |
| WAPA Desert Southwest Region Interconnection Request 2022-G9 (Solar+Battery) | Solar | AZ | 4.2 yrs | 300 MW | Interconnection study | — |
| Georgia Transmission Interconnection Request GI-168 (Solar) | Solar | GA | 4.2 yrs | 500 MW | Interconnection study | Facility Study |
| Sacramento Municipal Utility District Interconnection Request 20 (Solar+Battery) | Solar | CA | 4.2 yrs | 550 MW | Interconnection study | Facility Study |
| Platte River Power Authority Interconnection Request 22-07251 (Gas+Oil) | Gas | CO | 4.1 yrs | 250 MW | Interconnection study | System Impact Study |
| Darrow-Riverway and Evans-Riverway 138 kV Transmission Line Project (OH OPSB Case 22-0250-EL-BTX) | Transmission | OH | 4.1 yrs | Not disclosed | Planned, approvals not yet initiated | — |
| NORTHERN STATES POWER COMPANY Interconnection Request J3163 (Other) | Other | ND | 4.1 yrs | 479 MW | Interconnection study | Cluster Study |
| Grain Belt Express LLC (IL ICC Docket 22-0499) | Transmission | IL | 4.1 yrs | Not disclosed | Local/state review | — |
| AEP Interconnection Request AI1-085 (Solar) | Solar | IN | 4.1 yrs | 290 MW | Interconnection study | Feasibility Study |
| GridLiance West LLC (NV PUCN Docket 22-07020) | Transmission | NV | 4.1 yrs | Not disclosed | Local/state review | — |
| Los Angeles Department of Water and Power Interconnection Request Q93 (Solar+Battery) | Solar | UT | 4.1 yrs | 1,000 MW | Interconnection study | In Progress (unknown study) |
| Cleco Power LLC (LA PSC Docket U-36502) | Solar | LA | 4.1 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 24INR0404 (Solar+Battery) | Solar | TX | 4.1 yrs | 508 MW | Interconnection study | Facility Study |
| Interconnection Request 30INR0002 (Other) | Other | TX | 4.1 yrs | 1,232 MW | Interconnection study | Facility Study |
| Alexander Connector, LLC and NST Express, LLC (ND PSC PU-22-345) | Gas | ND | 4.1 yrs | Not disclosed | Local/state review | — |
| Interconnection Request G0774 (Battery) | Storage | OR | 4.1 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0778 (Battery) | Storage | OR | 4.1 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0792 (Battery) | Storage | OR | 4.1 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0796 (Battery) | Storage | OR | 4.1 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0791 (Solar+Battery) | Solar | OR | 4.1 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0787 (Battery+Other Storage) | Storage | OR | 4.1 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0797 (Solar+Battery) | Solar | OR | 4.1 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0795 (Solar+Battery) | Solar | OR | 4.1 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0773 (Solar+Battery) | Solar | OR | 4.1 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0777 (Solar+Battery) | Solar | OR | 4.1 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| JCPL Interconnection Request AI1-110 (Offshore Wind) | Wind (offshore) | NJ | 4.0 yrs | 1,310 MW | Interconnection study | Feasibility Study |
| JCPL Interconnection Request AI1-111 (Offshore Wind) | Wind (offshore) | NJ | 4.0 yrs | 1,310 MW | Interconnection study | Feasibility Study |
| PSEG Interconnection Request AI1-109 (Offshore Wind) | Wind (offshore) | NJ | 4.0 yrs | 1,310 MW | Interconnection study | Feasibility Study |
| KCPL Interconnection Request GEN-2022-073 (Battery) | Storage | MO | 4.0 yrs | 300 MW | Interconnection study | Facility Study |
| Interconnection Request 24INR0413 (Battery) | Storage | TX | 4.0 yrs | 304 MW | Interconnection study | Facility Study |
| Interconnection Request 24INR0423 (Solar+Battery) | Solar | TX | 4.0 yrs | 460 MW | Interconnection study | Facility Study |
| Interconnection Request 25INR0176 (Battery) | Storage | TX | 4.0 yrs | 257 MW | Interconnection study | Facility Study |
| Imperial Irrigation District Interconnection Request GI-2022-162 (Solar+Battery) | Solar | CA | 4.0 yrs | 270 MW | Interconnection study | In Progress (unknown study) |
| ENTERGY MISSISSIPPI, LLC. Interconnection Request J2966 (Solar) | Solar | MS | 4.0 yrs | 450 MW | Interconnection study | Cluster Study |
| GREAT RIVER ENERGY Interconnection Request S1036 (Wind+Other) | Wind (onshore) | IL | 4.0 yrs | 400 MW | Interconnection study | — |
| ComEd Interconnection Request AI1-149 (Battery) | Storage | IL | 4.0 yrs | 250 MW | Interconnection study | Feasibility Study |
| DEOK Interconnection Request AI1-167 (Battery) | Storage | OH | 4.0 yrs | 250 MW | Interconnection study | Feasibility Study |
| JCPL Interconnection Request AI1-187 (Battery) | Storage | NJ | 4.0 yrs | 280 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AI1-172 (Solar+Battery) | Solar | IL | 4.0 yrs | 250 MW | Interconnection study | Feasibility Study |
| Dominion Interconnection Request AI1-203 (Solar) | Solar | VA | 4.0 yrs | 300 MW | Interconnection study | Feasibility Study |
| MIDAMERICAN ENERGY CO. Interconnection Request J2436 (Wind) | Wind (onshore) | IA | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| NORTHERN STATES POWER COMPANY Interconnection Request J2446 (Solar) | Solar | WI | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| Interconnection Request J2469 (Battery) | Storage | IA | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J3078 (Wind) | Wind (onshore) | IL | 4.0 yrs | 252 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2477 (Solar) | Solar | AR | 4.0 yrs | 600 MW | Interconnection study | Cluster Study |
| NORTHERN INDIANA PUBLIC SERVICE COMPANY Interconnection Request J2496 (Battery) | Storage | IN | 4.0 yrs | 400 MW | Interconnection study | Cluster Study |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J2423 (Battery) | Storage | WI | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| ENTERGY LOUISIANA Interconnection Request J2519 (Solar) | Solar | LA | 4.0 yrs | 600 MW | Interconnection study | Cluster Study |
| LAFAYETTE UTILITIES SYSTEM Interconnection Request J2791 (Gas) | Gas | LA | 4.0 yrs | 263 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2864 (Solar) | Solar | AR | 4.0 yrs | 375 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2866 (Solar) | Solar | AR | 4.0 yrs | 375 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2865 (Solar) | Solar | AR | 4.0 yrs | 375 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J3040 (Solar) | Solar | AR | 4.0 yrs | 365 MW | Interconnection study | Cluster Study |
| MIDAMERICAN ENERGY CO. Interconnection Request J2369 (Wind) | Wind (onshore) | IA | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| ENTERGY LOUISIANA Interconnection Request J2371 (Solar) | Solar | LA | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2395 (Solar) | Solar | AR | 4.0 yrs | 500 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2478 (Solar) | Solar | AR | 4.0 yrs | 550 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2482 (Solar) | Solar | AR | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2523 (Solar) | Solar | AR | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| MIDAMERICAN ENERGY CO. Interconnection Request J2556 (Solar) | Solar | IL | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J2565 (Solar) | Solar | IL | 4.0 yrs | 265 MW | Interconnection study | Cluster Study |
| ENTERGY MISSISSIPPI, LLC. Interconnection Request J2602 (Solar) | Solar | MS | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J2647 (Battery) | Storage | IL | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| ENTERGY LOUISIANA Interconnection Request J2708 (Solar) | Solar | LA | 4.0 yrs | 500 MW | Interconnection study | Cluster Study |
| Interconnection Request J2716 (Battery) | Storage | MN | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| ENTERGY LOUISIANA Interconnection Request J2704 (Solar) | Solar | LA | 4.0 yrs | 500 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J2793 (Solar) | Solar | IL | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| ENTERGY LOUISIANA Interconnection Request J2899 (Solar+Battery) | Solar | LA | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J2922 (Solar) | Solar | IL | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| ENTERGY LOUISIANA Interconnection Request J2914 (Solar+Battery) | Solar | LA | 4.0 yrs | 450 MW | Interconnection study | Cluster Study |
| Southern Indiana Gas & Electric Company d/b/a Centerpoint Energy Indiana South Interconnection Request J2931 (Solar) | Solar | KY | 4.0 yrs | 400 MW | Interconnection study | Cluster Study |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J3027 (Wind+Battery) | Wind (onshore) | IL | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J3015 (Wind+Battery) | Wind (onshore) | IL | 4.0 yrs | 400 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J3030 (Solar+Battery) | Solar | AR | 4.0 yrs | 450 MW | Interconnection study | Cluster Study |
| ENTERGY TEXAS, INC. Interconnection Request J3045 (Solar) | Solar | TX | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J3012 (Solar) | Solar | IL | 4.0 yrs | 287 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J3131 (Solar) | Solar | AR | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J2390 (Solar+Battery) | Solar | IL | 4.0 yrs | 350 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2396 (Solar) | Solar | AR | 4.0 yrs | 400 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J2603 (Solar) | Solar | IL | 4.0 yrs | 320 MW | Interconnection study | Cluster Study |
| DUKE ENERGY INDIANA Interconnection Request J2581 (Battery) | Storage | IN | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| ITC Interconnection Request J2590 (Battery) | Storage | MI | 4.0 yrs | 500 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2613 (Wind) | Wind (onshore) | AR | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| ITC Interconnection Request J2628 (Battery) | Storage | MI | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J2662 (Solar) | Solar | IL | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J2690 (Wind+Battery) | Wind (onshore) | IL | 4.0 yrs | 500 MW | Interconnection study | Cluster Study |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J2691 (Solar+Wind+Battery) | Wind (onshore) | MO | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J2694 (Solar+Wind+Battery) | Wind (onshore) | IL | 4.0 yrs | 500 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2696 (Solar) | Solar | AR | 4.0 yrs | 500 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2841 (Wind) | Wind (onshore) | AR | 4.0 yrs | 500 MW | Interconnection study | Cluster Study |
| NORTHERN INDIANA PUBLIC SERVICE COMPANY Interconnection Request J2846 (Solar) | Solar | IN | 4.0 yrs | 700 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J2907 (Solar+Battery) | Solar | AR | 4.0 yrs | 400 MW | Interconnection study | Cluster Study |
| ITC Interconnection Request J2921 (Solar) | Solar | MI | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J2944 (Gas) | Gas | WI | 4.0 yrs | 350 MW | Interconnection study | Cluster Study |
| AMEREN MISSOURI Interconnection Request J2945 (Gas) | Gas | IA | 4.0 yrs | 350 MW | Interconnection study | Cluster Study |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J2973 (Solar) | Solar | IL | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| Southern Indiana Gas & Electric Company d/b/a Centerpoint Energy Indiana South Interconnection Request J2970 (Solar) | Solar | IN | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| COOPERATIVE ENERGY Interconnection Request J2999 (Solar) | Solar | MS | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| MINNESOTA POWER INC. Interconnection Request J3002 (Solar+Battery) | Solar | MN | 4.0 yrs | 288 MW | Interconnection study | Cluster Study |
| CLECO POWER Interconnection Request J3014 (Solar) | Solar | LA | 4.0 yrs | 280 MW | Interconnection study | Cluster Study |
| MIDAMERICAN ENERGY CO. Interconnection Request J3047 (Gas) | Gas | IA | 4.0 yrs | 263 MW | Interconnection study | Cluster Study |
| HOOSIER ENERGY Interconnection Request J3075 (Solar+Battery) | Solar | IN | 4.0 yrs | 560 MW | Interconnection study | Cluster Study |
| Southern Indiana Gas & Electric Company d/b/a Centerpoint Energy Indiana South Interconnection Request J3077 (Solar+Battery) | Solar | IN | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| DUKE ENERGY INDIANA Interconnection Request J3076 (Solar+Battery) | Solar | IL | 4.0 yrs | 500 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J3074 (Solar) | Solar | IL | 4.0 yrs | 250 MW | Interconnection study | Cluster Study |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J3199 (Solar+Battery) | Solar | MO | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| CLECO POWER Interconnection Request J3209 (Solar) | Solar | LA | 4.0 yrs | 350 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J3192 (Solar) | Solar | AR | 4.0 yrs | 500 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request J3216 (Battery) | Storage | IL | 4.0 yrs | 300 MW | Interconnection study | Cluster Study |
| Interconnection Request 25INR0195 (Solar+Battery) | Solar | TX | 4.0 yrs | 300 MW | Interconnection study | Facility Study |
| Interconnection Request G0807 (Other Storage) | Storage | OR | 4.0 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0811 (Other) | Other | OR | 4.0 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0808 (Battery) | Storage | OR | 4.0 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0812 (Battery) | Storage | OR | 4.0 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0806 (Other) | Other | OR | 4.0 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Sacramento Municipal Utility District Interconnection Request 26 (Solar+Battery) | Solar | CA | 4.0 yrs | 275 MW | Interconnection study | Facility Study |
| Public Service Company (CO PUC Docket 22A-0408E) | Other | CO | 4.0 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 25INR0207 (Solar) | Solar | TX | 3.9 yrs | 808 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0019 (Solar) | Solar | TX | 3.9 yrs | 347 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q480 (Solar+Battery) | Solar | AZ | 3.9 yrs | 400 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q486 (Solar+Battery) | Solar | AZ | 3.9 yrs | 400 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q488 (Solar+Battery) | Solar | AZ | 3.9 yrs | 600 MW | Interconnection study | Cluster Study |
| Anbaric Development Partners, LLC, Pursuant to Public Service Law Article VII (NY DPS Case 22-T-0547) | Transmission | NY | 3.9 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 24INR0412 (Solar+Battery) | Solar | TX | 3.9 yrs | 296 MW | Interconnection study | Facility Study |
| Interconnection Request 25INR0177 (Wind) | Wind (onshore) | TX | 3.9 yrs | 302 MW | Interconnection study | Facility Study |
| WAPA Rocky Mountain Region Interconnection Request 2023-G1 (Solar+Battery) | Solar | — | 3.9 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| New York Power Authority and Clean Path New York LLC (NY DPS Case 22-T-0558) | Transmission | NY | 3.9 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 24INR0420 (Solar+Battery) | Solar | TX | 3.9 yrs | 298 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0028 (Solar) | Solar | TX | 3.9 yrs | 302 MW | Interconnection study | Facility Study |
| SCS Carbon Transport LLC (ND PSC PU-22-391) | Gas | ND | 3.9 yrs | Not disclosed | Local/state review | — |
| GridLiance West LLC (NV PUCN Docket 22-10013) | Transmission | NV | 3.9 yrs | Not disclosed | Local/state review | — |
| Public Service Company of New Mexico Interconnection Request IA-PNM-2023-01 (Wind) | Wind (onshore) | NM | 3.9 yrs | 250 MW | Interconnection study | Cluster Study |
| BEPC Interconnection Request GEN-2022-083 (Gas) | Gas | ND | 3.9 yrs | 250 MW | Interconnection study | Facility Study |
| Commonwealth Wind, LLC (MA EFSB EFSB22-06) | Transmission | MA | 3.8 yrs | Not disclosed | Local/state review | — |
| NorthWestern Energy Interconnection Request 435 (Solar+Battery) | Solar | MT | 3.8 yrs | 800 MW | Interconnection study | Facility Study |
| Interconnection Request 25INR0152 (Solar+Battery) | Solar | TX | 3.8 yrs | 402 MW | Interconnection study | Facility Study |
| Interconnection Request G0822 (Solar+Battery) | Solar | WA | 3.8 yrs | 2,000 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 24INR0444 (Solar+Battery) | Solar | TX | 3.8 yrs | 504 MW | Interconnection study | Facility Study |
| Niagara Mohawk Power Corporation d/b/a National Grid (NY DPS Case 22-T-0654) | Other | NY | 3.8 yrs | Not disclosed | Local/state review | — |
| Interconnection Request G0825 (Solar+Battery) | Solar | OR | 3.8 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0826 (Solar+Battery) | Solar | OR | 3.8 yrs | 280 MW | Interconnection study | In Progress (unknown study) |
| Imperial Irrigation District Interconnection Request GI-2022-164 (Solar+Battery) | Solar | CA | 3.8 yrs | 800 MW | Interconnection study | In Progress (unknown study) |
| Hop Hill Solar (WA EFSEC) | Solar | WA | 3.8 yrs | 500 MW | Local/state review | — |
| Queensboro Development, LLC (NY DPS Case 22-T-0670) | Transmission | NY | 3.8 yrs | Not disclosed | Local/state review | — |
| Tucson Electric Power Company Interconnection Request 145 (Solar+Battery) | Solar | AZ | 3.7 yrs | 300 MW | Interconnection study | — |
| Los Angeles Department of Water and Power Interconnection Request Q94 (Solar+Battery) | Solar | UT | 3.7 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company of Colorado (CO PUC Docket 22A-0563E) | Other | CO | 3.7 yrs | Not disclosed | Local/state review | — |
| NORTHERN STATES POWER COMPANY Interconnection Request R1036 (Solar+Other) | Solar | MN | 3.7 yrs | 710 MW | Interconnection study | — |
| Public Service Company of New Mexico Interconnection Request IA-PNM-2023-08 (Wind+Battery) | Wind (onshore) | NM | 3.7 yrs | 300 MW | Interconnection study | Cluster Study |
| GGSO, LLC (Gage Solar) (KY PSC Case 2023-00369) | Solar | KY | 3.7 yrs | 240 MW | Local/state review | — |
| Northern Bobwhite Solar, LLC (KY PSC Case 2023-00160) | Transmission | KY | 3.7 yrs | Not disclosed | Local/state review | — |
| Public Service Company of New Mexico Interconnection Request IA-PNM-2023-07 (Solar) | Solar | NM | 3.7 yrs | 300 MW | Interconnection study | Cluster Study |
| Public Service Company of New Mexico Interconnection Request IA-PNM-2023-11 (Battery) | Storage | NM | 3.7 yrs | 500 MW | Interconnection study | Cluster Study |
| Interconnection Request 25INR0288 (Solar+Battery) | Solar | TX | 3.7 yrs | 308 MW | Interconnection study | Facility Study |
| ONEOK Rockies Midstream, L.L.C. (ND PSC PU-23-015) | Gas | ND | 3.7 yrs | Not disclosed | Local/state review | — |
| NV Energy Interconnection Request Company OI (Solar+Battery) | Solar | NV | 3.7 yrs | 380 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 26INR0045 (Battery) | Storage | TX | 3.6 yrs | 408 MW | Interconnection study | Facility Study |
| NV Energy Interconnection Request Company 238 (Solar+Battery) | Solar | NV | 3.6 yrs | 1,000 MW | Interconnection study | In Progress (unknown study) |
| Chelsea Solar LLC (VT 23-0249-PET) | Solar | VT | 3.6 yrs | 2 MW | Local/state review | — |
| Interconnection Request 25INR0339 (Battery) | Storage | TX | 3.6 yrs | 251 MW | Interconnection study | Facility Study |
| Carriger Solar (WA EFSEC) | Solar | WA | 3.6 yrs | 160 MW | Local/state review | — |
| Jefferson Davis Electric Cooperative, Inc (LA PSC Docket U-36661) | Transmission | LA | 3.6 yrs | Not disclosed | Local/state review | — |
| WAPA Desert Southwest Region Interconnection Request 2023-MP1 (Solar+Battery) | Solar | AZ | 3.6 yrs | 500 MW | Interconnection study | — |
| Imperial Irrigation District Interconnection Request GI-2023-167 (Solar+Battery) | Solar | CA | 3.6 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0840 (Solar+Battery) | Solar | WA | 3.6 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 24INR0500 (Battery) | Storage | TX | 3.6 yrs | 406 MW | Interconnection study | Facility Study |
| Interconnection Request G0841 (Solar+Battery) | Solar | OR | 3.6 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 25INR0196 (Solar+Battery) | Solar | TX | 3.5 yrs | 281 MW | Interconnection study | Facility Study |
| Interconnection Request 25INR0197 (Solar+Battery) | Solar | TX | 3.5 yrs | 287 MW | Interconnection study | Facility Study |
| AEP Interconnection Request GEN-2022-139 (Battery) | Storage | TX | 3.5 yrs | 300 MW | Interconnection study | Facility Study |
| Interconnection Request G0844 (Solar+Battery) | Solar | WA | 3.5 yrs | 280 MW | Interconnection study | In Progress (unknown study) |
| JCPL Interconnection Request AI2-068 (Battery) | Storage | NJ | 3.5 yrs | 250 MW | Interconnection study | Feasibility Study |
| JCPL Interconnection Request AI2-069 (Battery) | Storage | NJ | 3.5 yrs | 250 MW | Interconnection study | Feasibility Study |
| WERE Interconnection Request GEN-2022-161 (Wind) | Wind (onshore) | KS | 3.5 yrs | 360 MW | Interconnection study | Facility Study |
| AEP Interconnection Request AI2-081 (Solar) | Solar | OH | 3.5 yrs | 271 MW | Interconnection study | Feasibility Study |
| Interconnection Request 25INR0331 (Solar+Battery) | Solar | TX | 3.5 yrs | 251 MW | Interconnection study | Facility Study |
| WAPA Sierra Nevada Interconnection Request 2023-G2 (Solar+Battery) | Solar | CA | 3.5 yrs | 800 MW | Interconnection study | In Progress (unknown study) |
| WAPA Sierra Nevada Interconnection Request 2023-G1 (Solar+Battery) | Solar | CA | 3.5 yrs | 800 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q96 (Solar+Battery) | Solar | CA | 3.5 yrs | 1,000 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q97 (Solar+Battery) | Solar | CA | 3.5 yrs | 1,000 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q98 (Solar+Battery) | Solar | CA | 3.5 yrs | 1,500 MW | Interconnection study | In Progress (unknown study) |
| Portland General Electric Interconnection Request 23-221 (Battery) | Storage | OR | 3.5 yrs | 400 MW | Interconnection study | Cluster Study |
| Portland General Electric Interconnection Request 23-226 (Wind) | Wind (onshore) | OR | 3.5 yrs | 250 MW | Interconnection study | Cluster Study |
| Portland General Electric Interconnection Request 23-227 (Wind) | Wind (onshore) | OR | 3.5 yrs | 250 MW | Interconnection study | Cluster Study |
| Portland General Electric Interconnection Request 23-228 (Wind) | Wind (onshore) | OR | 3.5 yrs | 250 MW | Interconnection study | Cluster Study |
| Portland General Electric Interconnection Request 23-229 (Solar+Wind+Battery) | Wind (onshore) | OR | 3.5 yrs | 750 MW | Interconnection study | Cluster Study |
| ROCK DISTRICT SOLAR, LLC (NY DPS Case 23-02971) | Solar | NY | 3.5 yrs | 20 MW | Local/state review | — |
| Portland General Electric Interconnection Request 23-231 (Wind) | Wind (onshore) | OR | 3.5 yrs | 250 MW | Interconnection study | Cluster Study |
| Interconnection Request 25INR0297 (Solar+Battery) | Solar | TX | 3.5 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 1365 (Battery) | Storage | MA | 3.5 yrs | 250 MW | Interconnection study | Feasibility Study |
| Interconnection Request 24INR0508 (Wind) | Wind (onshore) | TX | 3.5 yrs | 607 MW | Interconnection study | Facility Study |
| JCPL Interconnection Request AI2-431 (Offshore Wind) | Wind (offshore) | NJ | 3.5 yrs | 2,139 MW | Interconnection study | Feasibility Study |
| APS Interconnection Request AI2-443 (Solar+Battery) | Solar | PA | 3.5 yrs | 300 MW | Interconnection study | Feasibility Study |
| PEPCO Interconnection Request AI2-457 (Battery) | Storage | MD | 3.5 yrs | 1,122 MW | Interconnection study | Feasibility Study |
| Entergy Louisiana, LLC (LA PSC Docket U-36697) | Solar | LA | 3.5 yrs | 3,000 MW | Local/state review | — |
| KUMQUAT & CITRON CLEANTECH, LLC (MD PSC Case No. 9694) | Solar | MD | 3.5 yrs | 7.2 MW | Local/state review | — |
| Arizona Public Service Interconnection Request Q497 (Wind) | Wind (onshore) | AZ | 3.5 yrs | 300 MW | Interconnection study | Cluster Study |
| Interconnection Request G0849 (Solar+Battery) | Solar | OR | 3.5 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0850 (Solar+Battery) | Solar | OR | 3.5 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| WAPA Desert Southwest Region Interconnection Request 2023-MP2 (Solar+Battery) | Solar | AZ | 3.5 yrs | 600 MW | Interconnection study | — |
| Interconnection Request G0853 (Solar+Battery) | Solar | WA | 3.5 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 27INR0020 (Solar+Battery) | Solar | TX | 3.4 yrs | 364 MW | Interconnection study | Facility Study |
| NV Energy Interconnection Request Company 250 (Other Storage) | Storage | NV | 3.4 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request Company PR (Solar+Battery) | Solar | NV | 3.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Tennessee Valley Authority Interconnection Request 536 (Solar) | Solar | KY | 3.4 yrs | 250 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q528 (Solar+Battery) | Solar | AZ | 3.4 yrs | 500 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q519 (Gas) | Gas | AZ | 3.4 yrs | 350 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q507 (Solar+Battery) | Solar | AZ | 3.4 yrs | 400 MW | Interconnection study | Cluster Study |
| Imperial Irrigation District Interconnection Request GI-2023-168 (Battery) | Storage | CA | 3.4 yrs | 387 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 26INR0089 (Battery) | Storage | TX | 3.4 yrs | 508 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0110 (Solar+Battery) | Solar | TX | 3.4 yrs | 410 MW | Interconnection study | Facility Study |
| Interconnection Request G0854 (Solar+Wind) | Wind (onshore) | OR | 3.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q101 (Wind+Battery) | Wind (onshore) | CA | 3.4 yrs | 1,000 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q100 (Wind+Battery) | Wind (onshore) | CA | 3.4 yrs | 1,000 MW | Interconnection study | In Progress (unknown study) |
| SCE Interconnection Request 2325 (Battery) | Storage | CA | 3.4 yrs | 506 MW | Interconnection study | Not Started |
| PG&E Interconnection Request 2239 (Battery) | Storage | CA | 3.4 yrs | 1,168 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2320 (Battery) | Storage | CA | 3.4 yrs | 518 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2313 (Solar) | Solar | CA | 3.4 yrs | 305 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2285 (Battery) | Storage | CA | 3.4 yrs | 404 MW | Interconnection study | Not Started |
| SDGE Interconnection Request 2224 (Wind) | Wind (onshore) | MX | 3.4 yrs | 309 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2327 (Battery) | Storage | CA | 3.4 yrs | 1,065 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2329 (Solar) | Solar | CA | 3.4 yrs | 507 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2323 (Battery) | Storage | CA | 3.4 yrs | 514 MW | Interconnection study | Not Started |
| GLW Interconnection Request 2215 (Solar) | Solar | NV | 3.4 yrs | 305 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2264 (Battery) | Storage | CA | 3.4 yrs | 258 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2297 (Battery) | Storage | CA | 3.4 yrs | 318 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2305 (Solar) | Solar | CA | 3.4 yrs | 353 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2219 (Solar) | Solar | CA | 3.4 yrs | 352 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2368 (Solar) | Solar | CA | 3.4 yrs | 307 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2263 (Battery) | Storage | CA | 3.4 yrs | 308 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2216 (Battery) | Storage | CA | 3.4 yrs | 258 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2259 (Solar) | Solar | CA | 3.4 yrs | 414 MW | Interconnection study | Not Started |
| GLW Interconnection Request 2273 (Solar) | Solar | NV | 3.4 yrs | 354 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2246 (Battery) | Storage | CA | 3.4 yrs | 353 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2286 (Battery) | Storage | CA | 3.4 yrs | 514 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2247 (Battery) | Storage | CA | 3.4 yrs | 353 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2319 (Solar+Battery) | Solar | CA | 3.4 yrs | 614 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2236 (Battery) | Storage | CA | 3.4 yrs | 519 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2294 (Battery) | Storage | CA | 3.4 yrs | 1,029 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2352 (Battery) | Storage | CA | 3.4 yrs | 514 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2244 (Battery) | Storage | CA | 3.4 yrs | 257 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2293 (Battery) | Storage | CA | 3.4 yrs | 461 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2322 (Battery) | Storage | CA | 3.4 yrs | 505 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2350 (Battery) | Storage | CA | 3.4 yrs | 1,029 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2311 (Solar) | Solar | CA | 3.4 yrs | 562 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2306 (Other Storage) | Storage | CA | 3.4 yrs | 517 MW | Interconnection study | Not Started |
| SDGE Interconnection Request 2210 (Solar) | Solar | AZ | 3.4 yrs | 559 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2333 (Battery) | Storage | CA | 3.4 yrs | 514 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2317 (Battery) | Storage | CA | 3.4 yrs | 304 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2349 (Gas+Battery) | Storage | CA | 3.4 yrs | 600 MW | Interconnection study | Not Started |
| SDGE Interconnection Request 2207 (Solar+Battery) | Solar | AZ | 3.4 yrs | 500 MW | Interconnection study | Not Started |
| WAPA Interconnection Request 2308 (Solar+Battery) | Solar | CA | 3.4 yrs | 816 MW | Interconnection study | Not Started |
| GLW Interconnection Request 2257 (Solar+Battery) | Solar | NV | 3.4 yrs | 461 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2351 (Gas+Battery) | Storage | CA | 3.4 yrs | 300 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2356 (Solar+Battery) | Solar | CA | 3.4 yrs | 305 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2268 (Solar+Battery) | Solar | CA | 3.4 yrs | 288 MW | Interconnection study | Not Started |
| PG&E Interconnection Request 2248 (Solar+Battery) | Solar | CA | 3.4 yrs | 255 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2267 (Solar+Battery) | Solar | CA | 3.4 yrs | 869 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2266 (Solar+Battery) | Solar | CA | 3.4 yrs | 1,170 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2361 (Solar+Battery) | Solar | CA | 3.4 yrs | 407 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2362 (Solar+Battery) | Solar | CA | 3.4 yrs | 308 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2336 (Solar+Battery) | Solar | CA | 3.4 yrs | 304 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2234 (Solar+Battery) | Solar | CA | 3.4 yrs | 946 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2298 (Solar+Battery) | Solar | CA | 3.4 yrs | 306 MW | Interconnection study | Not Started |
| PG&E Interconnection Request 2250 (Solar+Battery) | Solar | CA | 3.4 yrs | 377 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2370 (Solar+Battery) | Solar | CA | 3.4 yrs | 416 MW | Interconnection study | Not Started |
| PG&E Interconnection Request 2252 (Solar+Battery) | Solar | CA | 3.4 yrs | 556 MW | Interconnection study | Not Started |
| PG&E Interconnection Request 2254 (Solar+Battery) | Solar | CA | 3.4 yrs | 606 MW | Interconnection study | Not Started |
| DCRT Interconnection Request 2331 (Solar+Battery) | Solar | AZ | 3.4 yrs | 1,039 MW | Interconnection study | Not Started |
| PG&E Interconnection Request 2260 (Solar+Battery) | Solar | CA | 3.4 yrs | 372 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2240 (Solar+Battery) | Solar | CA | 3.4 yrs | 715 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2342 (Solar+Battery) | Solar | CA | 3.4 yrs | 367 MW | Interconnection study | Not Started |
| PGAE Interconnection Request 2328 (Solar+Battery) | Solar | CA | 3.4 yrs | 419 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2312 (Solar+Battery) | Solar | CA | 3.4 yrs | 524 MW | Interconnection study | Not Started |
| SCE Interconnection Request 2366 (Solar+Wind+Battery) | Wind (onshore) | CA | 3.4 yrs | 405 MW | Interconnection study | Not Started |
| Morton Bay Geothermal Project (MBGP) | Geothermal | CA | 3.4 yrs | 140 MW | Local/state review | — |
| Black Rock Geothermal Project (BRGP) | Geothermal | CA | 3.4 yrs | 77 MW | Local/state review | — |
| Elmore North Geothermal Project (ENGP) | Geothermal | CA | 3.4 yrs | 140 MW | Local/state review | — |
| Interconnection Request 25INR0417 (Battery) | Storage | TX | 3.4 yrs | 251 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0114 (Battery) | Storage | TX | 3.4 yrs | 260 MW | Interconnection study | Facility Study |
| Interconnection Request G0861 (Wind) | Wind (onshore) | OR | 3.4 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| CONNECTGEN MONTGOMERY COUNTY, LLC (NY DPS Case 23-02972) | Solar | NY | 3.4 yrs | 250 MW | Local/state review | — |
| SKAGIT RIVER (FERC No. P-553) | Hydro | WA | 3.4 yrs | 700 MW | Agency permitting | — |
| PacifiCorp Interconnection Request C3-036 (Solar+Battery) | Solar | UT | 3.3 yrs | 500 MW | Interconnection study | Facility Study |
| DEOK Interconnection Request AJ1-008 (Solar+Battery) | Solar | OH | 3.3 yrs | 800 MW | Interconnection study | Feasibility Study |
| Otter Tail Power Company (ND PSC PU-23-176) | Wind (onshore) | ND | 3.3 yrs | Not disclosed | Local/state review | — |
| Interconnection Request G0862 (Battery) | Storage | OR | 3.3 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0863 (Battery) | Storage | OR | 3.3 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0864 (Solar+Wind+Battery) | Wind (onshore) | OR | 3.3 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 25INR0238 (Battery) | Storage | TX | 3.3 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0082 (Solar+Battery) | Solar | TX | 3.3 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0008 (Solar+Battery) | Solar | TX | 3.3 yrs | 504 MW | Interconnection study | Facility Study |
| ComEd Interconnection Request AJ1-011 (Battery) | Storage | IL | 3.3 yrs | 328 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AJ1-014 (Battery) | Storage | IL | 3.3 yrs | 260 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AJ1-012 (Battery) | Storage | IL | 3.3 yrs | 354 MW | Interconnection study | Feasibility Study |
| ComEd Interconnection Request AJ1-013 (Battery) | Storage | IL | 3.3 yrs | 250 MW | Interconnection study | Feasibility Study |
| Interconnection Request 25INR0451 (Solar+Battery) | Solar | TX | 3.3 yrs | 290 MW | Interconnection study | Facility Study |
| Interconnection Request G0866 (Solar) | Solar | OR | 3.3 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| JCPL Interconnection Request AJ1-015 (Offshore Wind) | Wind (offshore) | NJ | 3.3 yrs | 1,342 MW | Interconnection study | Feasibility Study |
| PacifiCorp Interconnection Request PIS040 (Gas) | Gas | UT | 3.3 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 24INR0567 (Gas) | Gas | TX | 3.3 yrs | 306 MW | Interconnection study | Facility Study |
| Interconnection Request 25INR0301 (Battery) | Storage | TX | 3.3 yrs | 257 MW | Interconnection study | Facility Study |
| NY NORTH COUNTRY, LLC (NY DPS Case 23-02973) | Wind (onshore) | NY | 3.3 yrs | 385 MW | Local/state review | — |
| BULL RUN ENERGY, LLC (NY DPS Case 23-02975) | Wind (onshore) | NY | 3.3 yrs | 449 MW | Local/state review | — |
| NORTH SENECA SOLAR PROJECT, LLC (NY DPS Case 23-02974) | Solar | NY | 3.3 yrs | 90 MW | Local/state review | — |
| Los Angeles Department of Water and Power Interconnection Request Q104 (Solar+Battery) | Solar | UT | 3.2 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q105 (Solar+Battery) | Solar | UT | 3.2 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| HOFFMAN FALLS WIND, LLC (NY DPS Case 23-02976) | Wind (onshore) | NY | 3.2 yrs | 100 MW | Local/state review | — |
| Tennessee Valley Authority Interconnection Request 569 (Gas) | Gas | MS | 3.2 yrs | 620 MW | Interconnection study | Facility Study |
| WAPA Rocky Mountain Region Interconnection Request 2023-G5.2 (Solar+Battery) | Solar | — | 3.2 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Portland General Electric Interconnection Request 23-234 (Solar+Battery) | Solar | OR | 3.2 yrs | 800 MW | Interconnection study | Cluster Study |
| Portland General Electric Interconnection Request 23-233 (Solar+Battery) | Solar | OR | 3.2 yrs | 800 MW | Interconnection study | Cluster Study |
| Invenergy Solar Development LLC (NY DPS Case 23-02983) | Solar | NY | 3.2 yrs | Not disclosed | Local/state review | — |
| Verona Solar LLC (NY DPS Case 23-02982) | Solar | NY | 3.2 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 25INR0434 (Battery) | Storage | TX | 3.2 yrs | 251 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0143 (Solar) | Solar | TX | 3.2 yrs | 265 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0107 (Battery) | Storage | TX | 3.2 yrs | 502 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0183 (Gas) | Gas | TX | 3.2 yrs | 453 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0061 (Wind) | Wind (onshore) | TX | 3.2 yrs | 1,542 MW | Interconnection study | Facility Study |
| Interconnection Request 30INR0003 (Wind) | Wind (onshore) | TX | 3.2 yrs | 1,029 MW | Interconnection study | Facility Study |
| Interconnection Request 30INR0004 (Wind) | Wind (onshore) | TX | 3.2 yrs | 1,029 MW | Interconnection study | Facility Study |
| FOOTHILLS SOLAR, LLC (NY DPS Case 23-02984) | Solar | NY | 3.2 yrs | 40 MW | Local/state review | — |
| Interconnection Request G0871 (Wind) | Wind (onshore) | OR | 3.2 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0870 (Wind) | Wind (onshore) | OR | 3.2 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0872 (Wind) | Wind (onshore) | WA | 3.2 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| EDF Renewables Development, Inc (NY DPS Case 23-02985) | Solar | NY | 3.2 yrs | Not disclosed | Local/state review | — |
| TransWest Express LLC (NV PUCN Docket 23-06046) | Transmission | NV | 3.2 yrs | Not disclosed | Local/state review | — |
| WAPA Desert Southwest Region Interconnection Request 2023-G8 (Solar+Battery) | Solar | AZ | 3.2 yrs | 250 MW | Interconnection study | — |
| WAPA Desert Southwest Region Interconnection Request 2023-G9 (Solar+Battery) | Solar | AZ | 3.2 yrs | 250 MW | Interconnection study | — |
| Interconnection Request G0908 (Solar+Battery) | Solar | OR | 3.1 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0914 (Battery) | Storage | WA | 3.1 yrs | 1,000 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0915 (Battery) | Storage | WA | 3.1 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0916 (Battery) | Storage | WA | 3.1 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| YORK RUN SOLAR, LLC (NY DPS Case 23-02987) | Solar | NY | 3.1 yrs | 90 MW | Local/state review | — |
| YELLOW BARN SOLAR, LLC (NY DPS Case 23-02986) | Solar | NY | 3.1 yrs | 160 MW | Local/state review | — |
| Interconnection Request 28INR0005 (Solar) | Solar | TX | 3.1 yrs | 359 MW | Interconnection study | Facility Study |
| Worth Wind Project [95-MW] (NY DPS Case 23-02988) | Wind (onshore) | NY | 3.1 yrs | 95 MW | Local/state review | — |
| EDF Renewables Development, Inc (NY DPS Case 23-02989) | Solar | NY | 3.1 yrs | Not disclosed | Local/state review | — |
| TWO RIVERS SOLAR FARM, LLC (NY DPS Case 23-02991) | Solar | NY | 3.1 yrs | 200 MW | Local/state review | — |
| Flat Creek Solar NY LLC (NY DPS Case 23-02992) | Solar | NY | 3.1 yrs | 300 MW | Local/state review | — |
| FORT COVINGTON SOLAR, LLC (NY DPS Case 23-02990) | Solar | NY | 3.1 yrs | 250 MW | Local/state review | — |
| ELP ROTTERDAM SOLAR, LLC (NY DPS Case 23-02994) | Solar | NY | 3.1 yrs | 20 MW | Local/state review | — |
| Newport Deerfield Solar LLC (NY DPS Case 23-02996) | Solar | NY | 3.1 yrs | Not disclosed | Local/state review | — |
| Silverline Energy Center, LLC (NY DPS Case 23-02995) | Other | NY | 3.1 yrs | Not disclosed | Local/state review | — |
| WHITE CREEK SOLAR, LLC (NY DPS Case 23-02997) | Solar | NY | 3.1 yrs | 135 MW | Local/state review | — |
| Salt River Project Interconnection Request Q32 (Gas+Battery) | Storage | AZ | 3.1 yrs | 488 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q32 (Gas+Battery) | Storage | AZ | 3.1 yrs | 488 MW | Interconnection study | — |
| OXBOW HILL SOLAR, LLC (NY DPS Case 23-02998) | Solar | NY | 3.1 yrs | 140 MW | Local/state review | — |
| Interconnection Request 26INR0171 (Solar) | Solar | TX | 3.0 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0172 (Solar) | Solar | TX | 3.0 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0174 (Battery) | Storage | TX | 3.0 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request G0919 (Nuclear) | Nuclear | WA | 3.0 yrs | 270 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0918 (Wind) | Wind (onshore) | OR | 3.0 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Arcade Solar, LLC [75MW] (NY DPS Case 23-03000) | Solar | NY | 3.0 yrs | 75 MW | Local/state review | — |
| Niagara Dolomite Solar, LLC [180 MW] (NY DPS Case 23-02999) | Solar | NY | 3.0 yrs | 180 MW | Local/state review | — |
| Interconnection Request G0920 (Solar+Battery) | Solar | WA | 3.0 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| WAPA Desert Southwest Region Interconnection Request 2023-G11 (Solar+Battery) | Solar | AZ | 3.0 yrs | 300 MW | Interconnection study | — |
| Interconnection Request G0921 (Wind+Battery) | Wind (onshore) | WA | 3.0 yrs | 357 MW | Interconnection study | In Progress (unknown study) |
| EDF Renewables Development, Inc (NY DPS Case 23-03001) | Solar | NY | 3.0 yrs | Not disclosed | Local/state review | — |
| AGRICOLA WIND, LLC (NY DPS Case 23-03002) | Wind (onshore) | NY | 3.0 yrs | 99 MW | Local/state review | — |
| Arizona Public Service Interconnection Request Q537 (Solar+Battery) | Solar | AZ | 3.0 yrs | 400 MW | Interconnection study | Cluster Study |
| Interconnection Request G0932 (Solar+Battery) | Solar | WA | 3.0 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0933 (Solar+Battery) | Solar | WA | 3.0 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 26INR0173 (Battery) | Storage | TX | 3.0 yrs | 252 MW | Interconnection study | Facility Study |
| Columbia Solar Energy Center, LLC (NY DPS Case 23-03003) | Solar | NY | 3.0 yrs | 20 MW | Local/state review | — |
| Arizona Public Service Interconnection Request Q539 (Wind) | Wind (onshore) | AZ | 3.0 yrs | 500 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q538 (Wind) | Wind (onshore) | AZ | 3.0 yrs | 500 MW | Interconnection study | Cluster Study |
| 1803 Electric Cooperative, Inc (LA PSC Docket U-36974) | Other | LA | 3.0 yrs | Not disclosed | Local/state review | — |
| Warner Hill Solar [20 MW] (NY DPS Case 23-03004) | Solar | NY | 3.0 yrs | 20 MW | Local/state review | — |
| Idaho Power Company Interconnection Request 737 (Solar) | Solar | ID | 3.0 yrs | 280 MW | Interconnection study | Cluster Study |
| Grant County Public Utility District Interconnection Request 9 (Solar+Battery) | Solar | WA | 3.0 yrs | 300 MW | Interconnection study | System Impact Study |
| Interconnection Request 27INR0086 (Solar+Battery) | Solar | TX | 3.0 yrs | 614 MW | Interconnection study | Facility Study |
| Gateway Solar Energy Center, LLC [180 MW] (NY DPS Case 23-03005) | Solar | NY | 3.0 yrs | 180 MW | Local/state review | — |
| GridLiance West LLC (NV PUCN Docket 23-09020) | Transmission | NV | 3.0 yrs | Not disclosed | Local/state review | — |
| NV Energy Interconnection Request Company 255 (Solar+Battery) | Solar | NV | 3.0 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request Company 254 (Solar+Battery) | Solar | NV | 3.0 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request Company 256 (Solar+Battery) | Solar | NV | 3.0 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Minnkota Power Cooperative Interconnection Request MPC04500 (Wind) | Wind (onshore) | ND | 2.9 yrs | 258 MW | Interconnection study | Feasibility Study |
| NV Energy Interconnection Request Company 257 (Battery) | Storage | NV | 2.9 yrs | 800 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 27INR0077 (Solar+Battery) | Solar | TX | 2.9 yrs | 307 MW | Interconnection study | Facility Study |
| Interconnection Request G0941 (Battery) | Storage | OR | 2.9 yrs | 488 MW | Interconnection study | In Progress (unknown study) |
| Grant County Public Utility District Interconnection Request 10 (Solar+Battery) | Solar | WA | 2.9 yrs | 300 MW | Interconnection study | System Impact Study |
| Public Service Company of New Mexico Interconnection Request IA-PNM-2023-30 (Solar+Battery) | Solar | NM | 2.9 yrs | 250 MW | Interconnection study | Cluster Study |
| SPS Interconnection Request GEN-2023-015 (Solar) | Solar | KS | 2.9 yrs | 330 MW | Interconnection study | Facility Study |
| OPPD Interconnection Request GEN-2023-078 (Gas) | Gas | NE | 2.9 yrs | 255 MW | Interconnection study | Facility Study |
| OPPD Interconnection Request GEN-2023-077 (Gas) | Gas | NE | 2.9 yrs | 255 MW | Interconnection study | Facility Study |
| WERE Interconnection Request GEN-2023-099 (Solar) | Solar | KS | 2.9 yrs | 300 MW | Interconnection study | Facility Study |
| SUNC Interconnection Request GEN-2023-107 (Wind) | Wind (onshore) | KS | 2.9 yrs | 300 MW | Interconnection study | Facility Study |
| OGE Interconnection Request GEN-2023-102 (Solar+Battery) | Solar | OK | 2.9 yrs | 475 MW | Interconnection study | Facility Study |
| NPPD Interconnection Request GEN-2023-199 (Solar+Battery) | Solar | NE | 2.9 yrs | 250 MW | Interconnection study | Facility Study |
| OPPD Interconnection Request GEN-2023-079 (Gas) | Gas | NE | 2.9 yrs | 273 MW | Interconnection study | Facility Study |
| WERE Interconnection Request GEN-2023-221 (Solar) | Solar | KS | 2.9 yrs | 250 MW | Interconnection study | Facility Study |
| AEP Interconnection Request GEN-2023-204 (Gas) | Gas | TX | 2.9 yrs | 915 MW | Interconnection study | Facility Study |
| WERE Interconnection Request GEN-2023-220 (Solar) | Solar | KS | 2.9 yrs | 250 MW | Interconnection study | Facility Study |
| NPPD Interconnection Request GEN-2023-224 (Gas) | Gas | NE | 2.9 yrs | 478 MW | Interconnection study | Facility Study |
| NPPD Interconnection Request GEN-2023-222 (Gas) | Gas | NE | 2.9 yrs | 478 MW | Interconnection study | Facility Study |
| Application of Boralex US Development, LLC, to Construct and Operate the Diamond (NY DPS Case 23-03013) | Solar | NY | 2.9 yrs | Not disclosed | Local/state review | — |
| Interconnection Request G0944 (Solar) | Solar | OR | 2.9 yrs | 261 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 23INR0368 (Solar) | Solar | TX | 2.9 yrs | 602 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0087 (Solar+Battery) | Solar | TX | 2.9 yrs | 507 MW | Interconnection study | Facility Study |
| Public Service Company of Colorado (CO PUC Docket 23A-0494E) | Other | CO | 2.9 yrs | Not disclosed | Local/state review | — |
| Cayuga Lake Solar, LLC a Subsidiary of AES Clean Energy Development, LLC (NY DPS Case 23-03014) | Solar | NY | 2.9 yrs | Not disclosed | Local/state review | — |
| Interconnection Request G0946 (Battery) | Storage | OR | 2.9 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0953 (Wind) | Wind (onshore) | WA | 2.9 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0954 (Wind) | Wind (onshore) | WA | 2.9 yrs | 350 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0947 (Battery) | Storage | OR | 2.9 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0948 (Battery) | Storage | OR | 2.9 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| WEB Addison Solar, LLC (NY DPS Case 23-03015) | Solar | NY | 2.9 yrs | 105 MW | Local/state review | — |
| Interconnection Request G0955 (Wind) | Wind (onshore) | WA | 2.9 yrs | 350 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0956 (Wind) | Wind (onshore) | ID | 2.9 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0965 (Battery) | Storage | OR | 2.9 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0963 (Battery) | Storage | OR | 2.9 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Alabama Solar Park LLC (NY DPS Case 23-03016) | Solar | NY | 2.9 yrs | 130 MW | Local/state review | — |
| Interconnection Request 1460 (Battery) | Storage | MA | 2.9 yrs | 350 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 26INR0230 (Solar) | Solar | TX | 2.9 yrs | 502 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0211 (Solar) | Solar | TX | 2.9 yrs | 338 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0277 (Solar+Battery) | Solar | TX | 2.9 yrs | 453 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0294 (Gas) | Gas | TX | 2.9 yrs | 600 MW | Interconnection study | Facility Study |
| Sweet Valley Energy Center, LLC (NY DPS Case 23-03022) | Other | NY | 2.9 yrs | Not disclosed | Local/state review | — |
| 21 MW AC (NY DPS Case 23-03017) | Other | NY | 2.9 yrs | 21 MW | Local/state review | — |
| Yellow Feather Energy Center, LLC (NY DPS Case 23-03019) | Other | NY | 2.9 yrs | Not disclosed | Local/state review | — |
| Interconnection Request G0972 (Wind) | Wind (onshore) | OR | 2.9 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0973 (Wind) | Wind (onshore) | WA | 2.9 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0974 (Wind) | Wind (onshore) | OR | 2.9 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Bakerstand Solar, LLC [ 20 MW] (NY DPS Case 23-03018) | Solar | NY | 2.9 yrs | 20 MW | Local/state review | — |
| Northland Power U.S. Projects Inc (NY DPS Case 23-03024) | Solar | NY | 2.9 yrs | Not disclosed | Local/state review | — |
| Northland Power U.S. Projects Inc (NY DPS Case 23-03025) | Solar | NY | 2.9 yrs | Not disclosed | Local/state review | — |
| WAPA Desert Southwest Region Interconnection Request 2023-G13 (Gas) | Gas | AZ | 2.9 yrs | 453 MW | Interconnection study | — |
| ELP Stuyvesant Solar (NY DPS Case 23-03026) | Solar | NY | 2.9 yrs | 20 MW | Local/state review | — |
| 200 NEW COUNTY RD 2 SOLAR LLC — 0.975 MW COMMUNITY SOLAR GARDEN (ME DEP L-030560) | Solar | ME | 2.9 yrs | 0.975 MW | Local/state review | — |
| WAPA Desert Southwest Region Interconnection Request 2023-G14 (Solar+Battery) | Solar | AZ | 2.9 yrs | 250 MW | Interconnection study | — |
| Interconnection Request G0978 (Solar+Battery) | Solar | OR | 2.9 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| SUGAR MAPLE SOLAR, LLC (NY DPS Case 23-03027) | Solar | NY | 2.9 yrs | 125 MW | Local/state review | — |
| Tri-State Generation (CO PUC Docket 23A-0548E) | Other | CO | 2.8 yrs | Not disclosed | Local/state review | — |
| Interconnection Request G0994 (Wind) | Wind (onshore) | OR | 2.8 yrs | 277 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G0989 (Solar+Battery) | Solar | OR | 2.8 yrs | 275 MW | Interconnection study | In Progress (unknown study) |
| Niagara Mohawk Power Corporation d/b/a National Grid (NY DPS Case 23-T-0660) | Other | NY | 2.8 yrs | Not disclosed | Local/state review | — |
| METC Interconnection Request R1040 (Other+Battery) | Storage | MI | 2.8 yrs | 749 MW | Interconnection study | — |
| Sinnissippi Solar Energy LLC (WI PSC Docket 9823-CE-100) | Solar | WI | 2.8 yrs | 100 MW | Local/state review | — |
| Interconnection Request 26INR0351 (Gas) | Gas | TX | 2.8 yrs | 660 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0095 (Gas) | Gas | TX | 2.8 yrs | 311 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0096 (Battery) | Storage | TX | 2.8 yrs | 301 MW | Interconnection study | Facility Study |
| Interconnection Request G0998 (Nuclear) | Nuclear | WA | 2.8 yrs | 1,120 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1008 (Gas) | Gas | WA | 2.8 yrs | 286 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1007 (Wind+Battery) | Wind (onshore) | WA | 2.8 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1032 (Solar) | Solar | WA | 2.8 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1016 (Solar) | Solar | WA | 2.8 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1014 (Battery) | Storage | WA | 2.8 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1013 (Wind) | Wind (onshore) | OR | 2.8 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1035 (Solar) | Solar | WA | 2.8 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1031 (Solar) | Solar | WA | 2.8 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1015 (Solar) | Solar | WA | 2.8 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1025 (Solar+Wind+Battery) | Wind (onshore) | WA | 2.8 yrs | 509 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1037 (Solar+Battery) | Solar | WA | 2.8 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1041 (Wind+Battery) | Wind (onshore) | OR | 2.8 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1017 (Solar+Battery) | Solar | OR | 2.8 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1038 (Solar+Battery) | Solar | WA | 2.8 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1039 (Solar+Battery) | Solar | WA | 2.8 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1040 (Solar+Battery) | Solar | WA | 2.8 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1054 (Battery) | Storage | OR | 2.8 yrs | 1,300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1056 (Battery) | Storage | OR | 2.8 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1055 (Battery) | Storage | OR | 2.8 yrs | 1,300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1053 (Battery) | Storage | OR | 2.8 yrs | 1,300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1052 (Solar+Battery) | Solar | OR | 2.8 yrs | 1,300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1050 (Solar+Battery) | Solar | OR | 2.8 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1051 (Solar+Battery) | Solar | OR | 2.8 yrs | 1,300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 27INR0082 (Battery) | Storage | TX | 2.8 yrs | 502 MW | Interconnection study | Facility Study |
| Interconnection Request 24INR0576 (Gas) | Gas | TX | 2.8 yrs | 400 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0091 (Battery) | Storage | TX | 2.8 yrs | 310 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0023 (Solar) | Solar | TX | 2.8 yrs | 410 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0009 (Solar) | Solar | TX | 2.8 yrs | 445 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0010 (Wind) | Wind (onshore) | TX | 2.8 yrs | 622 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0011 (Solar) | Solar | TX | 2.8 yrs | 445 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0012 (Wind) | Wind (onshore) | TX | 2.8 yrs | 623 MW | Interconnection study | Facility Study |
| VALCOUR WETHERSFIELD NEWCO, LLC (NY DPS Case 23-03034) | Wind (onshore) | NY | 2.7 yrs | 136 MW | Local/state review | — |
| VALCOUR ELLENBURG NEWCO, LLC (NY DPS Case 23-03033) | Wind (onshore) | NY | 2.7 yrs | 91 MW | Local/state review | — |
| VALCOUR CHATEAUGAY NEWCO, LLC (NY DPS Case 23-03031) | Wind (onshore) | NY | 2.7 yrs | Not disclosed | Local/state review | — |
| VALCOUR CLINTON NEWCO, LLC (NY DPS Case 23-03032) | Wind (onshore) | NY | 2.7 yrs | 111 MW | Local/state review | — |
| VALCOUR BLISS NEWCO, LLC (NY DPS Case 23-03030) | Wind (onshore) | NY | 2.7 yrs | 111 MW | Local/state review | — |
| VALCOUR ALTONA NEWCO, LLC (NY DPS Case 23-03029) | Wind (onshore) | NY | 2.7 yrs | 108 MW | Local/state review | — |
| Rock Island (FERC No. P-943) | Hydro | WA | 2.7 yrs | 395 MW | Agency permitting | — |
| Basin Electric Power Cooperative (ND PSC PU-23-361) | Transmission | ND | 2.7 yrs | 345 kV | Local/state review | — |
| Interconnection Request 26INR0300 (Solar) | Solar | TX | 2.7 yrs | 302 MW | Interconnection study | Facility Study |
| WAPA Desert Southwest Region Interconnection Request 2023-G16 (Battery) | Storage | AZ | 2.7 yrs | 500 MW | Interconnection study | — |
| WAPA Desert Southwest Region Interconnection Request 2023-G15 (Battery) | Storage | AZ | 2.7 yrs | 500 MW | Interconnection study | — |
| WAPA Desert Southwest Region Interconnection Request 2023-G17 (Solar+Battery) | Solar | AZ | 2.7 yrs | 300 MW | Interconnection study | — |
| Interconnection Request 26INR0306 (Battery) | Storage | TX | 2.7 yrs | 256 MW | Interconnection study | Facility Study |
| PacifiCorp Interconnection Request PIS047 (Solar+Battery) | Solar | UT | 2.7 yrs | 275 MW | Interconnection study | In Progress (unknown study) |
| PacifiCorp Interconnection Request PIS049 (Solar+Battery) | Solar | UT | 2.7 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 27INR0143 (Battery) | Storage | TX | 2.7 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0108 (Wind) | Wind (onshore) | TX | 2.7 yrs | 379 MW | Interconnection study | Facility Study |
| WAPA Desert Southwest Region Interconnection Request 2024-MP1 (Battery) | Storage | AZ | 2.7 yrs | 500 MW | Interconnection study | — |
| WAPA Desert Southwest Region Interconnection Request 2024-MP2 (Battery) | Storage | AZ | 2.7 yrs | 500 MW | Interconnection study | — |
| Florida Power & Light Interconnection Request 620 (Battery) | Storage | FL | 2.7 yrs | 400 MW | Interconnection study | System Impact Study |
| Georgia Transmission Interconnection Request GI-189 (Solar+Battery) | Solar | GA | 2.7 yrs | 325 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0140 (Wind) | Wind (onshore) | TX | 2.7 yrs | 606 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0142 (Battery) | Storage | TX | 2.7 yrs | 279 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0030 (Battery) | Storage | TX | 2.7 yrs | 251 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0043 (Solar) | Solar | TX | 2.7 yrs | 503 MW | Interconnection study | Facility Study |
| WAPA Rocky Mountain Region Interconnection Request 2025-G1 (Solar+Battery) | Solar | — | 2.6 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| GIRI SEBASCO SOLAR LLC — .999 MW AC SOLAR ENERGY PROJECT (ME DEP L-030680) | Solar | ME | 2.6 yrs | 0.999 MW | Local/state review | — |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-02 (Gas) | Gas | CO | 2.6 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-11 (Battery) | Storage | CO | 2.6 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-22 (Solar) | Solar | CO | 2.6 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-18 (Wind) | Wind (onshore) | CO | 2.6 yrs | 293 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-21 (Solar) | Solar | CO | 2.6 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-15 (Wind) | Wind (onshore) | CO | 2.6 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-17 (Wind) | Wind (onshore) | CO | 2.6 yrs | 603 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-16 (Wind) | Wind (onshore) | CO | 2.6 yrs | 450 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-10 (Battery) | Storage | CO | 2.6 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-06 (Solar+Battery) | Solar | CO | 2.6 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-29 (Wind) | Wind (onshore) | CO | 2.6 yrs | 554 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-28 (Wind) | Wind (onshore) | CO | 2.6 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request 5RSC-2024-27 (Solar+Battery) | Solar | CO | 2.6 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| RWE Solar Development, LLC (NY DPS Case 24-03035) | Solar | NY | 2.6 yrs | Not disclosed | Local/state review | — |
| 125 MWAC solar photovoltaic project (NY DPS Case 24-03037) | Solar | NY | 2.6 yrs | 125 MW | Local/state review | — |
| Wallula Gap Solar (WA EFSEC) | Solar | WA | 2.6 yrs | 60 MW | Local/state review | — |
| Interconnection Request 26INR0334 (Battery) | Storage | TX | 2.6 yrs | 523 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0311 (Solar+Battery) | Solar | TX | 2.6 yrs | 251 MW | Interconnection study | Facility Study |
| Salt River Project Interconnection Request Q2413 (Battery) | Storage | AZ | 2.6 yrs | 409 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q2403 (Gas) | Gas | AZ | 2.6 yrs | 398 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q2405 (Other Storage) | Storage | AZ | 2.6 yrs | 1,020 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q2412 (Solar+Battery) | Solar | AZ | 2.6 yrs | 411 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q2415 (Solar+Battery) | Solar | AZ | 2.6 yrs | 300 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q2417 (Solar+Battery) | Solar | AZ | 2.6 yrs | 423 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q2409 (Solar+Battery) | Solar | AZ | 2.6 yrs | 1,200 MW | Interconnection study | — |
| Perkins Renewable Energy Project | Solar | CA | 2.6 yrs | 1,150 MW | Local/state review | — |
| DUKE ENERGY INDIANA Interconnection Request R1044 (Gas+Other) | Gas | IN | 2.6 yrs | 1,040 MW | Interconnection study | — |
| Interconnection Request 27INR0149 (Battery) | Storage | TX | 2.6 yrs | 314 MW | Interconnection study | Facility Study |
| PacifiCorp Interconnection Request S0028 (Battery) | Storage | WY | 2.6 yrs | 320 MW | Interconnection study | In Progress (unknown study) |
| PacifiCorp Interconnection Request S0026 (Battery) | Storage | WY | 2.6 yrs | 350 MW | Interconnection study | In Progress (unknown study) |
| Maple Harvest Wind LLC (NY DPS Case 24-03038) | Wind (onshore) | NY | 2.6 yrs | 150 MW | Local/state review | — |
| Puget Sound Energy Interconnection Request 141 (Solar+Wind+Battery) | Wind (onshore) | WA | 2.6 yrs | 300 MW | Interconnection study | Cluster Study |
| Long Island Lighting Company d/b/a LIPA (NY DPS Case 24-T-0113) | Transmission | NY | 2.6 yrs | Not disclosed | Local/state review | — |
| Black Mountain Energy Storage (WI PSC Docket 9824-CE-100) | Storage | WI | 2.5 yrs | 300 MW | Local/state review | — |
| RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC (TX PUCT Docket 56234) | Transmission | TX | 2.5 yrs | Not disclosed | Local/state review | — |
| Badger Wind, LLC (ND PSC PU-24-087) | Wind (onshore) | ND | 2.5 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 27INR0218 (Solar) | Solar | TX | 2.5 yrs | 301 MW | Interconnection study | Facility Study |
| Interconnection Request 25INR0582 (Battery) | Storage | TX | 2.5 yrs | 256 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0190 (Battery) | Storage | TX | 2.5 yrs | 502 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0115 (Battery) | Storage | TX | 2.5 yrs | 514 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0195 (Battery) | Storage | TX | 2.5 yrs | 401 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0040 (Solar) | Solar | TX | 2.5 yrs | 251 MW | Interconnection study | Facility Study |
| Niagara Mohawk Power Corporation d/b/a National Grid (NY DPS Case 24-T-0120) | Transmission | NY | 2.5 yrs | Not disclosed | Local/state review | — |
| HECATE ENERGY COLUMBIA COUNTY 1, LLC (NY DPS Case 24-03041) | Solar | NY | 2.5 yrs | 42 MW | Local/state review | — |
| ME HEMBREE CSG LLC & ME HEMBREE 2 CSG LLC — CONSTRUCTION OF A 0.975 MW AC GROUND-MOUNT SOLAR ARRAY ELATED ACCESS ROAD EQUIPM (ME DEP L-029942) | Solar | ME | 2.5 yrs | 0.975 MW | Local/state review | — |
| WAPA Desert Southwest Region Interconnection Request 2024-G3 (Solar+Battery) | Solar | AZ | 2.5 yrs | 260 MW | Interconnection study | — |
| AMEREN ILLINOIS Interconnection Request J3412 (Solar) | Solar | IL | 2.5 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company (CO PUC Docket 24A-0131E) | Other | CO | 2.5 yrs | Not disclosed | Local/state review | — |
| NV Energy Interconnection Request Company QQ (Battery) | Storage | NV | 2.5 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 25INR0588 (Solar+Battery) | Solar | TX | 2.5 yrs | 805 MW | Interconnection study | Facility Study |
| Interconnection Request 25INR0608 (Solar+Battery) | Solar | TX | 2.5 yrs | 600 MW | Interconnection study | Facility Study |
| Interconnection Request 25INR0587 (Solar+Battery) | Solar | TX | 2.5 yrs | 1,043 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0370 (Gas) | Gas | TX | 2.5 yrs | 750 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0425 (Solar) | Solar | TX | 2.5 yrs | 358 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0422 (Battery) | Storage | TX | 2.5 yrs | 255 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0071 (Gas) | Gas | TX | 2.5 yrs | 1,292 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0141 (Solar) | Solar | TX | 2.5 yrs | 403 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0192 (Solar+Battery) | Solar | TX | 2.5 yrs | 451 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0221 (Solar+Battery) | Solar | TX | 2.5 yrs | 896 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0222 (Solar+Battery) | Solar | TX | 2.5 yrs | 284 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0207 (Battery) | Storage | TX | 2.5 yrs | 304 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0017 (Wind) | Wind (onshore) | TX | 2.5 yrs | 600 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0063 (Solar) | Solar | TX | 2.5 yrs | 402 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0059 (Solar) | Solar | TX | 2.5 yrs | 261 MW | Interconnection study | Facility Study |
| Public Service Co. (CO PUC Docket 24A-0140E) | Other | CO | 2.5 yrs | Not disclosed | Local/state review | — |
| METC Interconnection Request J3438 (Battery) | Storage | MI | 2.5 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| ITC Interconnection Request J3656 (Battery) | Storage | MI | 2.5 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Navajo-Crystal Interconnection Request NC5-010 (Solar+Battery) | Solar | UT | 2.5 yrs | 500 MW | Interconnection study | — |
| AMEREN ILLINOIS Interconnection Request J3805 (Solar) | Solar | IL | 2.4 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| ITC MIDWEST Interconnection Request J3798 (Wind) | Wind (onshore) | IA | 2.4 yrs | 320 MW | Interconnection study | In Progress (unknown study) |
| GREAT RIVER ENERGY Interconnection Request J3235 (Battery) | Storage | MN | 2.4 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| MOSS RIDGE SOLAR, LLC (NY DPS Case 24-03042) | Solar | NY | 2.4 yrs | 60 MW | Local/state review | — |
| Interconnection Request 26INR0386 (Wind+Battery) | Wind (onshore) | TX | 2.4 yrs | 987 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0387 (Wind+Battery) | Wind (onshore) | TX | 2.4 yrs | 446 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0057 (Wind) | Wind (onshore) | TX | 2.4 yrs | 420 MW | Interconnection study | Facility Study |
| Interconnection Request 1513 (Battery) | Storage | MA | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Tri-State G&T (CO PUC Docket 24A-0171E) | Transmission | CO | 2.4 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 1515 (Battery) | Storage | MA | 2.4 yrs | 290 MW | Interconnection study | In Progress (unknown study) |
| NORTHERN STATES POWER COMPANY Interconnection Request J3399 (Solar) | Solar | MN | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 26INR0188 (Solar+Battery) | Solar | TX | 2.4 yrs | 411 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0132 (Wind+Battery) | Wind (onshore) | TX | 2.4 yrs | 298 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0061 (Solar+Battery) | Solar | TX | 2.4 yrs | 310 MW | Interconnection study | Facility Study |
| DUKE ENERGY INDIANA Interconnection Request J3232 (Gas) | Gas | IN | 2.4 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Gravel Road Solar LLC (NY DPS Case 24-03043) | Solar | NY | 2.4 yrs | Not disclosed | Local/state review | — |
| Interconnection Request J3361 (Wind) | Wind (onshore) | MI | 2.4 yrs | 254 MW | Interconnection study | In Progress (unknown study) |
| OTTER TAIL POWER COMPANY Interconnection Request J3443 (Wind+Battery) | Wind (onshore) | MN | 2.4 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| OTTER TAIL POWER COMPANY Interconnection Request J3468 (Wind+Battery) | Wind (onshore) | SD | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Limestone Land Development, LLC fka Bay Breeze Solar, LLC [150 MW] (NY DPS Case 24-03044) | Solar | NY | 2.4 yrs | 150 MW | Local/state review | — |
| ENTERGY MISSISSIPPI, LLC. Interconnection Request J3454 (Solar) | Solar | LA | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J3498 (Solar) | Solar | IL | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| METC Interconnection Request J3274 (Solar) | Solar | MI | 2.4 yrs | 290 MW | Interconnection study | In Progress (unknown study) |
| METC Interconnection Request J3282 (Solar) | Solar | MI | 2.4 yrs | 297 MW | Interconnection study | In Progress (unknown study) |
| METC Interconnection Request J3723 (Solar) | Solar | MI | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 27INR0235 (Battery) | Storage | TX | 2.4 yrs | 517 MW | Interconnection study | Facility Study |
| METC Interconnection Request J3313 (Wind) | Wind (onshore) | MI | 2.4 yrs | 263 MW | Interconnection study | In Progress (unknown study) |
| AMEREN MISSOURI Interconnection Request J3352 (Battery) | Storage | MO | 2.4 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| MONTANA-DAKOTA UTILITIES CO. Interconnection Request J3280 (Wind) | Wind (onshore) | ND | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| INDIANAPOLIS POWER & LIGHT COMPANY Interconnection Request J3331 (Gas) | Gas | IN | 2.4 yrs | 470 MW | Interconnection study | In Progress (unknown study) |
| AMEREN ILLINOIS Interconnection Request J3417 (Battery) | Storage | IL | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| OTTER TAIL POWER COMPANY Interconnection Request J3384 (Wind) | Wind (onshore) | MN | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| MIDAMERICAN ENERGY CO. Interconnection Request J3525 (Battery) | Storage | IL | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| ENTERGY LOUISIANA Interconnection Request J3591 (Solar+Battery) | Solar | LA | 2.4 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| ENTERGY MISSISSIPPI, LLC. Interconnection Request J3623 (Wind) | Wind (onshore) | MS | 2.4 yrs | 350 MW | Interconnection study | In Progress (unknown study) |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J3639 (Wind) | Wind (onshore) | WI | 2.4 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| INDIANAPOLIS POWER & LIGHT COMPANY Interconnection Request J3666 (Gas) | Gas | IN | 2.4 yrs | 379 MW | Interconnection study | In Progress (unknown study) |
| ENTERGY ARKANSAS Interconnection Request J3829 (Gas) | Gas | AR | 2.4 yrs | 770 MW | Interconnection study | In Progress (unknown study) |
| Irish Solar 1, LLC (NY DPS Case 24-03046) | Solar | NY | 2.4 yrs | Not disclosed | Local/state review | — |
| Bullseye Solar 1, LLC (NY DPS Case 24-03045) | Solar | NY | 2.4 yrs | Not disclosed | Local/state review | — |
| Interconnection Request J3326 (Wind) | Wind (onshore) | MN | 2.4 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| ENTERGY ARKANSAS Interconnection Request J3401 (Solar) | Solar | AR | 2.4 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| NORTHERN STATES POWER COMPANY Interconnection Request J3532 (Solar) | Solar | MN | 2.4 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| AMEREN ILLINOIS Interconnection Request J3521 (Wind) | Wind (onshore) | IL | 2.4 yrs | 350 MW | Interconnection study | In Progress (unknown study) |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J3558 (Battery) | Storage | IL | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J3556 (Solar) | Solar | IL | 2.4 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| DUKE ENERGY INDIANA Interconnection Request J3604 (Gas) | Gas | IN | 2.4 yrs | 650 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request J3564 (Wind) | Wind (onshore) | IN | 2.4 yrs | 275 MW | Interconnection study | In Progress (unknown study) |
| ENTERGY ARKANSAS Interconnection Request J3597 (Wind) | Wind (onshore) | AR | 2.4 yrs | 348 MW | Interconnection study | In Progress (unknown study) |
| OTTER TAIL POWER COMPANY Interconnection Request J3669 (Solar) | Solar | MN | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| AMEREN ILLINOIS Interconnection Request J3681 (Wind) | Wind (onshore) | IL | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| OTTER TAIL POWER COMPANY Interconnection Request J3672 (Wind) | Wind (onshore) | MN | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| MIDAMERICAN ENERGY CO. Interconnection Request J3699 (Wind) | Wind (onshore) | IL | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J3712 (Wind) | Wind (onshore) | IL | 2.4 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| AMEREN ILLINOIS Interconnection Request J3730 (Wind) | Wind (onshore) | IL | 2.4 yrs | 444 MW | Interconnection study | In Progress (unknown study) |
| MIDAMERICAN ENERGY CO. Interconnection Request J3701 (Wind) | Wind (onshore) | IA | 2.4 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| MIDAMERICAN ENERGY CO. Interconnection Request J3750 (Wind) | Wind (onshore) | IL | 2.4 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J3758 (Solar) | Solar | MO | 2.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| GREAT RIVER ENERGY Interconnection Request J3762 (Solar) | Solar | MN | 2.4 yrs | 430 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request J3799 (Gas) | Gas | MI | 2.4 yrs | 1,452 MW | Interconnection study | — |
| Helms Pumped Storage (FERC No. P-2735) | Hydro | CA | 2.4 yrs | 1,053 MW | Agency permitting | — |
| AMEREN MISSOURI Interconnection Request J3518 (Battery) | Storage | MO | 2.4 yrs | 300 MW | Interconnection study | — |
| 15B OLD SOUTH RD SOLAR LLC — NOVEL ENERGY ACQUIRED PROJECT FROM NBD SOLAR PROJECT HAS BEEN DOWNSIZED WHICH RE (ME DEP L-029246) | Solar | ME | 2.4 yrs | Not disclosed | Local/state review | — |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2024-0312) | Other | MO | 2.4 yrs | Not disclosed | Local/state review | — |
| Public Service Company Of Colorado Interconnection Request GI-2024-05 (Solar+Battery) | Solar | CO | 2.4 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| WAPA Desert Southwest Region Interconnection Request 2024-G4 (Solar+Wind+Battery) | Wind (onshore) | AZ | 2.4 yrs | 550 MW | Interconnection study | — |
| Arizona Public Service Interconnection Request Q553 (Other) | Other | AZ | 2.3 yrs | 340 MW | Interconnection study | Cluster Study |
| 200 NEW COUNTY ROAD 2 SOLAR LLC — CONSTRUCTION OF A SOLAR ARRAY ASSOC ELECTRICAL INFRASTUCTURE SECURITY FENCE ACCE (ME DEP L-031148) | Solar | ME | 2.3 yrs | Not disclosed | Local/state review | — |
| Public Service Company Of Colorado Interconnection Request GI-2024-06 (Solar+Battery) | Solar | CO | 2.3 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Arizona Public Service Interconnection Request Q561 (Other) | Other | AZ | 2.3 yrs | 600 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q560 (Other) | Other | AZ | 2.3 yrs | 425 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q558 (Other) | Other | AZ | 2.3 yrs | 250 MW | Interconnection study | Cluster Study |
| Interconnection Request 25INR0660 (Battery) | Storage | TX | 2.3 yrs | 306 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0075 (Battery) | Storage | TX | 2.3 yrs | 313 MW | Interconnection study | Facility Study |
| Arizona Public Service Interconnection Request Q563 (Solar+Battery) | Solar | AZ | 2.3 yrs | 500 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q564 (Other) | Other | AZ | 2.3 yrs | 500 MW | Interconnection study | Cluster Study |
| ENTERGY LOUISIANA Interconnection Request R1048 (Gas+Other) | Gas | LA | 2.3 yrs | 1,232 MW | Interconnection study | — |
| Arizona Public Service Interconnection Request Q567 (Other) | Other | AZ | 2.3 yrs | 450 MW | Interconnection study | Cluster Study |
| Public Service Company Of Colorado Interconnection Request GI-2024-12 (Wind) | Wind (onshore) | CO | 2.3 yrs | 423 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request GI-2024-13 (Wind) | Wind (onshore) | CO | 2.3 yrs | 423 MW | Interconnection study | In Progress (unknown study) |
| Arizona Public Service Interconnection Request Q569 (Solar+Battery) | Solar | AZ | 2.3 yrs | 250 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q572 (Other) | Other | CA | 2.3 yrs | 1,300 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q570 (Other) | Other | AZ | 2.3 yrs | 300 MW | Interconnection study | Cluster Study |
| Los Angeles Department of Water and Power Interconnection Request Q107 (Battery) | Storage | CA | 2.3 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| The Empire District Electric Company d/b/a Liberty (MO PSC Case EA-2024-0339) | Solar | MO | 2.3 yrs | Not disclosed | Local/state review | — |
| Associated Electric Cooperative, Incorporated Interconnection Request GI-122 (Wind) | Wind (onshore) | MO | 2.3 yrs | 500 MW | Interconnection study | Facility Study |
| Interconnection Request 25INR0632 (Solar) | Solar | TX | 2.3 yrs | 576 MW | Interconnection study | Facility Study |
| Interconnection Request 25INR0589 (Solar+Battery) | Solar | TX | 2.3 yrs | 1,043 MW | Interconnection study | Facility Study |
| Interconnection Request 25INR0586 (Solar+Battery) | Solar | TX | 2.3 yrs | 504 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0086 (Solar+Battery) | Solar | TX | 2.3 yrs | 403 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0252 (Battery) | Storage | TX | 2.3 yrs | 251 MW | Interconnection study | Facility Study |
| Declaration Energy Center, LLC (NY DPS Case 24-03049) | Other | NY | 2.3 yrs | Not disclosed | Local/state review | — |
| Public Service Company Of Colorado Interconnection Request GI-2024-16 (Solar+Battery) | Solar | CO | 2.3 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 1543 (Battery) | Storage | MA | 2.3 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| AMEREN MISSOURI Interconnection Request R1047 (Gas+Other) | Gas | MO | 2.3 yrs | 824 MW | Interconnection study | — |
| Tri-State Generation and Transmission Association Interconnection Request GI-TC-2024-25 (Wind) | Wind (onshore) | CO | 2.3 yrs | 350 MW | Interconnection study | In Progress (unknown study) |
| Tri-State Generation and Transmission Association Interconnection Request GI-TC-2024-31 (Solar+Battery) | Solar | CO | 2.3 yrs | 398 MW | Interconnection study | In Progress (unknown study) |
| Goldeneye Battery Storage (WA EFSEC) | Storage | WA | 2.3 yrs | 200 MW | Local/state review | — |
| Interconnection Request 25INR0656 (Battery) | Storage | TX | 2.3 yrs | 306 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0186 (Solar+Battery) | Solar | TX | 2.3 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0026 (Solar) | Solar | TX | 2.3 yrs | 251 MW | Interconnection study | Facility Study |
| Interconnection Request 1567 (Battery) | Storage | MA | 2.2 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| LONE STAR TRANSMISSION, LLC (TX PUCT Docket 56599) | Transmission | TX | 2.2 yrs | Not disclosed | Local/state review | — |
| Tennessee Valley Authority Interconnection Request 622 (Gas) | Gas | TN | 2.2 yrs | 800 MW | Interconnection study | Cluster Study |
| Tennessee Valley Authority Interconnection Request 618 (Gas) | Gas | TN | 2.2 yrs | 800 MW | Interconnection study | Facility Study |
| Tennessee Valley Authority Interconnection Request 620 (Gas) | Gas | TN | 2.2 yrs | 1,600 MW | Interconnection study | Cluster Study |
| Tennessee Valley Authority Interconnection Request 628 (Gas) | Gas | KY | 2.2 yrs | 1,600 MW | Interconnection study | Cluster Study |
| Tennessee Valley Authority Interconnection Request 624 (Gas) | Gas | TN | 2.2 yrs | 375 MW | Interconnection study | Facility Study |
| Interconnection Request 24INR0763 (Battery) | Storage | TX | 2.2 yrs | 307 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0503 (Battery) | Storage | TX | 2.2 yrs | 256 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0086 (Gas) | Gas | TX | 2.2 yrs | 888 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0087 (Gas) | Gas | TX | 2.2 yrs | 479 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0090 (Gas) | Gas | TX | 2.2 yrs | 1,036 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0013 (Solar) | Solar | TX | 2.2 yrs | 307 MW | Interconnection study | Facility Study |
| Tucson Electric Power Company Interconnection Request 174 (Gas) | Gas | AZ | 2.2 yrs | 800 MW | Interconnection study | — |
| AMERICAN TRANSMISSION COMPANY Interconnection Request R1053 (Gas) | Gas | WI | 2.2 yrs | 1,138 MW | Interconnection study | — |
| Duke Energy Progress Interconnection Request 958347 (Gas) | Gas | NC | 2.2 yrs | 1,455 MW | Interconnection study | Cluster Study |
| Los Angeles Department of Water and Power Interconnection Request Q108 (Battery) | Storage | CA | 2.2 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Essex A North Lot Solar, LLC (VT 24-1898-PET) | Solar | VT | 2.2 yrs | 3.5 MW | Local/state review | — |
| Duke Energy Carolinas Interconnection Request 960889 (Gas) | Gas | NC | 2.2 yrs | 455 MW | Interconnection study | Cluster Study |
| Duke Energy Carolinas Interconnection Request 961188 (Gas) | Gas | NC | 2.2 yrs | 455 MW | Interconnection study | Cluster Study |
| Duke Energy Carolinas Interconnection Request 961210 (Gas) | Gas | NC | 2.2 yrs | 455 MW | Interconnection study | Cluster Study |
| Duke Energy Carolinas Interconnection Request 956747 (Gas) | Gas | SC | 2.2 yrs | 455 MW | Interconnection study | Cluster Study |
| Duke Energy Carolinas Interconnection Request 957264 (Gas) | Gas | SC | 2.2 yrs | 1,450 MW | Interconnection study | Cluster Study |
| METC Interconnection Request R1052 (Other+Battery) | Storage | — | 2.2 yrs | 615 MW | Interconnection study | — |
| Niagara Mohawk Power Corporation d/b/a National Grid (NY DPS Case 24-T-0373) | Transmission | NY | 2.2 yrs | Not disclosed | Local/state review | — |
| Los Angeles Department of Water and Power Interconnection Request Q111 (Solar+Battery) | Solar | NV | 2.2 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| EDF Renewables Development, Inc (NY DPS Case 24-03052) | Solar | NY | 2.2 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 27INR0309 (Solar) | Solar | TX | 2.2 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0310 (Wind) | Wind (onshore) | TX | 2.2 yrs | 523 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0088 (Solar+Battery) | Solar | TX | 2.2 yrs | 309 MW | Interconnection study | Facility Study |
| Tennessee Valley Authority Interconnection Request 636 (Gas) | Gas | TN | 2.2 yrs | 276 MW | Interconnection study | Cluster Study |
| AMEREN ILLINOIS Interconnection Request R1055 (Other+Battery) | Storage | IL | 2.2 yrs | 322 MW | Interconnection study | — |
| AMEREN ILLINOIS Interconnection Request S1057 (Solar+Other) | Solar | IL | 2.1 yrs | 360 MW | Interconnection study | — |
| NORTHERN STATES POWER COMPANY Interconnection Request S1054 (Wind+Other) | Wind (onshore) | MN | 2.1 yrs | 550 MW | Interconnection study | — |
| Interconnection Request 25INR0653 (Battery) | Storage | TX | 2.1 yrs | 306 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0527 (Solar+Battery) | Solar | TX | 2.1 yrs | 300 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0084 (Gas) | Gas | TX | 2.1 yrs | 1,536 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0111 (Solar+Battery) | Solar | TX | 2.1 yrs | 400 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0031 (Wind) | Wind (onshore) | TX | 2.1 yrs | 641 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0030 (Solar) | Solar | TX | 2.1 yrs | 502 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0034 (Solar) | Solar | TX | 2.1 yrs | 502 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0035 (Wind) | Wind (onshore) | TX | 2.1 yrs | 641 MW | Interconnection study | Facility Study |
| ENTERGY TEXAS, INC. (TX PUCT Docket 56865) | Other | TX | 2.1 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 29INR0041 (Gas) | Gas | TX | 2.1 yrs | 260 MW | Interconnection study | Facility Study |
| New York Transco LLC and New York Power Authority (NY DPS Case 24-T-0446) | Transmission | NY | 2.1 yrs | Not disclosed | Local/state review | — |
| ConEd Interconnection Request C24-005 (Battery) | Storage | NY | 2.1 yrs | 300 MW | Interconnection study | — |
| NYPA Interconnection Request C24-003 (Offshore Wind) | Wind (offshore) | NY | 2.1 yrs | 1,321 MW | Interconnection study | — |
| CONED Interconnection Request C24-021 (Offshore Wind) | Wind (offshore) | NY | 2.1 yrs | 1,310 MW | Interconnection study | — |
| NM-NG Interconnection Request C24-074 (Battery) | Storage | NY | 2.1 yrs | 250 MW | Interconnection study | — |
| OGE Interconnection Request GEN-2024-013 (Gas) | Gas | OK | 2.1 yrs | 496 MW | Interconnection study | System Impact Study |
| Georgia Transmission Interconnection Request GI-194 (Gas) | Gas | GA | 2.1 yrs | 250 MW | Interconnection study | Facility Study |
| Georgia Transmission Interconnection Request GI-193 (Gas) | Gas | GA | 2.1 yrs | 2,000 MW | Interconnection study | Facility Study |
| Public Service Company of Colorado (CO PUC Docket 24A-0341E) | Other | CO | 2.1 yrs | Not disclosed | Local/state review | — |
| WAPA Desert Southwest Region Interconnection Request 2024-G5 (Wind) | Wind (onshore) | AZ | 2.1 yrs | 300 MW | Interconnection study | — |
| LYNTEGAR ELECTRIC COOPERATIVE, INC (TX PUCT Docket 56950) | Transmission | TX | 2.1 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 26INR0545 (Battery) | Storage | TX | 2.1 yrs | 522 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0550 (Battery) | Storage | TX | 2.1 yrs | 253 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0216 (Battery) | Storage | TX | 2.1 yrs | 256 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0291 (Battery) | Storage | TX | 2.1 yrs | 256 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0072 (Wind) | Wind (onshore) | TX | 2.1 yrs | 479 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0019 (Solar) | Solar | TX | 2.1 yrs | 402 MW | Interconnection study | Facility Study |
| Buckley Solar Facility (OR EFSC) | Solar | OR | 2.1 yrs | 1,200 MW | Local/state review | — |
| Arkansas Electric Cooperative Corporation (AR PSC Docket 24-045-U) | Gas | TX | 2.1 yrs | Not disclosed | Local/state review | — |
| DOS AGUAS, LLC (TX PUCT Docket 56971) | Other | TX | 2.0 yrs | Not disclosed | Local/state review | — |
| Dominion Energy South Carolina, Inc. (SC PSC Docket 2024-245-E) | Transmission | SC | 2.0 yrs | Not disclosed | Local/state review | — |
| Associated Electric Cooperative, Incorporated Interconnection Request GI-123 (Wind) | Wind (onshore) | OK | 2.0 yrs | 300 MW | Interconnection study | Facility Study |
| PacifiCorp Interconnection Request PIS087 (Other Storage) | Storage | UT | 2.0 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 26INR0546 (Battery) | Storage | TX | 2.0 yrs | 603 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0294 (Battery) | Storage | TX | 2.0 yrs | 403 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0097 (Battery) | Storage | TX | 2.0 yrs | 515 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0132 (Solar+Battery) | Solar | TX | 2.0 yrs | 502 MW | Interconnection study | Facility Study |
| NM-NG Interconnection Request C24-148 (Battery) | Storage | NY | 2.0 yrs | 300 MW | Interconnection study | — |
| Transco Interconnection Request C24-165 (Battery) | Storage | NY | 2.0 yrs | 250 MW | Interconnection study | — |
| NYSEG Interconnection Request C24-175 (Solar+Battery) | Solar | PA | 2.0 yrs | 325 MW | Interconnection study | — |
| NYSEG Interconnection Request C24-176 (Solar+Battery) | Solar | PA | 2.0 yrs | 325 MW | Interconnection study | — |
| NYPA Interconnection Request C24-189 (Wind) | Wind (onshore) | NY | 2.0 yrs | 380 MW | Interconnection study | — |
| NYPA Interconnection Request C24-190 (Wind) | Wind (onshore) | NY | 2.0 yrs | 380 MW | Interconnection study | — |
| Carnation Solar (OH OPSB Case 24-0881-EL-BGN) | Solar | OH | 2.0 yrs | Not disclosed | Local/state review | — |
| DUKE ENERGY INDIANA Interconnection Request J3834 (Battery) | Storage | IN | 2.0 yrs | 300 MW | Interconnection study | — |
| Hemlock Hollow Wind LLC (NY DPS Case 24-03059) | Wind (onshore) | NY | 2.0 yrs | 95 MW | Local/state review | — |
| Richland III PV, LLC (NY DPS Case 24-03057) | Solar | NY | 2.0 yrs | Not disclosed | Local/state review | — |
| Sierra Pacific Power Company d/b/a NV Energy (NV PUCN Docket 24-09019) | Transmission | NV | 2.0 yrs | Not disclosed | Local/state review | — |
| NYSEG Interconnection Request C24-233 (Battery) | Storage | PA | 2.0 yrs | 400 MW | Interconnection study | — |
| ConEd Interconnection Request C24-283 (Battery) | Storage | NY | 1.9 yrs | 349 MW | Interconnection study | — |
| NYSEG Interconnection Request C24-301 (Solar) | Solar | PA | 1.9 yrs | 250 MW | Interconnection study | — |
| Interconnection Request 28INR0157 (Battery) | Storage | TX | 1.9 yrs | 307 MW | Interconnection study | Facility Study |
| Field Day Solar (NY DPS Case 24-03060) | Solar | NY | 1.9 yrs | 200 MW | Local/state review | — |
| CS Grass River Solar, LLC (NY DPS Case 24-03061) | Solar | NY | 1.9 yrs | 80 MW | Local/state review | — |
| SPS Interconnection Request GEN-2024-015 (Solar+Battery) | Solar | TX | 1.9 yrs | 280 MW | Interconnection study | System Impact Study |
| Golden Knight Solar, LLC (NY DPS Case 24-03062) | Solar | NY | 1.9 yrs | 140 MW | Local/state review | — |
| Georgia Transmission Interconnection Request GI-198 (Gas) | Gas | GA | 1.9 yrs | 780 MW | Interconnection study | System Impact Study |
| Los Angeles Department of Water and Power Interconnection Request Q112 (Battery) | Storage | CA | 1.9 yrs | 1,000 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 28INR0179 (Solar+Battery) | Solar | TX | 1.9 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0181 (Solar+Battery) | Solar | TX | 1.9 yrs | 256 MW | Interconnection study | Facility Study |
| NYSEG Interconnection Request C24-352 (Battery) | Storage | NY | 1.9 yrs | 300 MW | Interconnection study | — |
| O&R Interconnection Request C24-358 (Battery) | Storage | NY | 1.9 yrs | 300 MW | Interconnection study | — |
| Interconnection Request 29INR0056 (Solar+Battery) | Solar | TX | 1.9 yrs | 301 MW | Interconnection study | Facility Study |
| Elliott-Lee 138 kV Transmission Line Rebuild Project (OH OPSB Case 24-0978-EL-BTX) | Transmission | OH | 1.9 yrs | Not disclosed | Local/state review | — |
| METC Interconnection Request J3836 (Battery) | Storage | MI | 1.9 yrs | 250 MW | Interconnection study | — |
| Interconnection Request J3986 (Solar) | Solar | TX | 1.9 yrs | 270 MW | Interconnection study | — |
| Interconnection Request 28INR0067 (Solar) | Solar | TX | 1.9 yrs | 800 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0169 (Wind) | Wind (onshore) | TX | 1.9 yrs | 293 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0198 (Solar+Battery) | Solar | TX | 1.9 yrs | 302 MW | Interconnection study | Facility Study |
| LITTLE SALMON SOLAR, LLC (NY DPS Case 24-03063) | Solar | NY | 1.9 yrs | 200 MW | Local/state review | — |
| NPPD Interconnection Request GEN-2024-021 (Gas) | Gas | NE | 1.9 yrs | 540 MW | Interconnection study | System Impact Study |
| NPPD Interconnection Request GEN-2024-022 (Gas) | Gas | NE | 1.9 yrs | 390 MW | Interconnection study | System Impact Study |
| ITCGP Interconnection Request GEN-2024-016 (Wind) | Wind (onshore) | KS | 1.9 yrs | 300 MW | Interconnection study | System Impact Study |
| NPPD Interconnection Request GEN-2024-023 (Gas) | Gas | NE | 1.9 yrs | 270 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-025 (Solar) | Solar | TX | 1.9 yrs | 300 MW | Interconnection study | System Impact Study |
| SUNC Interconnection Request GEN-2024-032 (Solar) | Solar | KS | 1.9 yrs | 250 MW | Interconnection study | System Impact Study |
| BEPC Interconnection Request GEN-2024-035 (Solar+Battery) | Solar | SD | 1.9 yrs | 270 MW | Interconnection study | System Impact Study |
| OPPD Interconnection Request GEN-2024-038 (Solar) | Solar | NE | 1.9 yrs | 300 MW | Interconnection study | System Impact Study |
| NPPD Interconnection Request GEN-2024-020 (Gas) | Gas | NE | 1.9 yrs | 390 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-041 (Wind) | Wind (onshore) | TX | 1.9 yrs | 250 MW | Interconnection study | System Impact Study |
| OPPD Interconnection Request GEN-2024-039 (Solar) | Solar | NE | 1.9 yrs | 250 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-045 (Solar) | Solar | TX | 1.9 yrs | 345 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-043 (Wind) | Wind (onshore) | NM | 1.9 yrs | 250 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-046 (Solar) | Solar | TX | 1.9 yrs | 345 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-050 (Solar+Battery) | Solar | TX | 1.9 yrs | 300 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-063 (Solar) | Solar | TX | 1.9 yrs | 256 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-042 (Wind) | Wind (onshore) | TX | 1.9 yrs | 250 MW | Interconnection study | System Impact Study |
| ITCGP Interconnection Request GEN-2024-067 (Solar) | Solar | KS | 1.9 yrs | 380 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-068 (Solar) | Solar | TX | 1.9 yrs | 300 MW | Interconnection study | System Impact Study |
| NEETSW Interconnection Request GEN-2024-073 (Solar+Battery) | Solar | NM | 1.9 yrs | 500 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-077 (Solar) | Solar | TX | 1.9 yrs | 300 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-078 (Solar) | Solar | TX | 1.9 yrs | 300 MW | Interconnection study | System Impact Study |
| BEPC Interconnection Request GEN-2024-081 (Gas) | Gas | ND | 1.9 yrs | 745 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-079 (Solar) | Solar | NM | 1.9 yrs | 250 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-080 (Solar) | Solar | NM | 1.9 yrs | 250 MW | Interconnection study | System Impact Study |
| BEPC Interconnection Request GEN-2024-082 (Gas) | Gas | ND | 1.9 yrs | 745 MW | Interconnection study | System Impact Study |
| ITCGP Interconnection Request GEN-2024-083 (Solar) | Solar | OK | 1.9 yrs | 250 MW | Interconnection study | System Impact Study |
| American Transmission Company LLC (WI PSC Docket 137-CE-215) | Transmission | WI | 1.9 yrs | Not disclosed | Local/state review | — |
| PacifiCorp Interconnection Request PIS089 (Wind) | Wind (onshore) | WY | 1.9 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| CITY OF SAN ANTONIO, ACTING BY AND THROUGH THE CITY PUBLIC SERVICE BOARD (CPS ENERGY) (TX PUCT Docket 57206) | Transmission | TX | 1.8 yrs | Not disclosed | Local/state review | — |
| Corby Battery Energy Storage System Project | Storage | CA | 1.8 yrs | 300 MW | Local/state review | — |
| AMEREN ILLINOIS Interconnection Request J2377 (Battery) | Storage | IL | 1.8 yrs | 300 MW | Interconnection study | Cluster Study |
| Interconnection Request 26INR0525 (Battery) | Storage | TX | 1.8 yrs | 416 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0615 (Battery) | Storage | TX | 1.8 yrs | 256 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0386 (Solar+Battery) | Solar | TX | 1.8 yrs | 306 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0113 (Wind) | Wind (onshore) | TX | 1.8 yrs | 750 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0118 (Battery) | Storage | TX | 1.8 yrs | 307 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0194 (Solar+Battery) | Solar | TX | 1.8 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0025 (Wind) | Wind (onshore) | TX | 1.8 yrs | 370 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0068 (Gas) | Gas | TX | 1.8 yrs | 470 MW | Interconnection study | Facility Study |
| AEP TEXAS INC. (TX PUCT Docket 57245) | Transmission | TX | 1.8 yrs | Not disclosed | Local/state review | — |
| METC Interconnection Request J3843 (Solar) | Solar | MI | 1.8 yrs | 300 MW | Interconnection study | — |
| WAPA Desert Southwest Region Interconnection Request 2024-G7 (Wind+Battery) | Wind (onshore) | AZ | 1.8 yrs | 313 MW | Interconnection study | — |
| Interconnection Request 27INR0385 (Solar+Battery) | Solar | TX | 1.8 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0186 (Battery) | Storage | TX | 1.8 yrs | 257 MW | Interconnection study | Facility Study |
| ITC Interconnection Request J3845 (Battery) | Storage | MI | 1.8 yrs | 250 MW | Interconnection study | — |
| Terra-Gen LLC (NY DPS Case 24-03066) | Other | NY | 1.8 yrs | 250 MW | Local/state review | — |
| New York State Electric & Gas Corporation (NY DPS Case 24-T-0677) | Transmission | NY | 1.8 yrs | Not disclosed | Local/state review | — |
| ITC Interconnection Request J3866 (Wind) | Wind (onshore) | MI | 1.8 yrs | 300 MW | Interconnection study | — |
| Interconnection Request 27INR0365 (Battery) | Storage | TX | 1.8 yrs | 614 MW | Interconnection study | Facility Study |
| Rocky Mountain PS (FERC No. P-2725) | Hydro | GA | 1.8 yrs | 904 MW | Agency permitting | — |
| METC Interconnection Request J3865 (Wind) | Wind (onshore) | MI | 1.7 yrs | 250 MW | Interconnection study | — |
| Interconnection Request 1595 (Battery) | Storage | NY | 1.7 yrs | 300 MW | Interconnection study | — |
| Interconnection Request 26INR0609 (Solar) | Solar | TX | 1.7 yrs | 600 MW | Interconnection study | Facility Study |
| SOUTHWESTERN ELECTRIC POWER COMPANY (TX PUCT Docket 57376) | Gas | TX | 1.7 yrs | Not disclosed | Local/state review | — |
| ENTERGY ARKANSAS Interconnection Request J3874 (Gas) | Gas | AR | 1.7 yrs | 770 MW | Interconnection study | — |
| Interconnection Request 26INR0465 (Battery) | Storage | TX | 1.7 yrs | 606 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0119 (Battery) | Storage | TX | 1.7 yrs | 342 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0223 (Solar) | Solar | TX | 1.7 yrs | 255 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0245 (Solar+Battery) | Solar | TX | 1.7 yrs | 403 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0242 (Wind) | Wind (onshore) | TX | 1.7 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0082 (Solar) | Solar | TX | 1.7 yrs | 300 MW | Interconnection study | Facility Study |
| Southwestern Electric Power Company (LA PSC Docket U-37463) | Gas | LA | 1.7 yrs | Not disclosed | Local/state review | — |
| Public Service Company (CO PUC Docket 24A-0560E) | Other | CO | 1.7 yrs | Not disclosed | Local/state review | — |
| NORTHERN INDIANA PUBLIC SERVICE COMPANY Interconnection Request R5062 (Gas) | Gas | IN | 1.7 yrs | 733 MW | Interconnection study | — |
| ENTERGY ARKANSAS Interconnection Request J3982 (Wind) | Wind (onshore) | AR | 1.7 yrs | 320 MW | Interconnection study | — |
| AMERICAN TRANSMISSION COMPANY Interconnection Request R1049 (Other+Coal) | Other | WI | 1.7 yrs | 304 MW | Interconnection study | — |
| AMEREN ILLINOIS Interconnection Request J3853 (Wind) | Wind (onshore) | IL | 1.7 yrs | 300 MW | Interconnection study | — |
| Interconnection Request 26INR0612 (Battery) | Storage | TX | 1.7 yrs | 308 MW | Interconnection study | Facility Study |
| BATH COUNTY PUMPED STORAGE (FERC No. P-2716) | Hydro | VA | 1.7 yrs | 2,484 MW | Agency permitting | — |
| CLECO POWER Interconnection Request J3840 (Battery) | Storage | LA | 1.7 yrs | 300 MW | Interconnection study | — |
| DAIRYLAND POWER COOPERATIVE Interconnection Request J3848 (Battery) | Storage | MN | 1.7 yrs | 250 MW | Interconnection study | — |
| PSEG RENEWABLE TRANSMISSION LLC (MD PSC Case No. 9773) | Transmission | MD | 1.7 yrs | Not disclosed | Local/state review | — |
| Associated Electric Cooperative, Incorporated Interconnection Request GI-126 (Gas) | Gas | MO | 1.7 yrs | 460 MW | Interconnection study | System Impact Study |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2025-0198) | Other | MO | 1.7 yrs | Not disclosed | Local/state review | — |
| EL PASO ELECTRIC COMPANY (TX PUCT Docket 57501) | Solar | TX | 1.7 yrs | 100 MW | Local/state review | — |
| NORTHERN INDIANA PUBLIC SERVICE COMPANY Interconnection Request J3846 (Wind) | Wind (onshore) | IN | 1.7 yrs | 275 MW | Interconnection study | — |
| METC Interconnection Request J3887 (Wind) | Wind (onshore) | MI | 1.7 yrs | 300 MW | Interconnection study | — |
| SYNERGEN ELLSWORTH LLC — PROPOSING A +/- 5.5 ACRE SOLAR PROJECT TO BE LOCATED OFF MARIAVILLE RD IN ELLSWO (ME DEP L-030493) | Solar | ME | 1.7 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 27INR0367 (Wind+Battery) | Wind (onshore) | TX | 1.6 yrs | 303 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0108 (Gas) | Gas | TX | 1.6 yrs | 570 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0270 (Solar+Battery) | Solar | TX | 1.6 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 30INR0018 (Wind) | Wind (onshore) | TX | 1.6 yrs | 1,500 MW | Interconnection study | Facility Study |
| DesertLink, LLC (NV PUCN Docket 25-01027) | Transmission | NV | 1.6 yrs | Not disclosed | Local/state review | — |
| AMEREN ILLINOIS Interconnection Request J3901 (Wind) | Wind (onshore) | IL | 1.6 yrs | 300 MW | Interconnection study | — |
| Niagara Mohawk Power Corporation d/b/a National Grid (NY DPS Case 25-T-0049) | Transmission | NY | 1.6 yrs | Not disclosed | Local/state review | — |
| AMEREN ILLINOIS Interconnection Request J3860 (Wind) | Wind (onshore) | IL | 1.6 yrs | 500 MW | Interconnection study | — |
| ITC Interconnection Request J3872 (Battery) | Storage | MI | 1.6 yrs | 350 MW | Interconnection study | — |
| AEC Interconnection Request AH1-260 (Battery) | Storage | NJ | 1.6 yrs | 300 MW | Interconnection study | System Impact Study |
| Dominion Interconnection Request AH1-528 (Solar) | Solar | VA | 1.6 yrs | 301 MW | Interconnection study | System Impact Study |
| Interconnection Request 26INR0630 (Battery) | Storage | TX | 1.6 yrs | 500 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0633 (Battery) | Storage | TX | 1.6 yrs | 500 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0447 (Battery) | Storage | TX | 1.6 yrs | 259 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0452 (Solar+Battery) | Solar | TX | 1.6 yrs | 603 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0180 (Solar+Battery) | Solar | TX | 1.6 yrs | 357 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0185 (Solar+Battery) | Solar | TX | 1.6 yrs | 255 MW | Interconnection study | Facility Study |
| Cloverleaf Solar, LLC (WI PSC Docket 9834-CE-100) | Solar | WI | 1.6 yrs | 145 MW | Local/state review | — |
| AMEREN MISSOURI Interconnection Request J3929 (Wind) | Wind (onshore) | MO | 1.6 yrs | 250 MW | Interconnection study | — |
| Public Service Company of New Mexico Interconnection Request IA-PNM-2025-01 (Solar+Battery) | Solar | NM | 1.6 yrs | 371 MW | Interconnection study | Cluster Study |
| Interconnection Request 30INR0031 (Gas) | Gas | TX | 1.6 yrs | 1,500 MW | Interconnection study | Facility Study |
| AEP Interconnection Request AG2-072 (Gas) | Gas | IN | 1.6 yrs | 700 MW | Interconnection study | System Impact Study |
| Salt River Project Interconnection Request Q2510 (Battery) | Storage | AZ | 1.6 yrs | 264 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q2512 (Battery) | Storage | AZ | 1.6 yrs | 503 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q2516 (Battery) | Storage | AZ | 1.6 yrs | 352 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q2511 (Battery) | Storage | AZ | 1.6 yrs | 419 MW | Interconnection study | — |
| Salt River Project Interconnection Request Q2515 (Solar+Battery) | Solar | AZ | 1.6 yrs | 359 MW | Interconnection study | — |
| New York State Electric & Gas Corporation (NY DPS Case 25-T-0080) | Other | NY | 1.6 yrs | Not disclosed | Local/state review | — |
| ENTERGY ARKANSAS Interconnection Request J3889 (Solar) | Solar | AR | 1.6 yrs | 350 MW | Interconnection study | — |
| ENTERGY TEXAS, INC. Interconnection Request J3902 (Wind) | Wind (onshore) | TX | 1.6 yrs | 289 MW | Interconnection study | — |
| NORTHERN INDIANA PUBLIC SERVICE COMPANY Interconnection Request J3931 (Solar) | Solar | IN | 1.6 yrs | 500 MW | Interconnection study | — |
| ComEd Interconnection Request AG2-453 (Solar) | Solar | IL | 1.6 yrs | 280 MW | Interconnection study | System Impact Study |
| Interconnection Request J3884 (Solar) | Solar | MN | 1.6 yrs | 300 MW | Interconnection study | — |
| AMEREN ILLINOIS Interconnection Request J3883 (Battery) | Storage | IL | 1.6 yrs | 250 MW | Interconnection study | — |
| AMEREN ILLINOIS Interconnection Request J3882 (Solar) | Solar | IL | 1.6 yrs | 250 MW | Interconnection study | — |
| Santee Cooper Interconnection Request 284 (Gas) | Gas | SC | 1.6 yrs | 819 MW | Interconnection study | Cluster Study |
| Santee Cooper Interconnection Request 283 (Gas) | Gas | SC | 1.6 yrs | 819 MW | Interconnection study | Cluster Study |
| Santee Cooper Interconnection Request 285 (Gas) | Gas | SC | 1.6 yrs | 819 MW | Interconnection study | Cluster Study |
| OTTER TAIL POWER COMPANY Interconnection Request J3886 (Wind) | Wind (onshore) | MN | 1.6 yrs | 300 MW | Interconnection study | — |
| AEP Interconnection Request AG2-360 (Battery) | Storage | VA | 1.6 yrs | 250 MW | Interconnection study | System Impact Study |
| Interconnection Request 27INR0438 (Solar+Battery) | Solar | TX | 1.6 yrs | 299 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0212 (Solar+Battery) | Solar | TX | 1.6 yrs | 302 MW | Interconnection study | Facility Study |
| HALO NE1 LLC (MD PSC Case No. 9779) | Solar | MD | 1.6 yrs | 5 MW | Local/state review | — |
| AEP Interconnection Request AG2-029 (Solar) | Solar | IN | 1.6 yrs | 250 MW | Interconnection study | System Impact Study |
| Duke Energy Indiana, LLC (IN IURC Cause No. 46193) | Gas | IN | 1.6 yrs | 738 MW | Litigation | — |
| GREAT RIVER ENERGY Interconnection Request J3894 (Battery) | Storage | MN | 1.6 yrs | 250 MW | Interconnection study | — |
| AEP Interconnection Request AG2-163 (Solar) | Solar | IN | 1.6 yrs | 250 MW | Interconnection study | System Impact Study |
| Interconnection Request 26INR0466 (Battery) | Storage | TX | 1.6 yrs | 612 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0392 (Battery) | Storage | TX | 1.6 yrs | 301 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0445 (Wind) | Wind (onshore) | TX | 1.6 yrs | 379 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0277 (Battery) | Storage | TX | 1.6 yrs | 306 MW | Interconnection study | Facility Study |
| Viracocha-Hill Battery Energy Storage System Project | Storage | CA | 1.6 yrs | 90.7 MW | Local/state review | — |
| AES Clean Energy Development, LLC (NY DPS Case 25-00327) | Solar | NY | 1.6 yrs | 60 MW | Local/state review | — |
| DUKE ENERGY INDIANA Interconnection Request J3942 (Solar) | Solar | IN | 1.5 yrs | 365 MW | Interconnection study | — |
| AMEREN ILLINOIS Interconnection Request J3950 (Solar) | Solar | IL | 1.5 yrs | 340 MW | Interconnection study | — |
| DUKE ENERGY INDIANA Interconnection Request J3943 (Solar) | Solar | IN | 1.5 yrs | 337 MW | Interconnection study | — |
| MARYLAND BLUE CRAB SOLAR & STORAGE, LCC (MD PSC Case No. 9782) | Solar | MD | 1.5 yrs | 100 MW | Local/state review | — |
| Great River Energy and Minnesota Power and Otter Tail Power Company (ND PSC PU-25-082) | Transmission | ND | 1.5 yrs | 345 kV | Local/state review | — |
| MIDAMERICAN ENERGY CO. Interconnection Request J3911 (Solar) | Solar | IA | 1.5 yrs | 250 MW | Interconnection study | — |
| APS Interconnection Request AG2-582 (Gas) | Gas | WV | 1.5 yrs | 2,100 MW | Interconnection study | System Impact Study |
| Interconnection Request 28INR0278 (Battery) | Storage | TX | 1.5 yrs | 306 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0063 (Wind) | Wind (onshore) | TX | 1.5 yrs | 295 MW | Interconnection study | Facility Study |
| BROWNSVILLE PUBLIC UTILITIES BOARD (TX PUCT Docket 57750) | Other | TX | 1.5 yrs | Not disclosed | Local/state review | — |
| Sunrise Solar and Storage Projects (OR EFSC) | Solar | OR | 1.5 yrs | 800 MW | Local/state review | — |
| ITC Interconnection Request J3923 (Gas) | Gas | MI | 1.5 yrs | 1,414 MW | Interconnection study | — |
| NORTHERN INDIANA PUBLIC SERVICE COMPANY Interconnection Request J3910 (Wind) | Wind (onshore) | IN | 1.5 yrs | 300 MW | Interconnection study | — |
| METC Interconnection Request J3935 (Gas) | Gas | MI | 1.5 yrs | 1,268 MW | Interconnection study | — |
| TEXAS WATER UTILITIES, L.P. (TX PUCT Docket 57776) | Other | TX | 1.5 yrs | Not disclosed | Local/state review | — |
| OGE Interconnection Request GEN-2024-113 (Solar+Battery) | Solar | OK | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| SUNC Interconnection Request GEN-2024-102 (Wind) | Wind (onshore) | KS | 1.5 yrs | 401 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-109 (Wind) | Wind (onshore) | TX | 1.5 yrs | 401 MW | Interconnection study | System Impact Study |
| NEETSW Interconnection Request GEN-2024-124 (Solar+Battery) | Solar | NM | 1.5 yrs | 420 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-128 (Gas) | Gas | OK | 1.5 yrs | 690 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-132 (Gas) | Gas | OK | 1.5 yrs | 1,300 MW | Interconnection study | System Impact Study |
| WERE Interconnection Request GEN-2024-125 (Solar) | Solar | KS | 1.5 yrs | 400 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-134 (Wind) | Wind (onshore) | OK | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-099 (Solar) | Solar | TX | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| WERE Interconnection Request GEN-2024-129 (Gas) | Gas | KS | 1.5 yrs | 910 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-135 (Wind) | Wind (onshore) | OK | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| NEETSW Interconnection Request GEN-2024-139 (Solar) | Solar | KS | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-145 (Wind) | Wind (onshore) | TX | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-143 (Wind) | Wind (onshore) | TX | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| WERE Interconnection Request GEN-2024-142 (Wind) | Wind (onshore) | KS | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-153 (Solar) | Solar | TX | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| NPPD Interconnection Request GEN-2024-140 (Solar) | Solar | NE | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-165 (Solar+Battery) | Solar | OK | 1.5 yrs | 500 MW | Interconnection study | System Impact Study |
| WERE Interconnection Request GEN-2024-166 (Solar+Battery) | Solar | KS | 1.5 yrs | 275 MW | Interconnection study | System Impact Study |
| WERE Interconnection Request GEN-2024-170 (Battery) | Storage | MO | 1.5 yrs | 280 MW | Interconnection study | System Impact Study |
| GRDA Interconnection Request GEN-2024-171 (Battery) | Storage | OK | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| WERE Interconnection Request GEN-2024-176 (Battery) | Storage | KS | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| SUNC Interconnection Request GEN-2024-144 (Wind) | Wind (onshore) | KS | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| BEPC Interconnection Request GEN-2024-141 (Wind) | Wind (onshore) | ND | 1.5 yrs | 424 MW | Interconnection study | System Impact Study |
| SUNC Interconnection Request GEN-2024-137 (Wind) | Wind (onshore) | KS | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-159 (Solar) | Solar | NM | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| SUNC Interconnection Request GEN-2024-138 (Wind) | Wind (onshore) | KS | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| SUNC Interconnection Request GEN-2024-136 (Solar) | Solar | KS | 1.5 yrs | 400 MW | Interconnection study | System Impact Study |
| City of Independence MO Interconnection Request GEN-2024-207 (Gas) | Gas | MO | 1.5 yrs | 779 MW | Interconnection study | System Impact Study |
| OPPD Interconnection Request GEN-2024-212 (Gas) | Gas | NE | 1.5 yrs | 303 MW | Interconnection study | System Impact Study |
| WERE Interconnection Request GEN-2024-217 (Battery) | Storage | MO | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| OPPD Interconnection Request GEN-2024-213 (Gas) | Gas | NE | 1.5 yrs | 360 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-230 (Battery) | Storage | TX | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-221 (Wind) | Wind (onshore) | NM | 1.5 yrs | 400 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-232 (Solar) | Solar | TX | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-235 (Wind) | Wind (onshore) | OK | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-240 (Wind) | Wind (onshore) | OK | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-242 (Battery) | Storage | OK | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| WERE Interconnection Request GEN-2024-249 (Gas) | Gas | KS | 1.5 yrs | 721 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-252 (Gas+Battery) | Storage | OK | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| WERE Interconnection Request GEN-2024-253 (Gas+Battery) | Storage | KS | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-255 (Gas+Battery) | Storage | OK | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| NEETSW Interconnection Request GEN-2024-258 (Wind) | Wind (onshore) | KS | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| OPPD Interconnection Request GEN-2024-211 (Gas) | Gas | NE | 1.5 yrs | 303 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-226 (Solar) | Solar | AR | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| GRDA Interconnection Request GEN-2024-247 (Gas) | Gas | OK | 1.5 yrs | 457 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-254 (Gas+Battery) | Storage | OK | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| ITCGP Interconnection Request GEN-2024-215 (Solar+Battery) | Solar | KS | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-278 (Wind+Battery) | Wind (onshore) | NM | 1.5 yrs | 264 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-280 (Solar+Battery) | Solar | TX | 1.5 yrs | 350 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-291 (Wind) | Wind (onshore) | OK | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| GRDA Interconnection Request GEN-2024-294 (Solar+Battery) | Solar | OK | 1.5 yrs | 500 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-303 (Solar+Battery) | Solar | NM | 1.5 yrs | 500 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-299 (Gas) | Gas | OK | 1.5 yrs | 744 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-304 (Solar+Battery) | Solar | NM | 1.5 yrs | 500 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-317 (Solar) | Solar | TX | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-316 (Solar) | Solar | OK | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-268 (Solar) | Solar | OK | 1.5 yrs | 390 MW | Interconnection study | System Impact Study |
| BEPC Interconnection Request GEN-2024-285 (Wind) | Wind (onshore) | SD | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-281 (Solar+Battery) | Solar | NM | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-271 (Solar+Battery) | Solar | NM | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| WERE Interconnection Request GEN-2024-289 (Solar) | Solar | MO | 1.5 yrs | 350 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-266 (Solar+Battery) | Solar | TX | 1.5 yrs | 500 MW | Interconnection study | System Impact Study |
| ITCGP Interconnection Request GEN-2024-323 (Gas) | Gas | OK | 1.5 yrs | 357 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-321 (Gas) | Gas | OK | 1.5 yrs | 493 MW | Interconnection study | System Impact Study |
| BEPC Interconnection Request GEN-2024-328 (Battery) | Storage | ND | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| BEPC Interconnection Request GEN-2024-331 (Battery) | Storage | ND | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-336 (Solar+Battery) | Solar | TX | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| OGE Interconnection Request GEN-2024-337 (Solar+Battery) | Solar | OK | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-341 (Gas) | Gas | OK | 1.5 yrs | 1,045 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-340 (Gas) | Gas | OK | 1.5 yrs | 1,400 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-338 (Solar) | Solar | OK | 1.5 yrs | 350 MW | Interconnection study | System Impact Study |
| WERE Interconnection Request GEN-2024-339 (Battery) | Storage | KS | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-364 (Solar+Battery) | Solar | TX | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-368 (Battery) | Storage | TX | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| WERE Interconnection Request GEN-2024-370 (Battery) | Storage | MO | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-367 (Battery) | Storage | OK | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-369 (Battery) | Storage | OK | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| SPS Interconnection Request GEN-2024-371 (Battery) | Storage | NM | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| OPPD Interconnection Request GEN-2024-372 (Battery) | Storage | NE | 1.5 yrs | 250 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-343 (Gas) | Gas | TX | 1.5 yrs | 471 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-345 (Wind) | Wind (onshore) | OK | 1.5 yrs | 600 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-377 (Gas) | Gas | TX | 1.5 yrs | 1,350 MW | Interconnection study | System Impact Study |
| AEP Interconnection Request GEN-2024-379 (Gas) | Gas | LA | 1.5 yrs | 1,350 MW | Interconnection study | System Impact Study |
| Niagara Mohawk Power Corporation d/b/a National Grid (NY DPS Case 25-T-0152) | Other | NY | 1.5 yrs | Not disclosed | Local/state review | — |
| Colorado Springs Utilities Interconnection Request CSUT-2025-1 (Wind) | Wind (onshore) | CO | 1.5 yrs | 500 MW | Interconnection study | System Impact Study |
| Colorado Springs Utilities Interconnection Request CSUT-2025-7 (Gas) | Gas | CO | 1.5 yrs | 412 MW | Interconnection study | System Impact Study |
| Interconnection Request 28INR0250 (Solar+Battery) | Solar | TX | 1.5 yrs | 528 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0033 (Wind) | Wind (onshore) | TX | 1.5 yrs | 641 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0032 (Solar) | Solar | TX | 1.5 yrs | 502 MW | Interconnection study | Facility Study |
| METC Interconnection Request J3922 (Gas) | Gas | MI | 1.5 yrs | 1,445 MW | Interconnection study | — |
| ComEd Interconnection Request AG2-363 (Solar) | Solar | IL | 1.5 yrs | 300 MW | Interconnection study | System Impact Study |
| PEPCO Interconnection Request AH1-552 (Solar+Battery) | Solar | MD | 1.5 yrs | 670 MW | Interconnection study | System Impact Study |
| American Transmission Company LLC (WI PSC Docket 137-CE-217) | Transmission | WI | 1.5 yrs | Not disclosed | Local/state review | — |
| ComEd Interconnection Request AG2-545 (Battery) | Storage | IL | 1.5 yrs | 400 MW | Interconnection study | System Impact Study |
| Niagara Mohawk Power Corporation d/b/a National Grid (NY DPS Case 25-T-0178) | Transmission | NY | 1.5 yrs | Not disclosed | Local/state review | — |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J3975 (Solar) | Solar | WI | 1.5 yrs | 417 MW | Interconnection study | — |
| Entergy Louisiana, LLC (LA PSC Docket U-37527) | Transmission | LA | 1.5 yrs | Not disclosed | Local/state review | — |
| Northern States Power Company and Otter Tail Power Company (ND PSC PU-25-089) | Other | ND | 1.5 yrs | 345 kV | Local/state review | — |
| ITC MIDWEST Interconnection Request J3932 (Nuclear) | Nuclear | IA | 1.5 yrs | 646 MW | Interconnection study | — |
| Petition of Niagara Mohawk Power Corporation d/b/a National Grid for Certificate (NY DPS Case 25-T-0184) | Transmission | NY | 1.5 yrs | Not disclosed | Local/state review | — |
| Foundry Ridge Energy Center LLC (WI PSC Docket 9835-CE-100) | Gas | WI | 1.5 yrs | 324 MW | Local/state review | — |
| Westerlo Solar LLC (NY DPS Case 25-00560) | Solar | NY | 1.5 yrs | 40 MW | Local/state review | — |
| Public Service Company of New Mexico Interconnection Request IA-PNM-2025-06 (Solar+Battery) | Solar | NM | 1.5 yrs | 250 MW | Interconnection study | Cluster Study |
| Interconnection Request 26INR0605 (Battery) | Storage | TX | 1.5 yrs | 314 MW | Interconnection study | Facility Study |
| Bath Solar LLC (NY DPS Case 25-00585) | Solar | NY | 1.5 yrs | 185 MW | Local/state review | — |
| Public Service Company of New Mexico Interconnection Request IA-PNM-2025-09 (Battery) | Storage | NM | 1.5 yrs | 400 MW | Interconnection study | Cluster Study |
| Interconnection Request 27INR0443 (Wind) | Wind (onshore) | TX | 1.5 yrs | 473 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0280 (Wind) | Wind (onshore) | TX | 1.5 yrs | 303 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0332 (Solar+Battery) | Solar | TX | 1.5 yrs | 601 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0120 (Gas) | Gas | TX | 1.5 yrs | 846 MW | Interconnection study | Facility Study |
| Public Service Company of New Mexico Interconnection Request IA-PNM-2025-10 (Solar+Battery) | Solar | NM | 1.5 yrs | 400 MW | Interconnection study | Cluster Study |
| The Narragansett Electric Company (TNEC) License Application Woonsocket Substati (RI EFSB SB-2025-01) | Transmission | RI | 1.5 yrs | Not disclosed | Local/state review | — |
| OTTER TAIL POWER COMPANY Interconnection Request J3941 (Gas) | Gas | SD | 1.5 yrs | 1,144 MW | Interconnection study | — |
| Idaho Power Company Interconnection Request 763 (Wind) | Wind (onshore) | ID | 1.4 yrs | 300 MW | Interconnection study | Cluster Study |
| Dominion Interconnection Request AG2-570 (Solar) | Solar | VA | 1.4 yrs | 400 MW | Interconnection study | System Impact Study |
| Heppner Wind Project (OR EFSC) | Wind (onshore) | OR | 1.4 yrs | 190 MW | Local/state review | — |
| Niagara Mohawk Power Corporation d/b/a National Grid (NY DPS Case 25-T-0195) | Transmission | NY | 1.4 yrs | Not disclosed | Local/state review | — |
| Georgia Transmission Interconnection Request GI-210 (Gas) | Gas | GA | 1.4 yrs | 780 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request J3946 (Battery) | Storage | IL | 1.4 yrs | 300 MW | Interconnection study | — |
| ITC Interconnection Request J3977 (Battery) | Storage | MI | 1.4 yrs | 250 MW | Interconnection study | — |
| Duke Energy Progress Interconnection Request PP00027 (Battery) | Storage | NC | 1.4 yrs | 260 MW | Interconnection study | In Progress (unknown study) |
| CLECO POWER Interconnection Request J3939 (Solar) | Solar | LA | 1.4 yrs | 386 MW | Interconnection study | — |
| ITC Interconnection Request J3971 (Wind) | Wind (onshore) | MI | 1.4 yrs | 255 MW | Interconnection study | — |
| ITC Interconnection Request J3966 (Wind) | Wind (onshore) | MI | 1.4 yrs | 480 MW | Interconnection study | — |
| PacifiCorp Interconnection Request S0035 (Gas) | Gas | UT | 1.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 26INR0603 (Solar+Battery) | Solar | TX | 1.4 yrs | 306 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0166 (Battery) | Storage | TX | 1.4 yrs | 351 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0335 (Solar) | Solar | TX | 1.4 yrs | 251 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0327 (Battery) | Storage | TX | 1.4 yrs | 407 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0125 (Solar+Battery) | Solar | TX | 1.4 yrs | 301 MW | Interconnection study | Facility Study |
| EKPC Interconnection Request AH1-721 (Gas) | Gas | KY | 1.4 yrs | 786 MW | Interconnection study | System Impact Study |
| Southern Company Interconnection Request 25-IC-1311 (Battery) | Storage | GA | 1.4 yrs | 500 MW | Interconnection study | Facility Study |
| Southern Company Interconnection Request 25-IC-1312 (Battery) | Storage | GA | 1.4 yrs | 250 MW | Interconnection study | Facility Study |
| Safe Harbor (FERC No. P-1025) | Hydro | PA | 1.4 yrs | 380 MW | Agency permitting | — |
| Idaho Power Company Interconnection Request 772 (Solar+Battery) | Solar | ID | 1.4 yrs | 300 MW | Interconnection study | Cluster Study |
| ME Interconnection Request AH1-695 (Nuclear) | Nuclear | PA | 1.4 yrs | 859 MW | Interconnection study | System Impact Study |
| ATSI Interconnection Request AH1-680 (Gas) | Gas | OH | 1.4 yrs | 1,300 MW | Interconnection study | System Impact Study |
| Idaho Power Company Interconnection Request 759 (Gas) | Gas | ID | 1.4 yrs | 526 MW | Interconnection study | Cluster Study |
| Idaho Power Company Interconnection Request 760 (Gas) | Gas | ID | 1.4 yrs | 526 MW | Interconnection study | Cluster Study |
| KCPL Interconnection Request GEN-2025-SR1 (Battery) | Storage | MO | 1.4 yrs | 400 MW | Interconnection study | Facility Study |
| CITY OF SAN ANTONIO, ACTING BY AND THROUGH THE CITY PUBLIC SERVICE BOARD (CPS ENERGY) (TX PUCT Docket 57849) | Other | TX | 1.4 yrs | Not disclosed | Local/state review | — |
| HALO BETTERTON, LLC (MD PSC Case No. 9786) | Solar | MD | 1.4 yrs | 5 MW | Local/state review | — |
| Dominion Interconnection Request AH1-712 (Gas) | Gas | VA | 1.4 yrs | 776 MW | Interconnection study | System Impact Study |
| Dominion Interconnection Request AH1-723 (Gas) | Gas | VA | 1.4 yrs | 776 MW | Interconnection study | System Impact Study |
| NORTHERN STATES POWER COMPANY Interconnection Request J3964 (Solar) | Solar | SD | 1.4 yrs | 490 MW | Interconnection study | — |
| NORTHERN STATES POWER COMPANY Interconnection Request J3963 (Solar) | Solar | SD | 1.4 yrs | 490 MW | Interconnection study | — |
| OTTER TAIL POWER COMPANY Interconnection Request J3960 (Wind) | Wind (onshore) | MN | 1.4 yrs | 300 MW | Interconnection study | — |
| Dominion Interconnection Request AG2-436 (Solar) | Solar | VA | 1.4 yrs | 350 MW | Interconnection study | System Impact Study |
| Southern Company Interconnection Request 25-IC-1313 (Battery) | Storage | GA | 1.4 yrs | 250 MW | Interconnection study | Facility Study |
| Southern Company Interconnection Request 25-IC-1315 (Solar+Battery) | Solar | AL | 1.4 yrs | 295 MW | Interconnection study | Cluster Study |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J3954 (Solar) | Solar | IL | 1.4 yrs | 250 MW | Interconnection study | — |
| PSEG Interconnection Request AH1-710 (Nuclear) | Nuclear | NJ | 1.4 yrs | 257 MW | Interconnection study | System Impact Study |
| ATSI Interconnection Request AH1-711 (Gas) | Gas | OH | 1.4 yrs | 408 MW | Interconnection study | System Impact Study |
| BGE Interconnection Request AH1-725 (Battery) | Storage | MD | 1.4 yrs | 500 MW | Interconnection study | System Impact Study |
| Dominion Interconnection Request AH1-716 (Battery) | Storage | VA | 1.4 yrs | 650 MW | Interconnection study | System Impact Study |
| Dominion Interconnection Request AH1-727 (Battery) | Storage | VA | 1.4 yrs | 425 MW | Interconnection study | System Impact Study |
| APS Interconnection Request AH1-734 (Gas) | Gas | PA | 1.4 yrs | 270 MW | Interconnection study | System Impact Study |
| Vineyard Mid-Atlantic, LLC and VMA Transmission Corp (NY DPS Case 25-T-0232) | Transmission | NY | 1.4 yrs | Not disclosed | Local/state review | — |
| Southern Company Interconnection Request 25-IC-1326 (Solar) | Solar | GA | 1.4 yrs | 250 MW | Interconnection study | Facility Study |
| Southern Company Interconnection Request 25-IC-1329 (Gas) | Gas | GA | 1.4 yrs | 759 MW | Interconnection study | Facility Study |
| Southern Company Interconnection Request 25-IC-1330 (Gas) | Gas | GA | 1.4 yrs | 759 MW | Interconnection study | Facility Study |
| Southern Company Interconnection Request 25-IC-1327 (Gas) | Gas | GA | 1.4 yrs | 759 MW | Interconnection study | Facility Study |
| Southern Company Interconnection Request 25-IC-1334 (Battery) | Storage | GA | 1.4 yrs | 250 MW | Interconnection study | Cluster Study |
| LONE STAR TRANSMISSION, LLC (TX PUCT Docket 57836) | Other | TX | 1.4 yrs | Not disclosed | Local/state review | — |
| New York Electric & Gas Corporation (NY DPS Case 25-T-0236) | Transmission | NY | 1.4 yrs | Not disclosed | Local/state review | — |
| Idaho Power Company Interconnection Request 792 (Battery) | Storage | ID | 1.4 yrs | 330 MW | Interconnection study | Cluster Study |
| Niagara Mohawk Power Corporation d/b/a National Grid (NY DPS Case 25-T-0235) | Transmission | NY | 1.4 yrs | Not disclosed | Local/state review | — |
| Idaho Power Company Interconnection Request 771 (Solar+Wind+Battery) | Wind (onshore) | OR | 1.4 yrs | 325 MW | Interconnection study | Facility Study |
| DUKE ENERGY INDIANA Interconnection Request J3999 (Gas) | Gas | IN | 1.4 yrs | 1,540 MW | Interconnection study | — |
| Public Service Company Of Colorado Interconnection Request GI-2025-01 (Solar+Battery) | Solar | CO | 1.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| New York State Electric & Gas Corporation (NY DPS Case 25-T-0238) | Other | NY | 1.4 yrs | Not disclosed | Local/state review | — |
| Wild Rose Solar, LLC (NY DPS Case 25-00726) | Solar | NY | 1.4 yrs | 100 MW | Local/state review | — |
| Idaho Power Company Interconnection Request 793 (Solar+Battery) | Solar | ID | 1.4 yrs | 250 MW | Interconnection study | Cluster Study |
| Long Island Lighting Company d/b/a LIPA (NY DPS Case 25-T-0241) | Other | NY | 1.4 yrs | Not disclosed | Local/state review | — |
| AMEREN MISSOURI Interconnection Request J3957 (Solar) | Solar | MO | 1.4 yrs | 300 MW | Interconnection study | — |
| Interconnection Request J3991 (Wind) | Wind (onshore) | IL | 1.4 yrs | 340 MW | Interconnection study | — |
| METC Interconnection Request J3992 (Battery) | Storage | MI | 1.4 yrs | 400 MW | Interconnection study | — |
| METC Interconnection Request J3994 (Battery) | Storage | MI | 1.4 yrs | 360 MW | Interconnection study | — |
| Southern Company Interconnection Request 25-IC-1374 (Battery) | Storage | GA | 1.4 yrs | 600 MW | Interconnection study | Facility Study |
| Southern Company Interconnection Request 25-IC-1375 (Battery) | Storage | GA | 1.4 yrs | 325 MW | Interconnection study | Cluster Study |
| Southern Company Interconnection Request 25-IC-1382 (Gas) | Gas | AL | 1.4 yrs | 707 MW | Interconnection study | Cluster Study |
| Southern Company Interconnection Request 25-IC-1385 (Battery) | Storage | GA | 1.4 yrs | 450 MW | Interconnection study | Cluster Study |
| Vineyard Northeast, LLC (NY DPS Case 25-T-0245) | Transmission | NY | 1.4 yrs | Not disclosed | Local/state review | — |
| New York State Electric & Gas Corporation (NY DPS Case 25-T-0246) | Transmission | NY | 1.4 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 26INR0664 (Gas) | Gas | TX | 1.4 yrs | 655 MW | Interconnection study | Facility Study |
| Interconnection Request 26INR0647 (Wind) | Wind (onshore) | TX | 1.4 yrs | 251 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0150 (Solar+Battery) | Solar | TX | 1.4 yrs | 503 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0451 (Battery) | Storage | TX | 1.4 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0492 (Solar+Battery) | Solar | TX | 1.4 yrs | 301 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0497 (Gas) | Gas | TX | 1.4 yrs | 495 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0499 (Solar) | Solar | TX | 1.4 yrs | 500 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0285 (Battery) | Storage | TX | 1.4 yrs | 410 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0328 (Battery) | Storage | TX | 1.4 yrs | 307 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0122 (Solar) | Solar | TX | 1.4 yrs | 301 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0115 (Solar+Battery) | Solar | TX | 1.4 yrs | 311 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0147 (Solar) | Solar | TX | 1.4 yrs | 300 MW | Interconnection study | Facility Study |
| ENTERGY TEXAS, INC. (TX PUCT Docket 58005) | Transmission | TX | 1.4 yrs | Not disclosed | Local/state review | — |
| Arizona Public Service Interconnection Request Q578 (Other) | Other | AZ | 1.4 yrs | 300 MW | Interconnection study | Cluster Study |
| Public Service Company Of Colorado Interconnection Request GI-2025-09 (Solar) | Solar | CO | 1.4 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request GI-2025-08 (Solar+Battery) | Solar | CO | 1.4 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 27INR0474 (Wind) | Wind (onshore) | TX | 1.4 yrs | 282 MW | Interconnection study | Facility Study |
| Niagara Mohawk Power Corporation d/b/a National Grid (NY DPS Case 25-T-0262) | Transmission | NY | 1.4 yrs | Not disclosed | Local/state review | — |
| Avista Utilities Interconnection Request CS25-09 (Solar+Battery) | Solar | WA | 1.4 yrs | 375 MW | Interconnection study | Cluster Study |
| AMEREN TRANSMISSION COMPANY OF ILLINOIS Interconnection Request J4000 (Solar) | Solar | IL | 1.4 yrs | 343 MW | Interconnection study | — |
| AMEREN MISSOURI Interconnection Request J3996 (Gas) | Gas | MO | 1.4 yrs | 2,220 MW | Interconnection study | — |
| Public Service Company Of Colorado Interconnection Request GI-2025-06 (Solar+Battery) | Solar | CO | 1.4 yrs | 750 MW | Interconnection study | In Progress (unknown study) |
| Avista Utilities Interconnection Request CS25-11 (Wind) | Wind (onshore) | WA | 1.4 yrs | 300 MW | Interconnection study | Cluster Study |
| Avista Utilities Interconnection Request CS25-08 (Battery) | Storage | WA | 1.4 yrs | 250 MW | Interconnection study | Cluster Study |
| Public Service Company Of Colorado Interconnection Request GI-2025-02 (Solar+Battery) | Solar | CO | 1.4 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request GI-2025-03 (Solar+Battery) | Solar | CO | 1.4 yrs | 325 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request GI-2025-04 (Solar+Battery) | Solar | CO | 1.4 yrs | 800 MW | Interconnection study | In Progress (unknown study) |
| Public Service Company Of Colorado Interconnection Request GI-2025-07 (Solar+Battery) | Solar | CO | 1.4 yrs | 360 MW | Interconnection study | In Progress (unknown study) |
| INDIANAPOLIS POWER & LIGHT COMPANY Interconnection Request J4005 (Gas) | Gas | IN | 1.4 yrs | 500 MW | Interconnection study | — |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J4028 (Gas) | Gas | WI | 1.4 yrs | 324 MW | Interconnection study | — |
| Public Service Company Of Colorado Interconnection Request GI-2025-12 (Solar+Battery) | Solar | CO | 1.4 yrs | 355 MW | Interconnection study | In Progress (unknown study) |
| AMEREN ILLINOIS Interconnection Request J4018 (Wind) | Wind (onshore) | IL | 1.3 yrs | 250 MW | Interconnection study | — |
| Arizona Public Service Interconnection Request Q580 (Other) | Other | AZ | 1.3 yrs | 500 MW | Interconnection study | Cluster Study |
| ITC Interconnection Request J4024 (Gas) | Gas | MI | 1.3 yrs | 1,499 MW | Interconnection study | — |
| ITC Interconnection Request J4025 (Gas) | Gas | MI | 1.3 yrs | 1,499 MW | Interconnection study | — |
| Arizona Public Service Interconnection Request Q581 (Other) | Other | AZ | 1.3 yrs | 400 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q584 (Battery) | Storage | AZ | 1.3 yrs | 350 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q586 (Other) | Other | AZ | 1.3 yrs | 300 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q582 (Other) | Other | AZ | 1.3 yrs | 275 MW | Interconnection study | Cluster Study |
| Interconnection Request J4006 (Wind) | Wind (onshore) | IA | 1.3 yrs | 290 MW | Interconnection study | — |
| Arizona Public Service Interconnection Request Q589 (Other) | Other | AZ | 1.3 yrs | 400 MW | Interconnection study | Cluster Study |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 58007) | Transmission | TX | 1.3 yrs | Not disclosed | Local/state review | — |
| Arizona Public Service Interconnection Request Q591 (Other) | Other | AZ | 1.3 yrs | 535 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q595 (Other) | Other | AZ | 1.3 yrs | 250 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q593 (Other) | Other | AZ | 1.3 yrs | 250 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q596 (Other) | Other | AZ | 1.3 yrs | 330 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q594 (Other) | Other | AZ | 1.3 yrs | 250 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q597 (Other) | Other | AZ | 1.3 yrs | 300 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q598 (Other) | Other | AZ | 1.3 yrs | 250 MW | Interconnection study | Cluster Study |
| El Paso Electric Company Interconnection Request Q25-LG-5-13 (Solar+Battery) | Solar | NM | 1.3 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Arizona Public Service Interconnection Request Q599 (Other) | Other | AZ | 1.3 yrs | 500 MW | Interconnection study | Cluster Study |
| HALO ROCK HALL, LLC (MD PSC Case No. 9792) | Solar | MD | 1.3 yrs | 5 MW | Local/state review | — |
| Arizona Public Service Interconnection Request Q606 (Other) | Other | AZ | 1.3 yrs | 350 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q607 (Other) | Other | AZ | 1.3 yrs | 300 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q603 (Other) | Other | AZ | 1.3 yrs | 500 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request J4012 (Solar+Battery) | Solar | AR | 1.3 yrs | 300 MW | Interconnection study | — |
| ITC MIDWEST Interconnection Request J4017 (Solar) | Solar | MN | 1.3 yrs | 299 MW | Interconnection study | — |
| Arizona Public Service Interconnection Request Q609 (Other) | Other | AZ | 1.3 yrs | 500 MW | Interconnection study | Cluster Study |
| BROWNSVILLE PUBLIC UTILITIES BOARD (TX PUCT Docket 58125) | Other | TX | 1.3 yrs | Not disclosed | Local/state review | — |
| Arizona Public Service Interconnection Request Q610 (Other) | Other | NM | 1.3 yrs | 250 MW | Interconnection study | Cluster Study |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 58050) | Transmission | TX | 1.3 yrs | Not disclosed | Local/state review | — |
| ITC Interconnection Request J4016 (Battery) | Storage | MI | 1.3 yrs | 300 MW | Interconnection study | — |
| Arizona Public Service Interconnection Request Q616 (Other) | Other | AZ | 1.3 yrs | 500 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q615 (Other) | Other | AZ | 1.3 yrs | 330 MW | Interconnection study | Cluster Study |
| Arizona Public Service Interconnection Request Q617 (Other) | Other | AZ | 1.3 yrs | 1,000 MW | Interconnection study | Cluster Study |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J4014 (Gas) | Gas | WI | 1.3 yrs | 1,203 MW | Interconnection study | — |
| METC Interconnection Request J4026 (Battery) | Storage | MI | 1.3 yrs | 250 MW | Interconnection study | — |
| AEP TEXAS INC. (TX PUCT Docket 58015) | Transmission | TX | 1.3 yrs | Not disclosed | Local/state review | — |
| INDIANAPOLIS POWER & LIGHT COMPANY Interconnection Request J4021 (Gas) | Gas | IN | 1.3 yrs | 470 MW | Interconnection study | — |
| Interconnection Request 26INR0560 (Gas) | Gas | TX | 1.3 yrs | 506 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0493 (Solar+Battery) | Solar | TX | 1.3 yrs | 261 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0322 (Solar+Battery) | Solar | TX | 1.3 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0323 (Solar+Battery) | Solar | TX | 1.3 yrs | 261 MW | Interconnection study | Facility Study |
| Santee Cooper Interconnection Request 301 (Gas) | Gas | SC | 1.3 yrs | 458 MW | Interconnection study | Cluster Study |
| Santee Cooper Interconnection Request 300 (Gas) | Gas | SC | 1.3 yrs | 458 MW | Interconnection study | Cluster Study |
| Santee Cooper Interconnection Request 308 (Battery) | Storage | SC | 1.3 yrs | 250 MW | Interconnection study | Cluster Study |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 58126) | Transmission | TX | 1.3 yrs | Not disclosed | Local/state review | — |
| Umatilla-Morrow County Connect Project (OR EFSC) | Transmission | OR | 1.3 yrs | 230 kV | Local/state review | — |
| Arizona Public Service Interconnection Request Q618 (Other) | Other | AZ | 1.3 yrs | 250 MW | Interconnection study | Cluster Study |
| Los Angeles Department of Water and Power Interconnection Request Q113 (Solar+Battery) | Solar | NV | 1.3 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| OG&E Interconnection Request GEN-2025-SR9 (Other) | Other | OK | 1.3 yrs | 410 MW | Interconnection study | In Progress (unknown study) |
| The Narragansett Electric Company's (TNEC) Notice of Intent Application for the (RI EFSB SB-2025-03) | Transmission | RI | 1.3 yrs | Not disclosed | Local/state review | — |
| The Narragansett Electric Company's (TNEC) Notice of Intent Application for Q143 (RI EFSB SB-2025-02) | Transmission | RI | 1.3 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 27INR0529 (Solar+Battery) | Solar | TX | 1.3 yrs | 504 MW | Interconnection study | Facility Study |
| Ditch Creek Solar, LLC (NY DPS Case 25-01164) | Solar | NY | 1.3 yrs | 200 MW | Local/state review | — |
| El Paso Electric Company Interconnection Request Q25-LG-6-5 (Battery) | Storage | TX | 1.3 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| WERE Interconnection Request GEN-2025-SR16 (Battery) | Storage | KS | 1.3 yrs | 300 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0535 (Solar+Battery) | Solar | TX | 1.3 yrs | 1,043 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0205 (Solar+Battery) | Solar | TX | 1.3 yrs | 503 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0215 (Wind) | Wind (onshore) | TX | 1.3 yrs | 971 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0288 (Battery) | Storage | TX | 1.3 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0307 (Wind) | Wind (onshore) | TX | 1.3 yrs | 303 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0292 (Battery) | Storage | TX | 1.3 yrs | 359 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0103 (Wind) | Wind (onshore) | TX | 1.3 yrs | 709 MW | Interconnection study | Facility Study |
| ITC Interconnection Request J4203 (Wind) | Wind (onshore) | MI | 1.3 yrs | 350 MW | Interconnection study | — |
| Interconnection Request 29INR0119 (Battery) | Storage | TX | 1.2 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0148 (Solar) | Solar | TX | 1.2 yrs | 506 MW | Interconnection study | Facility Study |
| Black Hills Co (CO PUC Docket 25A-0255E) | Storage | CO | 1.2 yrs | 50 MW | Local/state review | — |
| El Paso Electric Company Interconnection Request Q25-LG-6-13-5 (Battery) | Storage | NM | 1.2 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| El Paso Electric Company Interconnection Request Q25-LG-6-13-6 (Battery) | Storage | NM | 1.2 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| DENTON COUNTY ELECTRIC COOPERATIVE, INC. (TX PUCT Docket 58257) | Other | TX | 1.2 yrs | Not disclosed | Local/state review | — |
| Duke Energy Carolinas Interconnection Request 977286 (Battery) | Storage | NC | 1.2 yrs | 250 MW | Interconnection study | Cluster Study |
| Duke Energy Carolinas Interconnection Request 977301 (Battery) | Storage | NC | 1.2 yrs | 250 MW | Interconnection study | Cluster Study |
| Columbia Project, LLC (WI PSC Docket 9836-CE-100) | Wind (onshore) | WI | 1.2 yrs | 277 MW | Local/state review | — |
| Interconnection Request 26INR0686 (Solar+Battery) | Solar | TX | 1.2 yrs | 1,043 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0409 (Battery) | Storage | TX | 1.2 yrs | 287 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0488 (Solar) | Solar | TX | 1.2 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0260 (Solar+Battery) | Solar | TX | 1.2 yrs | 554 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0281 (Solar) | Solar | TX | 1.2 yrs | 281 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0385 (Solar) | Solar | TX | 1.2 yrs | 302 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0151 (Battery) | Storage | TX | 1.2 yrs | 304 MW | Interconnection study | Facility Study |
| Interconnection Request 30INR0051 (Gas) | Gas | TX | 1.2 yrs | 880 MW | Interconnection study | Facility Study |
| Interconnection Request 30INR0052 (Gas) | Gas | TX | 1.2 yrs | 880 MW | Interconnection study | Facility Study |
| Prairie Song Reliability Project | Storage | CA | 1.2 yrs | 1,150 MW | Local/state review | — |
| Duke Energy Progress Interconnection Request 977298 (Other) | Other | NC | 1.2 yrs | 300 MW | Interconnection study | Cluster Study |
| Duke Energy Carolinas Interconnection Request 977564 (Gas) | Gas | NC | 1.2 yrs | 810 MW | Interconnection study | Cluster Study |
| Duke Energy Progress Interconnection Request 977444 (Gas) | Gas | NC | 1.2 yrs | 495 MW | Interconnection study | Cluster Study |
| Duke Energy Progress Interconnection Request 977454 (Gas) | Gas | NC | 1.2 yrs | 990 MW | Interconnection study | Cluster Study |
| ENTERGY ARKANSAS Interconnection Request S1105 (Other+Battery) | Storage | AR | 1.2 yrs | 300 MW | Interconnection study | — |
| Duke Energy Carolinas Interconnection Request 977731 (Gas) | Gas | NC | 1.2 yrs | 1,395 MW | Interconnection study | Cluster Study |
| Duke Energy Progress Interconnection Request 977773 (Gas) | Gas | NC | 1.2 yrs | 260 MW | Interconnection study | Cluster Study |
| ONEENERGY DEVELOPMENT, LLC (MD PSC Case No. 9796) | Solar | MD | 1.2 yrs | 3 MW | Local/state review | — |
| Duke Energy Carolinas Interconnection Request 977726 (Gas) | Gas | NC | 1.2 yrs | 1,620 MW | Interconnection study | Cluster Study |
| ENTERGY TEXAS , INC. (TX PUCT Docket 58324) | Other | TX | 1.2 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 27INR0504 (Solar) | Solar | TX | 1.2 yrs | 503 MW | Interconnection study | Facility Study |
| AEP TEXAS INC. (TX PUCT Docket 58264) | Transmission | TX | 1.2 yrs | Not disclosed | Local/state review | — |
| TPE MD KE77, LLC (MD PSC Case No. 9799) | Solar | MD | 1.2 yrs | 5 MW | Local/state review | — |
| Tennessee Valley Authority Interconnection Request 25RSC-001 (Gas) | Gas | TN | 1.2 yrs | 692 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 27INR0453 (Solar) | Solar | TX | 1.2 yrs | 273 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0503 (Solar) | Solar | TX | 1.2 yrs | 503 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0536 (Wind) | Wind (onshore) | TX | 1.2 yrs | 493 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0160 (Solar) | Solar | TX | 1.2 yrs | 302 MW | Interconnection study | Facility Study |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 58344) | Transmission | TX | 1.2 yrs | Not disclosed | Local/state review | — |
| Sacramento Municipal Utility District Interconnection Request SC1Q33 (Other) | Other | CA | 1.1 yrs | 250 MW | Interconnection study | Cluster Study |
| Sacramento Municipal Utility District Interconnection Request SC1Q31 (Other) | Other | CA | 1.1 yrs | 400 MW | Interconnection study | Cluster Study |
| BAD CREEK PUMPED STORAGE (FERC No. P-2740) | Hydro | SC | 1.1 yrs | 1,400 MW | Agency permitting | — |
| Entergy Louisiana, LLC (LA PSC Docket U-37677) | Nuclear | LA | 1.1 yrs | Not disclosed | Local/state review | — |
| TEXAS-NEW MEXICO POWER COMPANY (TX PUCT Docket 58416) | Other | TX | 1.1 yrs | Not disclosed | Local/state review | — |
| POTOMAC EDISON COMPANY (MD PSC Case No. 9803) | Transmission | MD | 1.1 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 29INR0146 (Wind) | Wind (onshore) | TX | 1.1 yrs | 306 MW | Interconnection study | Facility Study |
| Interconnection Request G1082 (Solar+Battery) | Solar | WA | 1.1 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1083 (Solar+Battery) | Solar | WA | 1.1 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 26INR0685 (Gas) | Gas | TX | 1.1 yrs | 400 MW | Interconnection study | Facility Study |
| Interconnection Request G1080 (Solar+Battery) | Solar | WA | 1.1 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request G1081 (Solar+Battery) | Solar | WA | 1.1 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Tennessee Valley Authority Interconnection Request 25RSC-005 (Battery) | Storage | KY | 1.1 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| BLACKS MILL ROAD SOLAR 1, LLC (MD PSC Case No. 9804) | Solar | MD | 1.1 yrs | 5 MW | Local/state review | — |
| Associated Electric Cooperative, Incorporated Interconnection Request GI-128 (Gas) | Gas | MO | 1.1 yrs | 460 MW | Interconnection study | System Impact Study |
| Associated Electric Cooperative, Incorporated Interconnection Request GI-129 (Gas) | Gas | OK | 1.1 yrs | 460 MW | Interconnection study | System Impact Study |
| Associated Electric Cooperative, Incorporated Interconnection Request GI-132 (Gas) | Gas | MO | 1.1 yrs | 460 MW | Interconnection study | System Impact Study |
| Associated Electric Cooperative, Incorporated Interconnection Request GI-130 (Gas) | Gas | OK | 1.1 yrs | 460 MW | Interconnection study | System Impact Study |
| Associated Electric Cooperative, Incorporated Interconnection Request GI-131 (Gas) | Gas | MO | 1.1 yrs | 460 MW | Interconnection study | System Impact Study |
| METC Interconnection Request J4040 (Nuclear) | Nuclear | MI | 1.1 yrs | 735 MW | Interconnection study | — |
| Public Service Co (CO PUC Docket 25A-0321E) | Other | CO | 1.1 yrs | 400 MW | Local/state review | — |
| Black Hills Cheyenne Light Fuel and Power Transmission Interconnection Request 37316 (Gas+Battery+Other Storage) | Storage | WY | 1.1 yrs | 600 MW | Interconnection study | Cluster Study |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J3006 (Battery) | Storage | WI | 1.1 yrs | 300 MW | Interconnection study | Cluster Study |
| METC Interconnection Request J3050 (Solar) | Solar | MI | 1.1 yrs | 255 MW | Interconnection study | Cluster Study |
| Tennessee Valley Authority Interconnection Request 25RSC-008 (Battery) | Storage | AL | 1.1 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 28INR0298 (Solar+Battery) | Solar | TX | 1.1 yrs | 427 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0376 (Wind) | Wind (onshore) | TX | 1.1 yrs | 299 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0375 (Wind) | Wind (onshore) | TX | 1.1 yrs | 301 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0394 (Solar+Battery) | Solar | TX | 1.1 yrs | 282 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0408 (Wind) | Wind (onshore) | TX | 1.1 yrs | 353 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0117 (Wind) | Wind (onshore) | TX | 1.1 yrs | 300 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0173 (Battery) | Storage | TX | 1.1 yrs | 618 MW | Interconnection study | Facility Study |
| Interconnection Request 30INR0054 (Gas) | Gas | TX | 1.1 yrs | 880 MW | Interconnection study | Facility Study |
| Interconnection Request 30INR0053 (Solar) | Solar | TX | 1.1 yrs | 500 MW | Interconnection study | Facility Study |
| SOLAR STAR ALLEGANY SOUTH LLC (MD PSC Case No. 9805) | Solar | MD | 1.1 yrs | 4.95 MW | Local/state review | — |
| NV Energy Interconnection Request 25-00406 (Geothermal) | Geothermal | NV | 1.1 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00395 (Solar+Battery) | Solar | NV | 1.1 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00385 (Battery) | Storage | NV | 1.1 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00386 (Battery) | Storage | NV | 1.1 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00394 (Solar+Battery) | Solar | NV | 1.1 yrs | 1,000 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00401 (Solar+Gas+Battery) | Solar | NV | 1.1 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00381 (Solar) | Solar | CA | 1.1 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00384 (Battery) | Storage | NV | 1.1 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00409 (Geothermal) | Geothermal | NV | 1.1 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00412 (Geothermal) | Geothermal | NV | 1.1 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00416 (Solar+Battery) | Solar | NV | 1.1 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00427 (Gas) | Gas | NV | 1.1 yrs | 1,000 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00421 (Solar+Battery) | Solar | AZ | 1.1 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00419 (Gas) | Gas | NV | 1.1 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00428 (Gas) | Gas | NV | 1.1 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00422 (Gas) | Gas | NV | 1.1 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00430 (Gas) | Gas | NV | 1.1 yrs | 570 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00432 (Solar+Battery) | Solar | NV | 1.1 yrs | 900 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00426 (Gas) | Gas | NV | 1.1 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00431 (Battery) | Storage | NV | 1.1 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| NV Energy Interconnection Request 25-00420 (Solar+Battery) | Solar | NV | 1.1 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| NANTICOKE ROAD SOLAR 2, LLC (MD PSC Case No. 9806) | Solar | MD | 1.1 yrs | 5 MW | Local/state review | — |
| MIDAMERICAN ENERGY CO. Interconnection Request S1111 (Gas+Other) | Gas | IA | 1.1 yrs | 263 MW | Interconnection study | — |
| Tennessee Valley Authority Interconnection Request 25RSC-011 (Gas) | Gas | AL | 1.1 yrs | 528 MW | Interconnection study | In Progress (unknown study) |
| Tennessee Valley Authority Interconnection Request 25RSC-009 (Solar+Battery) | Solar | TN | 1.1 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Duke Energy Progress Interconnection Request PP00041 (Other) | Other | NC | 1.1 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Interstate Power and Light Company (IPL) Interconnection Request E0010 (Gas) | Gas | IA | 1.1 yrs | 798 MW | Interconnection study | In Progress (unknown study) |
| Ameren Missouri Interconnection Request E0013 (Solar) | Solar | MO | 1.1 yrs | 310 MW | Interconnection study | In Progress (unknown study) |
| Wisconsin Electric Interconnection Request E0012 (Gas) | Gas | WI | 1.1 yrs | 1,211 MW | Interconnection study | In Progress (unknown study) |
| MidAmerican Energy Company Interconnection Request E0002 (Gas) | Gas | IA | 1.1 yrs | 265 MW | Interconnection study | In Progress (unknown study) |
| DTE Electric Interconnection Request E0018 (Battery) | Storage | MI | 1.1 yrs | 432 MW | Interconnection study | In Progress (unknown study) |
| Wisconsin Electric Power Company Interconnection Request E0016 (Gas) | Gas | WI | 1.1 yrs | 1,211 MW | Interconnection study | In Progress (unknown study) |
| Entergy Louisiana, LLC Interconnection Request E0014 (Gas) | Gas | LA | 1.1 yrs | 1,640 MW | Interconnection study | In Progress (unknown study) |
| AES Indiana Interconnection Request E0021 (Battery) | Storage | IN | 1.1 yrs | 310 MW | Interconnection study | In Progress (unknown study) |
| Interstate Power and Light Company (IPL) Interconnection Request E0015 (Wind) | Wind (onshore) | IA | 1.1 yrs | 360 MW | Interconnection study | In Progress (unknown study) |
| Xcel Energy Interconnection Request E0022 (Battery) | Storage | MN | 1.1 yrs | 310 MW | Interconnection study | In Progress (unknown study) |
| MMPA (Minnesota Municipal Power Agency) Interconnection Request E0023 (Gas) | Gas | MN | 1.1 yrs | 394 MW | Interconnection study | In Progress (unknown study) |
| Great River Energy (GRE) Interconnection Request E0027 (Wind) | Wind (onshore) | ND | 1.1 yrs | 457 MW | Interconnection study | In Progress (unknown study) |
| Entergy Louisiana, LLC Interconnection Request E0029 (Gas) | Gas | LA | 1.1 yrs | 478 MW | Interconnection study | In Progress (unknown study) |
| Xcel Energy Interconnection Request E0026 (Gas) | Gas | MN | 1.1 yrs | 428 MW | Interconnection study | In Progress (unknown study) |
| Entergy Texas, Inc. Interconnection Request E0030 (Gas) | Gas | TX | 1.1 yrs | 820 MW | Interconnection study | In Progress (unknown study) |
| Entergy Mississippi, LLC Interconnection Request E0031 (Gas) | Gas | MS | 1.1 yrs | 820 MW | Interconnection study | In Progress (unknown study) |
| Entergy Texas, Inc. Interconnection Request E0032 (Gas) | Gas | TX | 1.1 yrs | 478 MW | Interconnection study | In Progress (unknown study) |
| NIPSCO Interconnection Request E0033 (Battery) | Storage | IN | 1.1 yrs | 527 MW | Interconnection study | In Progress (unknown study) |
| NIPSCO Interconnection Request E0035 (Gas) | Gas | IN | 1.1 yrs | 1,090 MW | Interconnection study | In Progress (unknown study) |
| Ameren Missouri Interconnection Request E0017 (Battery) | Storage | MO | 1.1 yrs | 258 MW | Interconnection study | In Progress (unknown study) |
| Wisconsin Power and Light Company (WPL) Interconnection Request E0038 (Gas) | Gas | WI | 1.1 yrs | 455 MW | Interconnection study | In Progress (unknown study) |
| Wisconsin Power and Light Company (WPL) Interconnection Request E0037 (Gas) | Gas | WI | 1.1 yrs | 455 MW | Interconnection study | In Progress (unknown study) |
| Xcel Energy Interconnection Request E0040 (Battery) | Storage | MN | 1.1 yrs | 314 MW | Interconnection study | In Progress (unknown study) |
| NIPSCO Interconnection Request E0042 (Gas) | Gas | IN | 1.1 yrs | 2,740 MW | Interconnection study | In Progress (unknown study) |
| Xcel Energy Interconnection Request E0041 (Battery) | Storage | MN | 1.1 yrs | 314 MW | Interconnection study | In Progress (unknown study) |
| Entergy Mississippi, LLC Interconnection Request E0047 (Gas) | Gas | MS | 1.1 yrs | 820 MW | Interconnection study | In Progress (unknown study) |
| Indiana Municipal Power Agency (IMPA) Interconnection Request E0046 (Gas) | Gas | IN | 1.1 yrs | 268 MW | Interconnection study | In Progress (unknown study) |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 58453) | Transmission | TX | 1.1 yrs | Not disclosed | Local/state review | — |
| Sierra Pacific Power Company d/b/a NV Energy (NV PUCN Docket 25-08009) | Gas | NV | 1.1 yrs | 400 MW | Local/state review | — |
| Western Minnesota Municipal Power Agency and Missouri River Energy Services (SD PUC EL25-028) | Transmission | SD | 1.1 yrs | Not disclosed | Local/state review | — |
| New York State Electric & Gas Corporation (NY DPS Case 25-T-0470) | Transmission | NY | 1.1 yrs | Not disclosed | Local/state review | — |
| Los Angeles Department of Water and Power Interconnection Request Q114 (Solar+Battery) | Solar | UT | 1.1 yrs | 345 MW | Interconnection study | In Progress (unknown study) |
| Otter Tail Power Company (ND PSC PU-25-236) | Transmission | ND | 1.1 yrs | 345 kV | Local/state review | — |
| Duke Energy Progress Interconnection Request PP00046 (Other) | Other | NC | 1.1 yrs | 275 MW | Interconnection study | In Progress (unknown study) |
| Basin Electric Power Cooperative Interconnection Request E0034 (Gas) | Gas | SD | 1.1 yrs | 265 MW | Interconnection study | In Progress (unknown study) |
| DUKE ENERGY INDIANA Interconnection Request J3084 (Gas) | Gas | IN | 1.1 yrs | 642 MW | Interconnection study | Cluster Study |
| NIPSCO Interconnection Request E0039 (Battery) | Storage | IN | 1.1 yrs | 630 MW | Interconnection study | In Progress (unknown study) |
| METC Interconnection Request J4159 (Gas) | Gas | MI | 1.1 yrs | 664 MW | Interconnection study | — |
| METC Interconnection Request J4160 (Gas) | Gas | MI | 1.1 yrs | 425 MW | Interconnection study | — |
| Tennessee Valley Authority Interconnection Request 25RSC-012 (Gas) | Gas | TN | 1.1 yrs | 752 MW | Interconnection study | In Progress (unknown study) |
| OG&E Interconnection Request GEN-2025-SR28 (Battery) | Storage | OK | 1.1 yrs | 263 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 28INR0325 (Gas) | Gas | TX | 1.1 yrs | 335 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0351 (Gas) | Gas | TX | 1.1 yrs | 334 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0415 (Wind) | Wind (onshore) | TX | 1.1 yrs | 474 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0353 (Gas) | Gas | TX | 1.1 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0188 (Solar) | Solar | TX | 1.1 yrs | 415 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0184 (Solar) | Solar | TX | 1.1 yrs | 400 MW | Interconnection study | Facility Study |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 58562) | Transmission | TX | 1.0 yrs | Not disclosed | Local/state review | — |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 58561) | Transmission | TX | 1.0 yrs | Not disclosed | Local/state review | — |
| ITC Interconnection Request J4058 (Battery) | Storage | MI | 1.0 yrs | 250 MW | Interconnection study | — |
| RWE Solar Development, LLC (NY DPS Case 25-01765) | Solar | NY | 1.0 yrs | Not disclosed | Local/state review | — |
| ITC MIDWEST Interconnection Request R5071 (Nuclear) | Nuclear | IA | 1.0 yrs | 251 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-008 (Solar+Battery) | Solar | OR | 1.0 yrs | 500 MW | Interconnection study | — |
| Interconnection Request 27INR0556 (Solar+Battery) | Solar | TX | 1.0 yrs | 301 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0324 (Solar) | Solar | TX | 1.0 yrs | 312 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0171 (Solar+Battery) | Solar | TX | 1.0 yrs | 301 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0172 (Solar+Battery) | Solar | TX | 1.0 yrs | 310 MW | Interconnection study | Facility Study |
| TOCE SC Solar 1, LLC (SC PSC Docket 2025-253-E) | Solar | SC | 1.0 yrs | 170 MW | Local/state review | — |
| Interconnection Request J4056 (Wind) | Wind (onshore) | IA | 1.0 yrs | 310 MW | Interconnection study | — |
| Interconnection Request 29INR0175 (Gas) | Gas | TX | 1.0 yrs | 991 MW | Interconnection study | Facility Study |
| American Transmission Company LLC (WI PSC Docket 137-CE-221) | Transmission | WI | 1.0 yrs | Not disclosed | Local/state review | — |
| Entergy Louisiana, LLC Interconnection Request E0043 (Gas) | Gas | LA | 1.0 yrs | 1,640 MW | Interconnection study | In Progress (unknown study) |
| Entergy Louisiana, LLC Interconnection Request E0044 (Gas) | Gas | LA | 1.0 yrs | 1,640 MW | Interconnection study | In Progress (unknown study) |
| Entergy Louisiana, LLC Interconnection Request E0045 (Gas) | Gas | LA | 1.0 yrs | 770 MW | Interconnection study | In Progress (unknown study) |
| PacifiCorp Interconnection Request T2-013 (Nuclear) | Nuclear | UT | 1.0 yrs | 500 MW | Interconnection study | — |
| WAPA Rocky Mountain Region Interconnection Request 2025-G3 (Wind) | Wind (onshore) | — | 1.0 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| PacifiCorp Interconnection Request T2-017 (Gas) | Gas | WY | 1.0 yrs | 600 MW | Interconnection study | — |
| WAPA Rocky Mountain Region Interconnection Request 2025-G4 (Wind) | Wind (onshore) | — | 1.0 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| PacifiCorp Interconnection Request T2-020 (Gas) | Gas | UT | 1.0 yrs | 363 MW | Interconnection study | — |
| Public Service Company (CO PUC Docket 25A-0367E) | Other | CO | 1.0 yrs | Not disclosed | Local/state review | — |
| Interconnection Request J4198 (Battery) | Storage | IL | 1.0 yrs | 250 MW | Interconnection study | — |
| HOPEWELL RANCH SOLAR 1, LLC (MD PSC Case No. 9811) | Solar | MD | 1.0 yrs | 2.5 MW | Local/state review | — |
| DUKE ENERGY INDIANA Interconnection Request J4063 (Wind) | Wind (onshore) | IN | 1.0 yrs | 300 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-028 (Solar+Battery) | Solar | UT | 1.0 yrs | 300 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-023 (Solar+Battery) | Solar | UT | 1.0 yrs | 275 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-029 (Solar+Battery) | Solar | ID | 1.0 yrs | 398 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-031 (Solar+Battery) | Solar | OR | 1.0 yrs | 400 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-030 (Solar+Battery) | Solar | OR | 1.0 yrs | 400 MW | Interconnection study | — |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2026-0058) | Transmission | MO | 1.0 yrs | Not disclosed | Local/state review | — |
| PacifiCorp Interconnection Request T2-025 (Wind) | Wind (onshore) | ID | 1.0 yrs | 300 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-033 (Gas) | Gas | WY | 1.0 yrs | 600 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-034 (Gas) | Gas | WY | 1.0 yrs | 600 MW | Interconnection study | — |
| Yellow Rosebush Energy Center (OR EFSC) | Solar | OR | 1.0 yrs | 800 MW | Local/state review | — |
| Interconnection Request 28INR0423 (Solar+Battery) | Solar | TX | 1.0 yrs | 310 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0422 (Solar+Battery) | Solar | TX | 1.0 yrs | 301 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0042 (Wind) | Wind (onshore) | TX | 1.0 yrs | 310 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0169 (Battery) | Storage | TX | 1.0 yrs | 517 MW | Interconnection study | Facility Study |
| Interconnection Request 30INR0058 (Solar) | Solar | TX | 1.0 yrs | 400 MW | Interconnection study | Facility Study |
| Woodward Park North Columbus High Pressure (NCHP) System Pipeline Project (OH OPSB Case 25-0838-GA-BTX) | Pipeline | OH | 1.0 yrs | Not disclosed | Local/state review | — |
| PacifiCorp Interconnection Request T2-040 (Gas) | Gas | ID | 1.0 yrs | 400 MW | Interconnection study | — |
| OGE Interconnection Request ERAS-2025-010 (Gas) | Gas | OK | 1.0 yrs | 496 MW | Interconnection study | In Progress (unknown study) |
| ENTERGY TEXAS, INC. (TX PUCT Docket 58662) | Transmission | TX | 1.0 yrs | Not disclosed | Local/state review | — |
| PacifiCorp Interconnection Request T2-051 (Solar+Battery) | Solar | WY | 1.0 yrs | 330 MW | Interconnection study | — |
| Public Service Company (CO PUC Docket 25A-0373E) | Other | CO | 1.0 yrs | Not disclosed | Local/state review | — |
| BLOOMINGTON HILL 1, LLC AND BLOOMINGTON HILL 2, LLC (MD PSC Case No. 9812) | Solar | MD | 1.0 yrs | 9.9 MW | Local/state review | — |
| PacifiCorp Interconnection Request T2-052 (Solar+Battery) | Solar | UT | 1.0 yrs | 340 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-056 (Solar+Battery) | Solar | UT | 1.0 yrs | 300 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-070 (Solar+Battery) | Solar | OR | 1.0 yrs | 640 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-076 (Solar+Battery) | Solar | UT | 1.0 yrs | 400 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-057 (Wind) | Wind (onshore) | WY | 1.0 yrs | 400 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-075 (Battery) | Storage | UT | 1.0 yrs | 300 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-059 (Gas) | Gas | UT | 1.0 yrs | 300 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-086 (Solar+Battery) | Solar | OR | 1.0 yrs | 400 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-083 (Battery) | Storage | UT | 1.0 yrs | 400 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-084 (Battery) | Storage | UT | 1.0 yrs | 500 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-081 (Solar+Battery) | Solar | OR | 1.0 yrs | 1,280 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-082 (Solar+Battery) | Solar | OR | 1.0 yrs | 1,280 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-087 (Solar+Battery) | Solar | OR | 1.0 yrs | 400 MW | Interconnection study | — |
| PacifiCorp Interconnection Request T2-085 (Solar+Battery) | Solar | UT | 1.0 yrs | 400 MW | Interconnection study | — |
| North Creek Solar, LLC (NY DPS Case 25-01934) | Solar | NY | 1.0 yrs | 200 MW | Local/state review | — |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2026-0069) | Other | MO | 1.0 yrs | Not disclosed | Local/state review | — |
| Tri-State Generation and Transmission Association Interconnection Request GI-CS-2025-03 (Solar+Battery) | Solar | CO | 1.0 yrs | 300 MW | Interconnection study | Cluster Study |
| METC Interconnection Request J4167 (Battery) | Storage | MI | 1.0 yrs | 250 MW | Interconnection study | — |
| Tri-State Generation and Transmission Association Interconnection Request GI-CS-2025-04 (Wind+Battery) | Wind (onshore) | WY | 1.0 yrs | 330 MW | Interconnection study | Cluster Study |
| Tri-State Generation and Transmission Association Interconnection Request GI-CS-2025-05 (Solar) | Solar | CO | 1.0 yrs | 300 MW | Interconnection study | Cluster Study |
| Cleco Power LLC Interconnection Request E0048 (Gas) | Gas | LA | 1.0 yrs | 775 MW | Interconnection study | In Progress (unknown study) |
| ENTERGY MISSISSIPPI, LLC. Interconnection Request J4121 (Solar) | Solar | MS | 1.0 yrs | 300 MW | Interconnection study | — |
| New York State Electric & Gas Corporation (NY DPS Case 25-T-0607) | Transmission | NY | 1.0 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 28INR0447 (Wind) | Wind (onshore) | TX | 1.0 yrs | 290 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0446 (Wind) | Wind (onshore) | TX | 1.0 yrs | 290 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0183 (Solar) | Solar | TX | 1.0 yrs | 304 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0180 (Gas) | Gas | TX | 1.0 yrs | 1,252 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0181 (Solar) | Solar | TX | 1.0 yrs | 304 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0182 (Solar) | Solar | TX | 1.0 yrs | 304 MW | Interconnection study | Facility Study |
| The Narragansett Electric Company's (TNEC) Notice of Intent Application F184N-4& (RI EFSB SB-2025-04) | Transmission | RI | 1.0 yrs | Not disclosed | Local/state review | — |
| BESSIE CLEMSON ROAD SOLAR, LLC (MD PSC Case No. 9814) | Solar | MD | 1.0 yrs | 5 MW | Local/state review | — |
| ITC Interconnection Request J4066 (Solar) | Solar | MI | 1.0 yrs | 250 MW | Interconnection study | — |
| Interconnection Request J4118 (Battery) | Storage | IL | 1.0 yrs | 250 MW | Interconnection study | — |
| SEPC Interconnection Request ERAS-2025-017 (Gas) | Gas | KS | 1.0 yrs | 600 MW | Interconnection study | In Progress (unknown study) |
| SEPC Interconnection Request ERAS-2025-015 (Solar+Battery) | Solar | KS | 1.0 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| CAPE HORN ROAD SOLAR, LLC (MD PSC Case No. 9815) | Solar | MD | 1.0 yrs | 4 MW | Local/state review | — |
| NORTHERN STATES POWER COMPANY Interconnection Request J4161 (Solar) | Solar | MN | 0.9 yrs | 1,000 MW | Interconnection study | — |
| LONE STAR TRANSMISSION, LLC (TX PUCT Docket 58632) | Transmission | TX | 0.9 yrs | Not disclosed | Local/state review | — |
| LONE STAR TRANSMISSION, LLC (TX PUCT Docket 58764) | Transmission | TX | 0.9 yrs | Not disclosed | Local/state review | — |
| Public Service Company (CO PUC Docket 25A-0409E) | Other | CO | 0.9 yrs | Not disclosed | Local/state review | — |
| FPS Cedar Creek Solar LLC (DE PSC Docket 25-0968) | Transmission | DE | 0.9 yrs | Not disclosed | Local/state review | — |
| HARFORD CALVARY SOLAR 1, LLC (MD PSC Case No. 9816) | Solar | MD | 0.9 yrs | 2.5 MW | Local/state review | — |
| ENTERGY ARKANSAS Interconnection Request J4074 (Solar) | Solar | AR | 0.9 yrs | 300 MW | Interconnection study | — |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J4164 (Gas) | Gas | WI | 0.9 yrs | 1,203 MW | Interconnection study | — |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J4165 (Gas) | Gas | WI | 0.9 yrs | 1,203 MW | Interconnection study | — |
| ENTERGY ARKANSAS Interconnection Request J4196 (Solar) | Solar | AR | 0.9 yrs | 300 MW | Interconnection study | — |
| EMDE Interconnection Request ERAS-2025-034 (Gas) | Gas | MO | 0.9 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Tri-State Generation and Transmission Association Interconnection Request GI-CS-2025-21 (Solar+Battery) | Solar | CO | 0.9 yrs | 325 MW | Interconnection study | Cluster Study |
| CLECO POWER Interconnection Request J4201 (Solar+Battery) | Solar | LA | 0.9 yrs | 250 MW | Interconnection study | — |
| OGE Interconnection Request ERAS-2025-004 (Gas) | Gas | OK | 0.9 yrs | 763 MW | Interconnection study | In Progress (unknown study) |
| WERE Interconnection Request ERAS-2025-006 (Gas) | Gas | KS | 0.9 yrs | 718 MW | Interconnection study | In Progress (unknown study) |
| WERE Interconnection Request ERAS-2025-008 (Gas) | Gas | KS | 0.9 yrs | 721 MW | Interconnection study | In Progress (unknown study) |
| WERE Interconnection Request ERAS-2025-013 (Gas) | Gas | MO | 0.9 yrs | 451 MW | Interconnection study | In Progress (unknown study) |
| GRDA Interconnection Request ERAS-2025-009 (Coal) | Other | OK | 0.9 yrs | 450 MW | Interconnection study | In Progress (unknown study) |
| BEPC Interconnection Request ERAS-2025-012 (Gas) | Gas | ND | 0.9 yrs | 750 MW | Interconnection study | In Progress (unknown study) |
| BEPC Interconnection Request ERAS-2025-011 (Gas) | Gas | ND | 0.9 yrs | 750 MW | Interconnection study | In Progress (unknown study) |
| HERMAN HIGHWAY SOLAR 1, LLC (MD PSC Case No. 9817) | Solar | MD | 0.9 yrs | 3 MW | Local/state review | — |
| Northland Solar LLC (VT 25-2346-PET) | Solar | VT | 0.9 yrs | 4.999 MW | Local/state review | — |
| WERE Interconnection Request ERAS-2025-007 (Gas) | Gas | MO | 0.9 yrs | 451 MW | Interconnection study | In Progress (unknown study) |
| SPS Interconnection Request ERAS-2025-021 (Wind) | Wind (onshore) | TX | 0.9 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| AEP Interconnection Request ERAS-2025-024 (Gas) | Gas | OK | 0.9 yrs | 744 MW | Interconnection study | In Progress (unknown study) |
| SPS Interconnection Request ERAS-2025-028 (Solar) | Solar | TX | 0.9 yrs | 384 MW | Interconnection study | In Progress (unknown study) |
| SPS Interconnection Request ERAS-2025-030 (Solar+Battery) | Solar | NM | 0.9 yrs | 350 MW | Interconnection study | In Progress (unknown study) |
| SPS Interconnection Request ERAS-2025-020 (Solar+Battery) | Solar | NM | 0.9 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| SPS Interconnection Request ERAS-2025-018 (Solar+Battery) | Solar | NM | 0.9 yrs | 256 MW | Interconnection study | In Progress (unknown study) |
| AEP Interconnection Request ERAS-2025-026 (Gas) | Gas | OK | 0.9 yrs | 744 MW | Interconnection study | In Progress (unknown study) |
| AEP Interconnection Request ERAS-2025-023 (Gas) | Gas | OK | 0.9 yrs | 510 MW | Interconnection study | In Progress (unknown study) |
| SPS Interconnection Request ERAS-2025-027 (Battery) | Storage | TX | 0.9 yrs | 250 MW | Interconnection study | In Progress (unknown study) |
| Tri-State Generation and Transmission Association Interconnection Request GI-CS-2025-25 (Solar+Battery) | Solar | WY | 0.9 yrs | 800 MW | Interconnection study | Cluster Study |
| Williston G Katie Lane Solar, LLC (VT 25-2356-PET) | Solar | VT | 0.9 yrs | 2.9 MW | Local/state review | — |
| MINNESOTA POWER INC. Interconnection Request J4132 (Solar) | Solar | MN | 0.9 yrs | 304 MW | Interconnection study | — |
| CLECO POWER Interconnection Request J4133 (Gas) | Gas | LA | 0.9 yrs | 756 MW | Interconnection study | — |
| NORTHERN STATES POWER COMPANY Interconnection Request J4168 (Battery) | Storage | MN | 0.9 yrs | 330 MW | Interconnection study | — |
| Interconnection Request 28INR0434 (Wind) | Wind (onshore) | TX | 0.9 yrs | 367 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0433 (Solar) | Solar | TX | 0.9 yrs | 301 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0167 (Gas) | Gas | TX | 0.9 yrs | 449 MW | Interconnection study | Facility Study |
| Public Service Company of New Hampshire d/b/a Eversource Energy (NH SEC 25-072) | Transmission | NH | 0.9 yrs | Not disclosed | Local/state review | — |
| THE POTOMAC EDISON COMPANY ‘S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENC (MD PSC Case No. 9818) | Transmission | MD | 0.9 yrs | Not disclosed | Local/state review | — |
| MINNESOTA MUNICIPAL POWER AGENCY Interconnection Request J4072 (Battery) | Storage | MN | 0.9 yrs | 500 MW | Interconnection study | — |
| NORTHERN STATES POWER COMPANY Interconnection Request J4078 (Battery) | Storage | MN | 0.9 yrs | 500 MW | Interconnection study | — |
| ENTERGY LOUISIANA Interconnection Request J4076 (Battery) | Storage | LA | 0.9 yrs | 400 MW | Interconnection study | — |
| OTTER TAIL POWER COMPANY Interconnection Request J4091 (Solar) | Solar | MN | 0.9 yrs | 295 MW | Interconnection study | — |
| CLECO POWER Interconnection Request J4075 (Battery) | Storage | LA | 0.9 yrs | 300 MW | Interconnection study | — |
| ITC Interconnection Request J4094 (Battery) | Storage | MI | 0.9 yrs | 300 MW | Interconnection study | — |
| ENTERGY ARKANSAS Interconnection Request J4088 (Solar+Battery) | Solar | AR | 0.9 yrs | 340 MW | Interconnection study | — |
| METC Interconnection Request J4093 (Battery) | Storage | MI | 0.9 yrs | 400 MW | Interconnection study | — |
| ITC Interconnection Request J4095 (Battery) | Storage | MI | 0.9 yrs | 300 MW | Interconnection study | — |
| CLECO POWER Interconnection Request J4098 (Battery) | Storage | LA | 0.9 yrs | 300 MW | Interconnection study | — |
| OTTER TAIL POWER COMPANY Interconnection Request J4105 (Solar+Battery) | Solar | ND | 0.9 yrs | 500 MW | Interconnection study | — |
| ENTERGY LOUISIANA Interconnection Request J4100 (Battery) | Storage | LA | 0.9 yrs | 500 MW | Interconnection study | — |
| OTTER TAIL POWER COMPANY Interconnection Request J4106 (Solar+Battery) | Solar | ND | 0.9 yrs | 500 MW | Interconnection study | — |
| ITC MIDWEST Interconnection Request J4113 (Gas) | Gas | IA | 0.9 yrs | 1,315 MW | Interconnection study | — |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J4115 (Gas) | Gas | WI | 0.9 yrs | 525 MW | Interconnection study | — |
| MIDAMERICAN ENERGY CO. Interconnection Request J4114 (Gas) | Gas | IA | 0.9 yrs | 525 MW | Interconnection study | — |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J4116 (Gas) | Gas | WI | 0.9 yrs | 950 MW | Interconnection study | — |
| MINNESOTA MUNICIPAL POWER AGENCY Interconnection Request J4152 (Solar) | Solar | MN | 0.9 yrs | 250 MW | Interconnection study | — |
| AMERICAN TRANSMISSION COMPANY Interconnection Request J4144 (Gas) | Gas | WI | 0.9 yrs | 525 MW | Interconnection study | — |
| ENTERGY LOUISIANA Interconnection Request J4190 (Gas) | Gas | LA | 0.9 yrs | 707 MW | Interconnection study | — |
| Tri-State Generation and Transmission Association Interconnection Request GI-CS-2025-29 (Solar+Wind+Battery) | Wind (onshore) | CO | 0.9 yrs | 300 MW | Interconnection study | Cluster Study |
| ENTERGY LOUISIANA Interconnection Request J4071 (Gas) | Gas | LA | 0.9 yrs | 1,500 MW | Interconnection study | — |
| ENTERGY ARKANSAS Interconnection Request J4080 (Solar) | Solar | AR | 0.9 yrs | 250 MW | Interconnection study | — |
| ITC MIDWEST Interconnection Request J4089 (Battery) | Storage | MN | 0.9 yrs | 250 MW | Interconnection study | — |
| ENTERGY ARKANSAS Interconnection Request J4082 (Battery) | Storage | AR | 0.9 yrs | 500 MW | Interconnection study | — |
| OTTER TAIL POWER COMPANY Interconnection Request J4081 (Battery) | Storage | SD | 0.9 yrs | 250 MW | Interconnection study | — |
| MIDAMERICAN ENERGY CO. Interconnection Request J4112 (Wind) | Wind (onshore) | IL | 0.9 yrs | 300 MW | Interconnection study | — |
| CLECO POWER Interconnection Request J4110 (Gas) | Gas | LA | 0.9 yrs | 400 MW | Interconnection study | — |
| Interconnection Request J4138 (Gas) | Gas | LA | 0.9 yrs | 805 MW | Interconnection study | — |
| OTTER TAIL POWER COMPANY Interconnection Request J4153 (Battery) | Storage | SD | 0.9 yrs | 250 MW | Interconnection study | — |
| NORTHERN STATES POWER COMPANY Interconnection Request J4194 (Battery) | Storage | MN | 0.9 yrs | 500 MW | Interconnection study | — |
| Interconnection Request J4191 (Gas) | Gas | LA | 0.9 yrs | 805 MW | Interconnection study | — |
| GRH Growth LLC (VT 25-2412-PET) | Solar | VT | 0.9 yrs | 3.5 MW | Local/state review | — |
| Interconnection Request J4195 (Wind) | Wind (onshore) | MI | 0.9 yrs | 300 MW | Interconnection study | — |
| METC Interconnection Request J4102 (Solar) | Solar | MI | 0.9 yrs | 539 MW | Interconnection study | — |
| Interstate Power and Light Company (IPL) Interconnection Request E0049 (Gas) | Gas | IA | 0.9 yrs | 798 MW | Interconnection study | In Progress (unknown study) |
| Dawn Break Solar, LLC (WI PSC Docket 9825-CE-100) | Solar | WI | 0.9 yrs | 180 MW | Local/state review | — |
| ECKARD ROAD SOLAR LLC (MD PSC Case No. 9821) | Solar | MD | 0.9 yrs | 3 MW | Local/state review | — |
| OLD PRINCESS ANNE COMMUNITY ENERGY INITIATIVE, LLC (MD PSC Case No. 9822) | Solar | MD | 0.9 yrs | 2.25 MW | Local/state review | — |
| Wisconsin Electric Power Company (WI PSC Docket 6630-CE-318) | Gas | WI | 0.9 yrs | Not disclosed | Local/state review | — |
| ENTERGY ARKANSAS Interconnection Request S1125 (Solar+Battery) | Solar | AR | 0.9 yrs | 400 MW | Interconnection study | — |
| Interconnection Request 27INR0572 (Gas) | Gas | TX | 0.9 yrs | 371 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0150 (Gas) | Gas | TX | 0.9 yrs | 1,274 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0162 (Gas) | Gas | TX | 0.9 yrs | 1,204 MW | Interconnection study | Facility Study |
| Northern States Power Company–Wisconsin (WI PSC Docket 4220-CE-190) | Solar | WI | 0.9 yrs | Not disclosed | Local/state review | — |
| MD AMERICAN KESTREL, LLC (MD PSC Case No. 9823) | Solar | MD | 0.9 yrs | 5 MW | Local/state review | — |
| Entergy Louisiana, LLC Interconnection Request E0051 (Gas) | Gas | LA | 0.9 yrs | 377 MW | Interconnection study | In Progress (unknown study) |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 58879) | Transmission | TX | 0.9 yrs | Not disclosed | Local/state review | — |
| Speedway Energy Facility (OR EFSC) | Solar | OR | 0.9 yrs | 1,400 MW | Local/state review | — |
| HEMLOCK LANE SOLAR 1, LLC (MD PSC Case No. 9824) | Solar | MD | 0.9 yrs | 4 MW | Local/state review | — |
| WOODSIDE SOLAR 1, LLC (MD PSC Case No. 9825) | Solar | MD | 0.9 yrs | 5 MW | Local/state review | — |
| SOLTAGE MD DEVCO, LLC AND BERLIN LIVING, LLC (MD PSC Case No. 9826) | Solar | MD | 0.9 yrs | 18 MW | Local/state review | — |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 58848) | Transmission | TX | 0.9 yrs | Not disclosed | Local/state review | — |
| New York State Electric & Gas Corporation (NY DPS Case 25-T-0679) | Transmission | NY | 0.9 yrs | Not disclosed | Local/state review | — |
| LSE AQUARIUS LLC (MD PSC Case No. 9827) | Solar | MD | 0.9 yrs | 2.988 MW | Local/state review | — |
| BRAZOS ELECTRIC POWER COOPERATIVE, INC. (BRAZOS ELECTRIC) (TX PUCT Docket 58865) | Transmission | TX | 0.9 yrs | Not disclosed | Local/state review | — |
| Robin Storage 1, LLC (WI PSC Docket 9839-CE-100) | Storage | WI | 0.9 yrs | 200 MW | Local/state review | — |
| Dove Storage 1, LLC (WI PSC Docket 9838-CE-100) | Storage | WI | 0.9 yrs | 200 MW | Local/state review | — |
| CHABERTON SOLAR LAMBS KNOLL LLC (MD PSC Case No. 9828) | Solar | MD | 0.9 yrs | 5 MW | Local/state review | — |
| HARFORD CHAPEL SOLAR, LLC (MD PSC Case No. 9829) | Solar | MD | 0.8 yrs | 5 MW | Local/state review | — |
| Hallador Power Interconnection Request E0054 (Gas+Battery) | Storage | IN | 0.8 yrs | 530 MW | Interconnection study | In Progress (unknown study) |
| PacifiCorp Interconnection Request S0039 (Nuclear) | Nuclear | WY | 0.8 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q116 (Battery) | Storage | NV | 0.8 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Los Angeles Department of Water and Power Interconnection Request Q115 (Battery) | Storage | NV | 0.8 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interstate Power and Light Company (IPL) Interconnection Request E0050 (Gas) | Gas | IA | 0.8 yrs | 987 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 27INR0334 (Wind) | Wind (onshore) | TX | 0.8 yrs | 740 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0571 (Battery) | Storage | TX | 0.8 yrs | 750 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0582 (Gas) | Gas | TX | 0.8 yrs | 1,238 MW | Interconnection study | Facility Study |
| Interconnection Request 27INR0581 (Gas) | Gas | TX | 0.8 yrs | 1,238 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0114 (Solar) | Solar | TX | 0.8 yrs | 500 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0466 (Battery) | Storage | TX | 0.8 yrs | 750 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0472 (Battery) | Storage | TX | 0.8 yrs | 514 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0473 (Battery) | Storage | TX | 0.8 yrs | 514 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0206 (Gas) | Gas | TX | 0.8 yrs | 942 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0192 (Solar) | Solar | TX | 0.8 yrs | 302 MW | Interconnection study | Facility Study |
| Williston H Solar, LLC (VT 25-2774-PET) | Solar | VT | 0.8 yrs | 2.75 MW | Local/state review | — |
| SPS Interconnection Request GEN-2025-GR6 (Wind) | Wind (onshore) | TX | 0.8 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| RESH ROAD SOLAR 2 LLC (MD PSC Case No. 9831) | Solar | MD | 0.8 yrs | 4.25 MW | Local/state review | — |
| Chestnut Run Energy Transmission Line (OH OPSB Case 25-1066-EL-BTX) | Transmission | OH | 0.8 yrs | Not disclosed | Local/state review | — |
| Pinopolis Reliability Project LLC (SC PSC Docket 2025-318-E) | Storage | SC | 0.8 yrs | 300 MW | Local/state review | — |
| HOOSIER ENERGY Interconnection Request J3114 (Solar+Battery) | Solar | IN | 0.8 yrs | 300 MW | Interconnection study | Cluster Study |
| Santee Cooper Interconnection Request GenRep1 (Battery) | Storage | SC | 0.8 yrs | 300 MW | Interconnection study | In Progress (unknown study) |
| Great Basin Transmission, LLC (NV PUCN Docket 25-11011) | Transmission | NV | 0.8 yrs | Not disclosed | Local/state review | — |
| Louisville Gas & Electric and Kentucky Utilities Energy Interconnection Request LGE-CS2025-001 (Battery) | Storage | KY | 0.8 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 26INR0635 (Solar) | Solar | TX | 0.8 yrs | 500 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0459 (Gas) | Gas | TX | 0.8 yrs | 950 MW | Interconnection study | Facility Study |
| Interconnection Request 32INR0003 (Gas) | Gas | TX | 0.8 yrs | 1,381 MW | Interconnection study | Facility Study |
| WAPA Rocky Mountain Region Interconnection Request 2025-G7 (Wind) | Wind (onshore) | — | 0.8 yrs | 400 MW | Interconnection study | In Progress (unknown study) |
| Louisville Gas & Electric and Kentucky Utilities Energy Interconnection Request LGE-CS2025-002 (Gas) | Gas | KY | 0.8 yrs | 680 MW | Interconnection study | In Progress (unknown study) |
| ICFTS MD SOLAR, LLC (MD PSC Case No. 9835) | Solar | MD | 0.8 yrs | 4.63 MW | Local/state review | — |
| CHABERTON SOLAR HAYFORD LLC (MD PSC Case No. 9834) | Solar | MD | 0.8 yrs | 4 MW | Local/state review | — |
| Interconnection Request 29INR0217 (Battery) | Storage | TX | 0.8 yrs | 999 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0219 (Solar) | Solar | TX | 0.8 yrs | 301 MW | Interconnection study | Facility Study |
| Interconnection Request 30INR0071 (Gas) | Gas | TX | 0.8 yrs | 1,660 MW | Interconnection study | Facility Study |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 59044) | Transmission | TX | 0.8 yrs | Not disclosed | Local/state review | — |
| Entergy Louisiana, LLC (LA PSC Docket U-37800) | Solar | LA | 0.8 yrs | Not disclosed | Local/state review | — |
| Interconnection Request 28INR0469 (Solar) | Solar | TX | 0.8 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0470 (Solar) | Solar | TX | 0.8 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0476 (Solar) | Solar | TX | 0.8 yrs | 276 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0221 (Solar) | Solar | TX | 0.8 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0220 (Solar) | Solar | TX | 0.8 yrs | 252 MW | Interconnection study | Facility Study |
| Interconnection Request G1087 (Solar+Battery) | Solar | WA | 0.8 yrs | 500 MW | Interconnection study | In Progress (unknown study) |
| CROOM ROAD SOLAR 1, LLC (MD PSC Case No. 9837) | Solar | MD | 0.8 yrs | 3 MW | Local/state review | — |
| EL PASO ELECTRIC COMPANY (TX PUCT Docket 59076) | Gas | TX | 0.7 yrs | 366 MW | Local/state review | — |
| Duke Energy Florida Interconnection Request FC100382 (Gas) | Gas | FL | 0.7 yrs | 265 MW | Interconnection study | In Progress (unknown study) |
| Saddle Butte Energy Facility (OR EFSC) | Wind (onshore) | OR | 0.7 yrs | 488 MW | Local/state review | — |
| TPE MD CE59, LLC (MD PSC Case No. 9838) | Solar | MD | 0.7 yrs | 3 MW | Local/state review | — |
| LSE CIRCE, LLC (MD PSC Case No. 9839) | Solar | MD | 0.7 yrs | 2.85 MW | Local/state review | — |
| GREEN ROAD MD PV LLC (MD PSC Case No. 9840) | Solar | MD | 0.7 yrs | 2.75 MW | Local/state review | — |
| Duke Energy Florida Interconnection Request FC100386 (Gas) | Gas | FL | 0.7 yrs | 265 MW | Interconnection study | In Progress (unknown study) |
| Interconnection Request 30INR0073 (Gas) | Gas | TX | 0.7 yrs | 311 MW | Interconnection study | Facility Study |
| ALLEGANY PV LLC (MD PSC Case No. 9842) | Solar | MD | 0.7 yrs | 5 MW | Local/state review | — |
| BENSON ROAD SOLAR 1, LLC (MD PSC Case No. 9843) | Solar | MD | 0.7 yrs | 3 MW | Local/state review | — |
| Interconnection Request 28INR0390 (Battery) | Storage | TX | 0.7 yrs | 258 MW | Interconnection study | Facility Study |
| Interconnection Request 28INR0478 (Wind) | Wind (onshore) | TX | 0.7 yrs | 250 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0204 (Solar+Battery) | Solar | TX | 0.7 yrs | 548 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0203 (Solar+Battery) | Solar | TX | 0.7 yrs | 532 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0196 (Solar) | Solar | TX | 0.7 yrs | 405 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0218 (Battery) | Storage | TX | 0.7 yrs | 1,026 MW | Interconnection study | Facility Study |
| Lewes DEA, LLC (DE PSC Docket 25-1570) | Solar | DE | 0.7 yrs | Not disclosed | Local/state review | — |
| American Transmission Company LLC (WI PSC Docket 137-CE-223) | Transmission | WI | 0.7 yrs | Not disclosed | Local/state review | — |
| SIMPERS ROAD, LLC (MD PSC Case No. 9844) | Solar | MD | 0.7 yrs | 3.875 MW | Local/state review | — |
| Interconnection Request APP-100259 (Solar+Battery) | Solar | LA | 0.7 yrs | 508 MW | Interconnection study | In Progress (unknown study) |
| Hoosier Energy Interconnection Request APP-100245 (Solar+Battery) | Solar | IN | 0.7 yrs | 405 MW | Interconnection study | In Progress (unknown study) |
| Evergy Missouri West, Inc., d/b/a/ Evergy Missouri West (MO PSC Case EA-2026-0155) | Gas | MO | 0.7 yrs | Not disclosed | Local/state review | — |
| Evergy Metro, Inc., d/b/a Evergy Missouri Metro (MO PSC Case EA-2026-0154) | Gas | MO | 0.7 yrs | Not disclosed | Local/state review | — |
| PacifiCorp Interconnection Request PIS107 (Battery) | Storage | OR | 0.7 yrs | 416 MW | Interconnection study | In Progress (unknown study) |
| Hoosier Energy Interconnection Request APP-100248 (Solar+Battery) | Solar | IN | 0.7 yrs | 280 MW | Interconnection study | In Progress (unknown study) |
| Klamath Falls Energy Center (OR EFSC) | Solar | OR | 0.7 yrs | 400 MW | Local/state review | — |
| Interconnection Request 28INR0486 (Solar) | Solar | TX | 0.7 yrs | 1,200 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0198 (Solar) | Solar | TX | 0.7 yrs | 509 MW | Interconnection study | Facility Study |
| Interconnection Request 29INR0225 (Solar) | Solar | TX | 0.7 yrs | 306 MW | Interconnection study | Facility Study |
| SHADDING REACH ROAD, LLC (MD PSC Case No. 9846) | Solar | MD | 0.7 yrs | 4.5 MW | Local/state review | — |
| TPE MD CE166, LLC (MD PSC Case No. 9845) | Solar | MD | 0.7 yrs | 4.99 MW | Local/state review | — |
| Entergy Louisiana, LLC (LA PSC Docket U-37812) | Transmission | LA | 0.7 yrs | Not disclosed | Local/state review | — |
| CHABERTON SOLAR PETERS HOLDING LLC (MD PSC Case No. 9847) | Solar | MD | 0.7 yrs | 10 MW | Local/state review | — |
| Oklahoma Gas and Electric Company (AR PSC Docket 25-070-U) | Storage | OK | 0.7 yrs | Not disclosed | Local/state review | — |
| NORTH TELEGRAPH ROAD SOLAR 1, LLC (MD PSC Case No. 9851) | Solar | MD | 0.7 yrs | 5 MW | Local/state review | — |
| Minnesota Power (ND PSC PU-25-304) | Wind (onshore) | ND | 0.7 yrs | 203 MW | Local/state review | — |
| Minnesota Power (ND PSC PU-25-305) | Wind (onshore) | ND | 0.7 yrs | 230 kV | Local/state review | — |
| East Kentucky Power Cooperative, Inc. (KY PSC Case 2026-00235) | Transmission | KY | 0.7 yrs | Not disclosed | Local/state review | — |
| Kentucky Power Company (KY PSC Case 2026-00184) | Transmission | KY | 0.7 yrs | Not disclosed | Local/state review | — |
| Kentucky Power Company (KY PSC Case 2026-00103) | Other | KY | 0.7 yrs | Not disclosed | Local/state review | — |
| MYSO, LLC (KY PSC Case 2026-00229) | Transmission | KY | 0.7 yrs | Not disclosed | Local/state review | — |
| Kentucky Utilities Company (KY PSC Case 2026-00247) | Transmission | KY | 0.7 yrs | Not disclosed | Local/state review | — |
| South Fork Solar, LLC (KY PSC Case 2026-00256) | Solar | KY | 0.7 yrs | 45 MW | Local/state review | — |
| Vaca Dixon Power Center Project | Storage | CA | 0.7 yrs | 157 MW | Local/state review | — |
| WIND ENERGY TRANSMISSION TEXAS, LLC (TX PUCT Docket 59183) | Solar | TX | 0.7 yrs | Not disclosed | Local/state review | — |
| Azalea Wind LLC (NY DPS Case 26-00025) | Wind (onshore) | NY | 0.7 yrs | 100 MW | Local/state review | — |
| Deschutes Solar and Battery Energy Storage System Facility (OR EFSC) | Solar | OR | 0.7 yrs | 1,000 MW | Local/state review | — |
| LSE AURORA LLC (MD PSC Case No. 9852) | Solar | MD | 0.6 yrs | 5 MW | Local/state review | — |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2026-0183) | Other | MO | 0.6 yrs | Not disclosed | Local/state review | — |
| Buttercup Wind LLC (NY DPS Case 26-00101) | Wind (onshore) | NY | 0.6 yrs | 100 MW | Local/state review | — |
| Dewdrop Wind LLC (NY DPS Case 26-00100) | Wind (onshore) | NY | 0.6 yrs | 62 MW | Local/state review | — |
| Goldenrod Wind LLC (NY DPS Case 26-00099) | Wind (onshore) | NY | 0.6 yrs | 39 MW | Local/state review | — |
| HALO JM LLC (MD PSC Case No. 9853) | Solar | MD | 0.6 yrs | 5 MW | Local/state review | — |
| Dupont Highway Solar 1 LLC (DE PSC Docket 26-0071) | Solar | DE | 0.6 yrs | Not disclosed | Local/state review | — |
| Kearsarge New Castle East LLC (DE PSC Docket 26-0120) | Solar | DE | 0.6 yrs | Not disclosed | Local/state review | — |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 59282) | Transmission | TX | 0.6 yrs | Not disclosed | Local/state review | — |
| OLD ISLAND SOLAR LLC (MD PSC Case No. 9854) | Solar | MD | 0.6 yrs | 3.9 MW | Local/state review | — |
| Wisconsin Power and Light Company (WI PSC Docket 6680-CE-191) | Storage | WI | 0.6 yrs | Not disclosed | Local/state review | — |
| August Community Solar, LLC — Augusta Community Solar Project (ME DEP L-100497) | Solar | ME | 0.6 yrs | Not disclosed | Local/state review | — |
| Entergy Arkansas, LLC (AR PSC Docket 26-002-U) | Transmission | AR | 0.6 yrs | Not disclosed | Local/state review | — |
| ENTERGY TEXAS, INC. (TX PUCT Docket 59292) | Transmission | TX | 0.6 yrs | Not disclosed | Local/state review | — |
| PUC CENTRAL RECORDS (TX PUCT Docket 59297) | Other | TX | 0.6 yrs | Not disclosed | Local/state review | — |
| WIND ENERGY TRANSMISSION TEXAS, LLC (TX PUCT Docket 59199) | Solar | TX | 0.6 yrs | Not disclosed | Local/state review | — |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 59302) | Transmission | TX | 0.6 yrs | Not disclosed | Local/state review | — |
| OPOSSUMTOWN PIKE SOLAR 1, LLC (MD PSC Case No. 9855) | Solar | MD | 0.6 yrs | 5 MW | Local/state review | — |
| NEXTERA ENERGY TRANSMISSION MIDATLANTIC, INC. (MD PSC Case No. 9857) | Transmission | MD | 0.6 yrs | Not disclosed | Local/state review | — |
| LSE INO LLC (MD PSC Case No. 9856) | Solar | MD | 0.6 yrs | 5 MW | Local/state review | — |
| NextEra Energy Transmission MidAtlantic, Inc. (WV PSC Case 26-0075-E-CN) | Transmission | WV | 0.6 yrs | Not disclosed | Local/state review | — |
| APPLICATION OF QUONSET DEVELOPMENT CORPORATION AND GDQ ESS, LLC FOR A LICENSE TO (RI EFSB SB-2026-02) | Storage | RI | 0.6 yrs | 208 MW | Local/state review | — |
| Perennial Stelladoro Solar LLC — Perennial Stelladoro Solar LLC (ME DEP L-100488) | Solar | ME | 0.6 yrs | Not disclosed | Local/state review | — |
| Laurel Creek Energy Storage, (VA SCC PUR-2026-00001) | Storage | VA | 0.6 yrs | Not disclosed | Local/state review | — |
| Novus 242 Solar LLC (VT 26-0261-PET) | Solar | VT | 0.6 yrs | 3.75 MW | Local/state review | — |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 59307) | Transmission | TX | 0.6 yrs | Not disclosed | Local/state review | — |
| Monongahela Power Company and The Potomac Edison Company (WV PSC Case 26-0108-E-CN) | Gas | WV | 0.6 yrs | 1,200 MW | Local/state review | — |
| BITTINGER SOLAR PARTNERS, LLC (MD PSC Case No. 9859) | Solar | MD | 0.6 yrs | 5 MW | Local/state review | — |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 59315) | Transmission | TX | 0.5 yrs | Not disclosed | Local/state review | — |
| ONEENERGY DEVELOPMENT, LLC (MD PSC Case No. 9860) | Solar | MD | 0.5 yrs | 5 MW | Local/state review | — |
| Brookfield Husky Solar, LLC d/b/a Verogy (CT CSC Docket No. 550) | Solar | CT | 0.5 yrs | 50 MW | Local/state review | — |
| The Narragansett Electric Company's (TNEC) Notice of Intent Application 115 kV T (RI EFSB SB-2026-01) | Transmission | RI | 0.5 yrs | Not disclosed | Local/state review | — |
| North Plains Connector LLC (ND PSC PU-26-082) | Transmission | ND | 0.5 yrs | Not disclosed | Local/state review | — |
| The Potomac Edison Company (WV PSC Case 26-0135-E-CN-PW) | Transmission | WV | 0.5 yrs | Not disclosed | Local/state review | — |
| Entergy Louisiana, LLC (LA PSC Docket U-37853) | Other | LA | 0.5 yrs | Not disclosed | Local/state review | — |
| Kent Walnut Shade 1, LLC (DE PSC Docket 26-0300) | Solar | DE | 0.5 yrs | Not disclosed | Local/state review | — |
| ENTERGY TEXAS, INC. (TX PUCT Docket 59430) | Other | TX | 0.5 yrs | Not disclosed | Local/state review | — |
| South Coshocton-Wooster 138 kV Transmission Line Rebuild (West Millersburg-Wooster) (OH OPSB Case 26-0128-EL-BTX) | Transmission | OH | 0.5 yrs | Not disclosed | Planned, approvals not yet initiated | — |
| Commonwealth Edison Company (IL ICC Docket 26-0156) | Transmission | IL | 0.5 yrs | Not disclosed | Local/state review | — |
| PUBLIC SERVICE COMPANY OF NEW MEXICO (NM PRC Docket 26-0000041) | Transmission | NM | 0.5 yrs | Not disclosed | Local/state review | — |
| Cascade Renewable Transmission System (OR EFSC) | Transmission | OR | 0.5 yrs | 320 kV | Local/state review | — |
| LSE IRIS LLC, LSE IRIS II LLC, AND LSE IRIS III LLC (MD PSC Case No. 9861) | Solar | MD | 0.5 yrs | 15 MW | Local/state review | — |
| BRETHREN CHURCH ROAD SOLAR 2, LLC (MD PSC Case No. 9862) | Solar | MD | 0.5 yrs | 5 MW | Local/state review | — |
| Silver King Solar LLC (AZ ACC Docket L-21390A-26-0045-00260) | Solar | AZ | 0.5 yrs | Not disclosed | Local/state review | — |
| Fairfield Energy Center (OH OPSB Case 26-0160-EL-BGN) | Gas | OH | 0.5 yrs | Not disclosed | Local/state review | — |
| ONEENERGY DEVELOPMENT, LLC (MD PSC Case No. 9863) | Solar | MD | 0.5 yrs | 4 MW | Local/state review | — |
| Homestead Wind, LLC (ND PSC PU-26-086) | Wind (onshore) | ND | 0.5 yrs | Not disclosed | Local/state review | — |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2026-0226) | Gas | MO | 0.5 yrs | Not disclosed | Local/state review | — |
| TPE MD CE132A, LLC AND TPE MD CE132B, LLC (MD PSC Case No. 9864) | Solar | MD | 0.5 yrs | 4.99 MW | Local/state review | — |
| Beatty Road-Canal Street 138 kV Transmission Line Rebuild (OH OPSB Case 26-0073-EL-BTX) | Transmission | OH | 0.5 yrs | Not disclosed | Planned, approvals not yet initiated | — |
| Ashville Energy Center (OH OPSB Case 26-196-EL-BGN) | Gas | OH | 0.5 yrs | Not disclosed | Local/state review | — |
| IDAHO POWER COMPANY (Idaho PUC Case IPC-E-26-04) | Other | ID | 0.5 yrs | Not disclosed | Local/state review | — |
| SAM HOUSTON ELECTRIC COOPERATIVE, INC (TX PUCT Docket 59126) | Transmission | TX | 0.5 yrs | Not disclosed | Local/state review | — |
| LSE OCTANS LLC (MD PSC Case No. 9867) | Solar | MD | 0.5 yrs | 5 MW | Local/state review | — |
| Chaberton Energy Holdings Inc. (DE PSC Docket 26-0360) | Solar | DE | 0.5 yrs | Not disclosed | Local/state review | — |
| Chaberton Energy Holdings Inc. (DE PSC Docket 26-0361) | Solar | DE | 0.5 yrs | Not disclosed | Local/state review | — |
| Brusselville Solar, LLC (NY DPS Case 26-00534) | Solar | NY | 0.5 yrs | 170 MW | Local/state review | — |
| WPD USA Inc (NY DPS Case 26-00550) | Wind (onshore) | NY | 0.5 yrs | Not disclosed | Local/state review | — |
| Savage Solar Energy LLC (VT 26-0540-PET) | Solar | VT | 0.5 yrs | 2.75 MW | Local/state review | — |
| NORRISVILLE ROAD MD PV LLC (MD PSC Case No. 9869) | Solar | MD | 0.5 yrs | 3.5 MW | Local/state review | — |
| TPE MD QA15A, LLC, TPE MD QA15B, LLC, AND TPE MD QA15C, LLC (MD PSC Case No. 9868) | Solar | MD | 0.5 yrs | 9.98 MW | Local/state review | — |
| Entergy Louisiana, LLC (LA PSC Docket U-37882) | Other | LA | 0.5 yrs | Not disclosed | Local/state review | — |
| SOUTH TEXAS ELECTRIC COOPERATIVE, INC. (TX PUCT Docket 59526) | Transmission | TX | 0.4 yrs | Not disclosed | Local/state review | — |
| EL PASO ELECTRIC COMPANY (TX PUCT Docket 59585) | Storage | TX | 0.4 yrs | 150 MW | Local/state review | — |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2026-0253) | Transmission | MO | 0.4 yrs | Not disclosed | Local/state review | — |
| PACIFICORP DBA ROCKY MOUNTAIN POWER (Idaho PUC Case PAC-E-26-06) | Transmission | ID | 0.4 yrs | Not disclosed | Local/state review | — |
| IDAHO POWER COMPANY (Idaho PUC Case IPC-E-26-09) | Transmission | ID | 0.4 yrs | Not disclosed | Local/state review | — |
| CITY PUBLIC SERVICE BOARD (CPS ENERGY) (TX PUCT Docket 59549) | Transmission | TX | 0.4 yrs | Not disclosed | Local/state review | — |
| CPV Walker Energy Center (OH OPSB Case 26-0353-EL-BGN) | Gas | OH | 0.4 yrs | Not disclosed | Planned, approvals not yet initiated | — |
| Green Mountain Power Corporation (VT 26-0651-PET) | Transmission | VT | 0.4 yrs | Not disclosed | Local/state review | — |
| Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy (NV PUCN Docket 26-04011) | Transmission | NV | 0.4 yrs | Not disclosed | Local/state review | — |
| PowerConneX New Albany 3 Energy Center (OH OPSB Case 26-361-EL-BGN) | Gas | OH | 0.4 yrs | Not disclosed | Local/state review | — |
| Indiana Michigan Power Company (IN IURC Cause No. 46389) | Other | IN | 0.4 yrs | 918 MW | Local/state review | — |
| ELK DEVELOPMENT, LLC (MD PSC Case No. 9872) | Solar | MD | 0.4 yrs | 4 MW | Local/state review | — |
| Baku-Gavin 765 kV Transmission Line (OH OPSB Case 26-0426-EL-BTX) | Transmission | OH | 0.4 yrs | Not disclosed | Local/state review | — |
| Barr Energy Center (OH OPSB Case 26-0498-EL-BGN) | Storage | OH | 0.4 yrs | Not disclosed | Planned, approvals not yet initiated | — |
| American Transmission Company LLC (WI PSC Docket 137-CE-228) | Transmission | WI | 0.4 yrs | Not disclosed | Local/state review | — |
| Airport RD1 VT Solar, LLC (VT 26-0736-PET) | Solar | VT | 0.4 yrs | 4.975 MW | Local/state review | — |
| PR RNO Property Owner 1, LLC (NV PUCN Docket 26-04027) | Gas | NV | 0.4 yrs | 218 MW | Local/state review | — |
| SV RNO Property Owner 1 LLC (NV PUCN Docket 26-04026) | Gas | NV | 0.4 yrs | 144 MW | Local/state review | — |
| CHROME HILL SOLAR, LLC (MD PSC Case No. 9874) | Solar | MD | 0.4 yrs | 5 MW | Local/state review | — |
| MONTROSE FARM SOLAR 1 LLC (MD PSC Case No. 9875) | Solar | MD | 0.4 yrs | 5 MW | Local/state review | — |
| CHAMBERLAIN EAST SOLAR FARM, LLC (NJ BPU Docket QW26040135) | Solar | NJ | 0.4 yrs | Not disclosed | Local/state review | — |
| KOBER SOLAR FARM, LLC (NJ BPU Docket QW26040133) | Solar | NJ | 0.4 yrs | Not disclosed | Local/state review | — |
| SOUTH BRANCH SOLAR PROJECT, LLC (NJ BPU Docket QW26040167) | Solar | NJ | 0.4 yrs | Not disclosed | Local/state review | — |
| PRICES LANE SOLAR FARM, LLC (NJ BPU Docket QW26040140) | Solar | NJ | 0.4 yrs | Not disclosed | Local/state review | — |
| OCEAN VIEW SOLAR FARM, LLC (NJ BPU Docket QW26040168) | Solar | NJ | 0.4 yrs | Not disclosed | Local/state review | — |
| EL PASO ELECTRIC COMPANY (TX PUCT Docket 59690) | Solar | TX | 0.4 yrs | Not disclosed | Local/state review | — |
| POTOMAC EDISON COMPANY (MD PSC Case No. 9876) | Transmission | MD | 0.4 yrs | Not disclosed | Local/state review | — |
| Basin Electric Power Cooperative (ND PSC PU-26-164) | Other | ND | 0.4 yrs | Not disclosed | Local/state review | — |
| HALO RISING SUN LLC (MD PSC Case No. 9877) | Solar | MD | 0.3 yrs | 4 MW | Local/state review | — |
| Novus Buck Solar LLC (VT 26-0925-PET) | Solar | VT | 0.3 yrs | 4.999 MW | Local/state review | — |
| SOUTHWESTERN PUBLIC SERVICE COMPANY (TX PUCT Docket 59739) | Transmission | TX | 0.3 yrs | Not disclosed | Local/state review | — |
| Seahawk Battery Energy Storage System (BESS) | Storage | CA | 0.3 yrs | 200 MW | Local/state review | — |
| Crowned Ridge Energy Storage I, LLC (SD PUC EL26-014) | Storage | SD | 0.3 yrs | Not disclosed | Local/state review | — |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 59675) | Transmission | TX | 0.3 yrs | Not disclosed | Local/state review | — |
| Muddy Creek Energy Park (OR EFSC) | Solar | OR | 0.3 yrs | 199 MW | Local/state review | — |
| Florida Power & Light Company (FPL) (FL Siting Case TA26-21) | Transmission | FL | 0.3 yrs | Not disclosed | Agency permitting | — |
| SCCS 2 LLC (MD PSC Case No. 9878) | Solar | MD | 0.3 yrs | 4.125 MW | Local/state review | — |
| Neo Power Generation Facility (OH OPSB Case 26-0627-EL-BGN) | Gas | OH | 0.3 yrs | Not disclosed | Local/state review | — |
| SOUTHWESTERN PUBLIC SERVICE COMPANY (TX PUCT Docket 59818) | Transmission | TX | 0.3 yrs | Not disclosed | Local/state review | — |
| LSE LUMEN LLC (MD PSC Case No. 9880) | Solar | MD | 0.3 yrs | 3 MW | Local/state review | — |
| USS Hillstrom Solar LLC — US Solar- Hillstrom Solar (ME DEP L-100639) | Solar | ME | 0.3 yrs | Not disclosed | Local/state review | — |
| Entergy Arkansas, LLC (AR PSC Docket 26-041-U) | Transmission | AR | 0.3 yrs | Not disclosed | Local/state review | — |
| PUBLIC SERVICE COMPANY OF NEW MEXICO (NM PRC Docket 26-0000114) | Storage | NM | 0.3 yrs | Not disclosed | Local/state review | — |
| BRAZOS ELECTRIC POWER COOPERATIVE, INC. (BRAZOS ELECTRIC) (TX PUCT Docket 59782) | Transmission | TX | 0.3 yrs | Not disclosed | Local/state review | — |
| In the Matter of the Evergy Metro, Inc. d/b/a/ Evergy Missouri Metro and Evergy (MO PSC Case EA-2026-0343) | Gas | MO | 0.3 yrs | Not disclosed | Local/state review | — |
| The Narragansett Electric Company d/b/a Rhode Island Energy CR12067: 332 West Fa (RI EFSB SB-2026-03) | Transmission | RI | 0.3 yrs | Not disclosed | Local/state review | — |
| Lux Solar Center, LLC (NV PUCN Docket 26-06001) | Solar | NV | 0.3 yrs | 125 MW | Local/state review | — |
| Greenskies Clean Energy LLC (CT CSC Petition No. 1711) | Solar | CT | 0.3 yrs | 4.99 MW | Local/state review | — |
| EL PASO ELECTRIC COMPANY (TX PUCT Docket 59836) | Other | TX | 0.3 yrs | Not disclosed | Local/state review | — |
| Butterfly Meadows Solar (OH OPSB Case 26-670-EL-BGN) | Solar | OH | 0.3 yrs | Not disclosed | Planned, approvals not yet initiated | — |
| JEA (FL Siting Case PA81-13A2) | Gas | FL | 0.3 yrs | 706 MW | Agency permitting | — |
| FENWICK CREEK SOLAR, LLC (NJ BPU Docket QO26060340) | Solar | NJ | 0.2 yrs | Not disclosed | Local/state review | — |
| SOUTHWESTERN PUBLIC SERVICE COMPANY (TX PUCT Docket 59862) | Other | TX | 0.2 yrs | Not disclosed | Local/state review | — |
| Allied Printing Services, Inc (CT CSC Petition No. 1712) | Storage | CT | 0.2 yrs | 3.4 MW | Local/state review | — |
| CROOM COMMUNITY ENERGY INITIATIVE LLC (MD PSC Case No. 9881) | Solar | MD | 0.2 yrs | 3.9 MW | Local/state review | — |
| Eagl, LLC (AZ ACC Docket L-21323A-26-0244-00263) | Other | AZ | 0.2 yrs | Not disclosed | Local/state review | — |
| Lynn Bark Energy Center, LLC (KY PSC Case 2026-00096) | Transmission | KY | 0.2 yrs | Not disclosed | Local/state review | — |
| EL PASO ELECTRIC COMPANY (TX PUCT Docket 59899) | Transmission | TX | 0.2 yrs | Not disclosed | Local/state review | — |
| Nexus Fulcrum LLC (NV PUCN Docket 26-06016) | Gas | NV | 0.2 yrs | 510 MW | Local/state review | — |
| BALTIMORE GAS AND ELECTRIC COMPANY (MD PSC Case No. 9882) | Transmission | MD | 0.2 yrs | Not disclosed | Local/state review | — |
| Robin Energy Storage LLC (WI PSC Docket 9842-CE-100) | Storage | WI | 0.2 yrs | 200 MW | Local/state review | — |
| POTOMAC ELECTRIC POWER COMPANY (MD PSC Case No. 9883) | Transmission | MD | 0.2 yrs | Not disclosed | Local/state review | — |
| AEP TEXAS INC. (TX PUCT Docket 59851) | Transmission | TX | 0.2 yrs | Not disclosed | Local/state review | — |
| Public Service Company (CO PUC Docket 26A-0243E) | Other | CO | 0.2 yrs | Not disclosed | Local/state review | — |
| Sussex Millsboro 1, LLC (DE PSC Docket 26-0672) | Solar | DE | 0.2 yrs | Not disclosed | Local/state review | — |
| Wild Stallion Energy Storage LLC (AZ ACC Docket L-21411A-26-0260-00264) | Storage | AZ | 0.2 yrs | Not disclosed | Local/state review | — |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 59894) | Transmission | TX | 0.2 yrs | Not disclosed | Local/state review | — |
| BALTIMORE GAS AND ELECTRIC COMPANY (MD PSC Case No. 9884) | Transmission | MD | 0.2 yrs | Not disclosed | Local/state review | — |
| BRAZOS ELECTRIC POWER COOPERATIVE, INC. (BRAZOS ELECTRIC) (TX PUCT Docket 59913) | Transmission | TX | 0.2 yrs | Not disclosed | Local/state review | — |
| Moraga Storage LLC (MA EFSB efsb26-01) | Storage | MA | 0.2 yrs | Not disclosed | Local/state review | — |
| SYNCARPHA THURMONT, LLC (MD PSC Case No. 9885) | Solar | MD | 0.2 yrs | 5 MW | Local/state review | — |
| MASON BRANCH SOLAR 1 LLC (MD PSC Case No. 9886) | Solar | MD | 0.2 yrs | 5 MW | Local/state review | — |
| OTTERDALE MILL ROAD MD PV LLC (MD PSC Case No. 9887) | Solar | MD | 0.2 yrs | 3 MW | Local/state review | — |
| MCMULLEN SOUTH WEST HIGHWAY SOLAR 1, LLC (MD PSC Case No. 9889) | Solar | MD | 0.2 yrs | 5 MW | Local/state review | — |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2027-0009) | Transmission | MO | 0.2 yrs | Not disclosed | Local/state review | — |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2027-0010) | Transmission | MO | 0.2 yrs | Not disclosed | Local/state review | — |
| Union Electric Company d/b/a Ameren Missouri (MO PSC Case EA-2027-0008) | Transmission | MO | 0.2 yrs | Not disclosed | Local/state review | — |
| AVISTA UTILITIES, INC (Idaho PUC Case AVU-E-26-10) | Transmission | ID | 0.2 yrs | Not disclosed | Local/state review | — |
| Cleco Power LLC (LA PSC Docket U-38035) | Other | LA | 0.2 yrs | Not disclosed | Local/state review | — |
| EL PASO ELECTRIC COMPANY (NM PRC Docket 26-0000137) | Transmission | NM | 0.2 yrs | Not disclosed | Local/state review | — |
| Harmony Storage, LLC (ND PSC PU-26-284) | Other | ND | 0.2 yrs | Not disclosed | Local/state review | — |
| Southwestern Electric Power Company (LA PSC Docket U-38042) | Transmission | LA | 0.1 yrs | Not disclosed | Local/state review | — |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 59932) | Transmission | TX | 0.1 yrs | Not disclosed | Local/state review | — |
| Mariposa Energy Park, LLC (AZ ACC Docket L-21418A-26-0282-00265) | Other | AZ | 0.1 yrs | Not disclosed | Local/state review | — |
| Indiana Michigan Power Company (IN IURC Cause No. 46443) | Gas | IN | 0.1 yrs | 1,520 MW | Local/state review | — |
| DEL012 30423A Thorogoods Rd, LLC (DE PSC Docket 26-0741) | Solar | DE | 0.1 yrs | Not disclosed | Local/state review | — |
| Greenskies Clean Energy LLC (CT CSC Petition No. 1714) | Solar | CT | 0.1 yrs | 3 MW | Local/state review | — |
| Manchester Renewables, LLC — Manchester Solar PV Project (ME DEP L-100682) | Solar | ME | 0.1 yrs | Not disclosed | Local/state review | — |
| Townsend Community Energy Initiative LLC (DE PSC Docket 26-0738) | Solar | DE | 0.1 yrs | Not disclosed | Local/state review | — |
| COURT HOUSE POINT ROAD MD PV LLC (MD PSC Case No. 9891) | Solar | MD | 0.1 yrs | 2.5 MW | Local/state review | — |
| Kent Briarbush 1, LLC (DE PSC Docket 26-0757) | Solar | DE | 0.1 yrs | Not disclosed | Local/state review | — |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 60008) | Transmission | TX | 0.1 yrs | Not disclosed | Local/state review | — |
| EL PASO ELECTRIC COMPANY (TX PUCT Docket 60016) | Transmission | TX | 0.1 yrs | Not disclosed | Local/state review | — |
| CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC (TX PUCT Docket 60061) | Other | TX | 0.1 yrs | Not disclosed | Local/state review | — |
| PORTS Energy Center (OH OPSB Case 26-0746-EL-BGN) | Gas | OH | 0.1 yrs | Not disclosed | Local/state review | — |
| Manchester Renewables, LLC — Manchester Solar PV Project (ME DEP L-100683) | Solar | ME | 0.1 yrs | Not disclosed | Local/state review | — |
| Microsoft Corporation (NV PUCN Docket 26-07016) | Transmission | NV | 0.1 yrs | Not disclosed | Local/state review | — |
| Kentucky Power Company (KY PSC Case 2026-00208) | Transmission | KY | 0.1 yrs | Not disclosed | Local/state review | — |
| ARENA HART SOLAR, LLC (MD PSC Case No. 9893) | Solar | MD | 0.1 yrs | 4 MW | Local/state review | — |
| Montana-Dakota Utilities Co. (ND PSC PU-26-293) | Transmission | ND | 0.1 yrs | 345 kV | Local/state review | — |
| Big River Energy Facility (OR EFSC) | Wind (onshore) | OR | 0.1 yrs | 1,000 MW | Local/state review | — |
| REMD DAM NUMBER 5 CS, L.L.C. (MD PSC Case No. 9895) | Solar | MD | 0.1 yrs | 5 MW | Local/state review | — |
| BPP MD FRUITLAND PV I, LLC (MD PSC Case No. 9894) | Solar | MD | 0.1 yrs | 4 MW | Local/state review | — |
| LSE ALICE LLC (MD PSC Case No. 9896) | Solar | MD | 0.1 yrs | 3.15 MW | Local/state review | — |
| Hebron Solar One, LLC (CT CSC Petition No. 1716) | Solar | CT | 0.1 yrs | 3 MW | Local/state review | — |
| Southwestern Electric Power Company (AR PSC Docket 26-056-U) | Storage | TX | 0.1 yrs | 200 MW | Local/state review | — |
| TRITEC Americas, LLC (CT CSC Petition No. 1717) | Solar | CT | 0.1 yrs | 3.92 MW | Local/state review | — |
| SMART Technology Systems, LLC (CT CSC Petition No. 1719) | Other | CT | 0.1 yrs | 45 MW | Local/state review | — |
| Greenskies Clean Energy, LLC (CT CSC Petition No. 1718) | Solar | CT | 0.1 yrs | 3.75 MW | Local/state review | — |
| ONCOR ELECTRIC DELIVERY COMPANY LLC (TX PUCT Docket 59980) | Transmission | TX | 0.1 yrs | Not disclosed | Local/state review | — |
| SOUTHWESTERN PUBLIC SERVICE COMPANY (TX PUCT Docket 60112) | Other | TX | 0.1 yrs | Not disclosed | Local/state review | — |
| Dakota Gasification Company (ND PSC PU-26-296) | Gas | ND | 0.1 yrs | Not disclosed | Local/state review | — |
| Salt River Project Agricultural Improvement and Power District (AZ ACC Docket L-00000B-26-0363-00267) | Transmission | AZ | 0.1 yrs | Not disclosed | Local/state review | — |
| PSE RENN MD SOLAR LLC (MD PSC Case No. 9897) | Solar | MD | 0.1 yrs | 4.998 MW | Local/state review | — |
| Hanging Rock-Baku 765 kV Transmission Line (OH OPSB Case 26-0870-EL-BTX) | Transmission | OH | 0.1 yrs | Not disclosed | Planned, approvals not yet initiated | — |
| ENTERGY TEXAS, INC. (TX PUCT Docket 60130) | Transmission | TX | 0.1 yrs | Not disclosed | Local/state review | — |
| Salt River Project Agricultural Improvement and Power District (AZ ACC Docket L-00000B-26-0375-00268) | Gas | AZ | 0.1 yrs | Not disclosed | Local/state review | — |
| SUNXIII LLC (MD PSC Case No. 9898) | Solar | MD | 0.1 yrs | 5 MW | Local/state review | — |
| SUNXIII LLC (MD PSC Case No. 9900) | Solar | MD | 0.1 yrs | 5 MW | Local/state review | — |
| TPE MD W157A, LLC AND TPE MD W157B, LLC (MD PSC Case No. 9899) | Solar | MD | 0.1 yrs | 9.98 MW | Local/state review | — |
| Green Mountain Power Corporation (VT 26-1696-PET) | Transmission | VT | 0.1 yrs | Not disclosed | Local/state review | — |
| Pivot Energy DEL055 LLC (DE PSC Docket 26-0829) | Solar | DE | 0.1 yrs | Not disclosed | Local/state review | — |
| Pivot Energy DEL045 LLC (DE PSC Docket 26-0828) | Solar | DE | 0.1 yrs | Not disclosed | Local/state review | — |
| STMO Bn, LLC (Starfire) (KY PSC Case 2026-00180) | Solar | KY | 0.0 yrs | 200 MW | Local/state review | — |
| DORCHESTER HORNS POINT SOLAR 1, LLC (MD PSC Case No. 9901) | Solar | MD | 0.0 yrs | 5 MW | Local/state review | — |
| Grid Growth West Thistlewood-Beatty 345 kV Transmission Line Project (OH OPSB Case 26-0811-EL-BTX) | Transmission | OH | 0.0 yrs | Not disclosed | Planned, approvals not yet initiated | — |
| Grid Growth West Greentown-Thistlewood 765 kV Transmission Line Project (OH OPSB Case 26-0809-EL-BTX) | Transmission | OH | 0.0 yrs | Not disclosed | Planned, approvals not yet initiated | — |
| Grid Growth East Adkins-West Millersport 765 kV Transmission Line Project (OH OPSB Case 26-0813-EL-BTX) | Transmission | OH | 0.0 yrs | Not disclosed | Planned, approvals not yet initiated | — |
| Grid Growth East Conesville-Guernsey 765 kV Transmission Line Project (OH OPSB Case 26-0812-EL-BTX) | Transmission | OH | 0.0 yrs | Not disclosed | Planned, approvals not yet initiated | — |
| Grid Growth West Thistlewood-Marysville 765 kV Transmission Line Project (OH OPSB Case 26-0810-EL-BTX) | Transmission | OH | 0.0 yrs | Not disclosed | Planned, approvals not yet initiated | — |
| Dakota Gasification Company (ND PSC PU-26-304) | Gas | ND | 0.0 yrs | Not disclosed | Local/state review | — |
| GUDE LANDFILL SOLAR 1, LLC (MD PSC Case No. 9902) | Solar | MD | 0.0 yrs | 5 MW | Local/state review | — |
| OLD VIRGINIA ROAD LLC (MD PSC Case No. 9903) | Solar | MD | 0.0 yrs | Not disclosed | Local/state review | — |
| TREX US Red Holly (Unit 701) | Solar | TX | — | 250 MW | Regulatory approvals pending | — |
| Singer Solar (Unit 4519) | Solar | LA | — | 300 MW | Planned, approvals not yet initiated | — |
| Iron Belt (Unit 1) | Storage | TX | — | 400 MW | Planned, approvals not yet initiated | — |
| Snowflake A Solar and BESS (Unit SNFA) | Solar | AZ | — | 475 MW | Regulatory approvals pending | — |
| Snowflake A Solar and BESS (Unit SNFBA) | Storage | AZ | — | 475 MW | Regulatory approvals pending | — |
| Hanson (Unit HANSO) | Solar | TX | — | 396 MW | Regulatory approvals pending | — |
| Elisabeth Solar (Unit ELISA) | Solar | AZ | — | 350 MW | Regulatory approvals pending | — |
| Clairemont Solar (Unit CLAPV) | Solar | TX | — | 250 MW | Planned, approvals not yet initiated | — |
| La Salle ESS (Unit LSBS1) | Storage | TX | — | 500 MW | Planned, approvals not yet initiated | — |
| La Salle Solar (Unit LSPV1) | Solar | TX | — | 500 MW | Planned, approvals not yet initiated | — |
| Lazy U ESS 1 (Unit LUBA1) | Storage | TX | — | 250 MW | Planned, approvals not yet initiated | — |
| Hollow Branch Creek (Unit HB2PV) | Solar | TX | — | 460 MW | Regulatory approvals pending | — |
| Grace Energy Center (Unit GRA1) | Solar | CA | — | 500 MW | Regulatory approvals pending | — |
| Patoka Solar (Unit 11101) | Solar | IN | — | 250 MW | Planned, approvals not yet initiated | — |
| Prairie Oak Solar (Unit 11102) | Solar | IL | — | 250 MW | Planned, approvals not yet initiated | — |
| Starfire Mountain Solar (Unit STMO) | Solar | KY | — | 410 MW | Regulatory approvals pending | — |
| Energizar BESS (Unit BESS1) | Storage | MA | — | 250 MW | Regulatory approvals pending | — |
| Project Matador Gas Plant (PMG) (Unit F1G01) | Gas | TX | — | 260 MW | Planned, approvals not yet initiated | — |
| Project Matador Gas Plant (PMG) (Unit F1G02) | Gas | TX | — | 260 MW | Planned, approvals not yet initiated | — |
| Project Matador Gas Plant (PMG) (Unit F1G03) | Gas | TX | — | 260 MW | Planned, approvals not yet initiated | — |
| Project Matador Gas Plant (PMG) (Unit F2G01) | Gas | TX | — | 260 MW | Planned, approvals not yet initiated | — |
| Project Matador Gas Plant (PMG) (Unit F2G02) | Gas | TX | — | 260 MW | Planned, approvals not yet initiated | — |
| Project Matador Gas Plant (PMG) (Unit F2G03) | Gas | TX | — | 260 MW | Planned, approvals not yet initiated | — |
| Pinopolis BESS (Unit 1) | Storage | SC | — | 300 MW | Planned, approvals not yet initiated | — |
| Red Hollow Renewable Energy (Unit RDHLW) | Solar | TX | — | 300 MW | Planned, approvals not yet initiated | — |
| Red Hollow Renewable Energy (Unit RHLWB) | Storage | TX | — | 300 MW | Planned, approvals not yet initiated | — |
| Rock N' Roll (Unit RRB) | Storage | TX | — | 250 MW | Regulatory approvals pending | — |
| Grace Energy Center (Unit GRA2) | Storage | CA | — | 500 MW | Regulatory approvals pending | — |
| Rock House Solar (Unit ROCKH) | Solar | GA | — | 250 MW | Planned, approvals not yet initiated | — |
| Yates (Unit 10) | Gas | GA | — | 483 MW | Planned, approvals not yet initiated | — |
| Yates (Unit 9) | Gas | GA | — | 483 MW | Planned, approvals not yet initiated | — |
| Kingston (Unit CTG1) | Gas | TN | — | 455 MW | Planned, approvals not yet initiated | — |
| Kingston (Unit STG1) | Gas | TN | — | 323 MW | Planned, approvals not yet initiated | — |
| Nolin Hills (Unit GEN) | Wind (onshore) | OR | — | 300 MW | Planned, approvals not yet initiated | — |
| Nolin Hills (Unit GEN2) | Solar | OR | — | 300 MW | Planned, approvals not yet initiated | — |
| Rough Hat (Unit RH1) | Solar | NV | — | 400 MW | Regulatory approvals pending | — |
| South Ripley Solar (Unit CSRS1) | Solar | NY | — | 270 MW | Regulatory approvals pending | — |
| Elio Energy LLC (Unit ELIBS) | Storage | TX | — | 300 MW | Planned, approvals not yet initiated | — |
| OCI SunRoper (Unit OCIRO) | Solar | TX | — | 260 MW | Regulatory approvals pending | — |
| Uvalde Solar 2 (Unit UVPV2) | Solar | TX | — | 300 MW | Planned, approvals not yet initiated | — |
| Hecate Grid East Valley Storage (Unit RMSY) | Storage | TX | — | 255 MW | Planned, approvals not yet initiated | — |
| Hecate Energy Ramsey Storage (Unit RMSY) | Storage | TX | — | 500 MW | Planned, approvals not yet initiated | — |
| Utah Solar 1 (Unit 1EUS) | Solar | UT | — | 300 MW | Planned, approvals not yet initiated | — |
| Briggs Solar, LLC (Unit BRIGG) | Solar | TX | — | 305 MW | Regulatory approvals pending | — |
| Elevate Middletown (Unit ELVMT) | Storage | CT | — | 275 MW | Planned, approvals not yet initiated | — |
| Lycan Solar Project (Unit LYCAN) | Solar | CA | — | 400 MW | Regulatory approvals pending | — |
| Bonanza Solar and Storage Project (Unit BZPV) | Solar | NV | — | 300 MW | Regulatory approvals pending | — |
| Firefly Solar PA (Unit FFLPA) | Solar | PA | — | 402 MW | Regulatory approvals pending | — |
| Sunrose Renewable Energy (Unit SNRSE) | Solar | TX | — | 300 MW | Planned, approvals not yet initiated | — |
| Sunrose Renewable Energy (Unit SRSEB) | Storage | TX | — | 300 MW | Planned, approvals not yet initiated | — |
| Red Butte Solar and Storage (Unit REBU) | Solar | UT | — | 300 MW | Regulatory approvals pending | — |
| Red Butte Solar and Storage (Unit REBU2) | Storage | UT | — | 300 MW | Regulatory approvals pending | — |
| CO Bar Solar and BESS (Unit CBBA) | Storage | AZ | — | 400 MW | Planned, approvals not yet initiated | — |
| CO Bar Solar and BESS (Unit CBPV) | Solar | AZ | — | 400 MW | Planned, approvals not yet initiated | — |
| High Spring Solar Energy (Unit HSS) | Solar | OK | — | 400 MW | Planned, approvals not yet initiated | — |
| Selenite Springs Solar (Unit SSPV) | Solar | TX | — | 250 MW | Regulatory approvals pending | — |
| Roadhouse Energy Center (Unit RDHS) | Storage | CA | — | 300 MW | Regulatory approvals pending | — |
| Rocky Run Solar (Unit ROCKY) | Solar | VA | — | 300 MW | Planned, approvals not yet initiated | — |
| IP Meitner Wind (Unit MEITW) | Wind (onshore) | TX | — | 500 MW | Regulatory approvals pending | — |
| Changing Winds (Unit CHAN1) | Wind (onshore) | TX | — | 288 MW | Regulatory approvals pending | — |
| Ash Creek BESS (Unit BESS) | Storage | TX | — | 306 MW | Planned, approvals not yet initiated | — |
| Mystic Springs Renewable Energy (Hybrid) (Unit MYSPB) | Storage | TX | — | 250 MW | Planned, approvals not yet initiated | — |
| Mystic Springs Renewable Energy (Hybrid) (Unit MYSPS) | Solar | TX | — | 250 MW | Planned, approvals not yet initiated | — |
| Cowboy Solar I (Unit CLP20) | Solar | WY | — | 400 MW | Planned, approvals not yet initiated | — |
| Short Creek Solar (Unit SHRT) | Solar | TX | — | 606 MW | Regulatory approvals pending | — |
| Hawkeye Solar, LLC (Unit H2SLR) | Solar | IA | — | 250 MW | Regulatory approvals pending | — |
| Hawkeye Solar II, LLC (Unit H2SLR) | Solar | IA | — | 250 MW | Regulatory approvals pending | — |
| IP Meitner Solar (Unit MEITS) | Solar | TX | — | 500 MW | Regulatory approvals pending | — |
| Red Antelope Solar & Energy Storage Farm (Unit 30PNA) | Solar | AZ | — | 400 MW | Planned, approvals not yet initiated | — |
| Red Antelope Solar & Energy Storage Farm (Unit 30PNB) | Storage | AZ | — | 300 MW | Planned, approvals not yet initiated | — |
| Delta Blues Advanced Power Station (Unit 1A) | Gas | MS | — | 477 MW | Regulatory approvals pending | — |
| Delta Blues Advanced Power Station (Unit 1C) | Gas | MS | — | 342 MW | Regulatory approvals pending | — |
| Eagle Eye Solar and Storage (Unit EAGL1) | Solar | AZ | — | 400 MW | Regulatory approvals pending | — |
| Eagle Eye Solar and Storage (Unit EAGL2) | Storage | AZ | — | 400 MW | Regulatory approvals pending | — |
| CO Bar D Solar and BESS (Unit CBDBA) | Storage | AZ | — | 394 MW | Planned, approvals not yet initiated | — |
| CO Bar D Solar and BESS (Unit CBDPV) | Solar | AZ | — | 394 MW | Planned, approvals not yet initiated | — |
| Athens Solar I (Hybrid) (Unit ATHS1) | Solar | CA | — | 250 MW | Planned, approvals not yet initiated | — |
| Athens Solar I (Hybrid) (Unit ATHSB) | Storage | CA | — | 250 MW | Planned, approvals not yet initiated | — |
| IP Roman Solar (Unit ROMS) | Solar | TX | — | 500 MW | Regulatory approvals pending | — |
| Vitex Storage (Unit VITEX) | Storage | NV | — | 300 MW | Regulatory approvals pending | — |
| Sawtooth Solar (Unit STBA) | Storage | AZ | — | 250 MW | Regulatory approvals pending | — |
| Sawtooth Solar (Unit STPV) | Solar | AZ | — | 250 MW | Regulatory approvals pending | — |
| Homer City Generating Station (Unit CA5) | Gas | PA | — | 268 MW | Planned, approvals not yet initiated | — |
| Homer City Generating Station (Unit CA6) | Gas | PA | — | 268 MW | Planned, approvals not yet initiated | — |
| Homer City Generating Station (Unit CT5) | Gas | PA | — | 360 MW | Planned, approvals not yet initiated | — |
| Homer City Generating Station (Unit CT6) | Gas | PA | — | 360 MW | Planned, approvals not yet initiated | — |
| Southern Bighorn Solar Hybrid (Unit BESS) | Storage | NV | — | 300 MW | Planned, approvals not yet initiated | — |
| Southern Bighorn Solar Hybrid (Unit SBS) | Solar | NV | — | 300 MW | Planned, approvals not yet initiated | — |
| Intermountain Pumped Storage Project (Unit HL001) | Storage | UT | — | 250 MW | Planned, approvals not yet initiated | — |
| Intermountain Pumped Storage Project (Unit HL002) | Storage | UT | — | 250 MW | Planned, approvals not yet initiated | — |
| Intermountain Pumped Storage Project (Unit HL003) | Storage | UT | — | 250 MW | Planned, approvals not yet initiated | — |
| Intermountain Pumped Storage Project (Unit HL004) | Storage | UT | — | 250 MW | Planned, approvals not yet initiated | — |
| Haiwee Pumped Storage Project (Unit HL001) | Storage | CA | — | 250 MW | Planned, approvals not yet initiated | — |
| Haiwee Pumped Storage Project (Unit HL002) | Storage | CA | — | 250 MW | Planned, approvals not yet initiated | — |
| Haiwee Pumped Storage Project (Unit HL003) | Storage | CA | — | 250 MW | Planned, approvals not yet initiated | — |
| Haiwee Pumped Storage Project (Unit HL004) | Storage | CA | — | 250 MW | Planned, approvals not yet initiated | — |
| Legend Power Station (Unit LEG) | Gas | TX | — | 754 MW | Regulatory approvals pending | — |
| Lone Star Power Station (Unit 1A) | Gas | TX | — | 467 MW | Regulatory approvals pending | — |
| Ironwood Power Station (Unit 1A) | Gas | AR | — | 467 MW | Regulatory approvals pending | — |
| Gigawatt Solar (Unit GWT1) | Solar | TX | — | 429 MW | Planned, approvals not yet initiated | — |
| Gigawatt Solar (Unit GWT2) | Solar | TX | — | 344 MW | Planned, approvals not yet initiated | — |
| Abercrombie Solar (Unit 1) | Solar | ND | — | 295 MW | Regulatory approvals pending | — |
| IP Roman Wind (Unit ROMW) | Wind (onshore) | TX | — | 671 MW | Regulatory approvals pending | — |
| Silver Queen Wind Farm (Unit NA) | Wind (onshore) | IA | — | 252 MW | Regulatory approvals pending | — |
| Sunscape Renewable Energy (Unit SNSCB) | Storage | TX | — | 500 MW | Planned, approvals not yet initiated | — |
| Sunscape Renewable Energy (Unit SNSCP) | Solar | TX | — | 500 MW | Planned, approvals not yet initiated | — |
| Pepper Hammock Solar and Storage (Unit PEHA) | Solar | GA | — | 900 MW | Regulatory approvals pending | — |
| Sandow Lakes Energy Station (Unit SLES1) | Gas | TX | — | 645 MW | Planned, approvals not yet initiated | — |
| Homer City Generating Station (Unit CA2) | Gas | PA | — | 268 MW | Planned, approvals not yet initiated | — |
| Homer City Generating Station (Unit CA3) | Gas | PA | — | 268 MW | Planned, approvals not yet initiated | — |
| Homer City Generating Station (Unit CT2) | Gas | PA | — | 360 MW | Planned, approvals not yet initiated | — |
| Homer City Generating Station (Unit CT3) | Gas | PA | — | 360 MW | Planned, approvals not yet initiated | — |
| Hecate Energy Harley Hand Solar LLC (Unit 19936) | Solar | TX | — | 514 MW | Planned, approvals not yet initiated | — |
| Purple Sage Energy Center (Unit PSGBS) | Storage | NV | — | 400 MW | Planned, approvals not yet initiated | — |
| Purple Sage Energy Center (Unit PSGPV) | Solar | NV | — | 400 MW | Planned, approvals not yet initiated | — |
| Wolf Summit Energy (Unit HCCT1) | Gas | WV | — | 372 MW | Regulatory approvals pending | — |
| Obsidian Solar Center (Unit OBSLR) | Solar | OR | — | 400 MW | Regulatory approvals pending | — |
| Mill Point Solar (Unit CMPS1) | Solar | NY | — | 250 MW | Planned, approvals not yet initiated | — |
| Mineral Basin Solar Power (Unit MB) | Solar | PA | — | 402 MW | Planned, approvals not yet initiated | — |
| Soleil (Unit SOLEI) | Solar | TX | — | 450 MW | Regulatory approvals pending | — |
| Cuchillas PV and BESS (Unit GRS2B) | Storage | TX | — | 307 MW | Regulatory approvals pending | — |
| Cuchillas PV and BESS (Unit GRS2P) | Solar | TX | — | 306 MW | Regulatory approvals pending | — |
| Cowboy Solar I (Unit CLPBS) | Storage | WY | — | 400 MW | Planned, approvals not yet initiated | — |
| Franklin Farms 1&2 (Unit 1A) | Gas | LA | — | 469 MW | Regulatory approvals pending | — |
| Franklin Farms 1&2 (Unit 1B) | Gas | LA | — | 311 MW | Regulatory approvals pending | — |
| Franklin Farms 1&2 (Unit 2A) | Gas | LA | — | 469 MW | Regulatory approvals pending | — |
| Franklin Farms 1&2 (Unit 2B) | Gas | LA | — | 311 MW | Regulatory approvals pending | — |
| Naples Power Plant (Unit 1) | Gas | TX | — | 450 MW | Planned, approvals not yet initiated | — |
| Naples Power Plant (Unit 2) | Gas | TX | — | 450 MW | Planned, approvals not yet initiated | — |
| Desert Sand BESS (Unit DESA) | Storage | AZ | — | 300 MW | Regulatory approvals pending | — |
| Desert Sand BESS (Unit DESA1) | Solar | AZ | — | 300 MW | Regulatory approvals pending | — |
| Pepper Hammock Solar and Storage (Unit PEHA2) | Storage | GA | — | 400 MW | Regulatory approvals pending | — |
| Sandow Lakes Energy Station (Unit SLES2) | Gas | TX | — | 645 MW | Planned, approvals not yet initiated | — |
| Cumberland (TN) (Unit CTG2) | Gas | TN | — | 455 MW | Planned, approvals not yet initiated | — |
| Cumberland (TN) (Unit STG2) | Gas | TN | — | 323 MW | Planned, approvals not yet initiated | — |
| Talbot County Energy (Unit 7) | Gas | GA | — | 262 MW | Planned, approvals not yet initiated | — |
| Freedom Pine Solar (Unit FPS) | Solar | ME | — | 250 MW | Planned, approvals not yet initiated | — |
| Arkansas Cypress Solar Station (Unit PB1) | Solar | AR | — | 600 MW | Planned, approvals not yet initiated | — |
| Arkansas Cypress Solar Station (Unit PB2) | Storage | AR | — | 350 MW | Planned, approvals not yet initiated | — |
| Bison Generation Station (Unit CA1) | Gas | ND | — | 263 MW | Regulatory approvals pending | — |
| Bison Generation Station (Unit CT1) | Gas | ND | — | 496 MW | Regulatory approvals pending | — |
| Homer City Generating Station (Unit CA7) | Gas | PA | — | 268 MW | Planned, approvals not yet initiated | — |
| Homer City Generating Station (Unit CT7) | Gas | PA | — | 360 MW | Planned, approvals not yet initiated | — |
| THREE SISTERS Solar Generation and BESS (Unit THSI1) | Storage | AZ | — | 300 MW | Regulatory approvals pending | — |
| THREE SISTERS Solar Generation and BESS (Unit THSI2) | Solar | AZ | — | 300 MW | Regulatory approvals pending | — |
| Chesterfield (Unit CERC1) | Gas | VA | — | 250 MW | Regulatory approvals pending | — |
| Chesterfield (Unit CERC2) | Gas | VA | — | 250 MW | Regulatory approvals pending | — |
| Chesterfield (Unit CERC3) | Gas | VA | — | 250 MW | Regulatory approvals pending | — |
| Chesterfield (Unit CERC4) | Gas | VA | — | 250 MW | Regulatory approvals pending | — |
| Arida Solar (Hybrid) (Unit ARIDA) | Solar | NV | — | 370 MW | Planned, approvals not yet initiated | — |
| Arida Solar (Hybrid) (Unit BESS) | Storage | NV | — | 370 MW | Planned, approvals not yet initiated | — |
| Rail Tie Wind (Unit CRTW1) | Wind (onshore) | WY | — | 504 MW | Regulatory approvals pending | — |
| Dutchman Solar generation and BESS (Unit DUTC1) | Solar | WY | — | 499 MW | Regulatory approvals pending | — |
| Dutchman Solar generation and BESS (Unit DUTC2) | Storage | WY | — | 499 MW | Regulatory approvals pending | — |
| Smarr Combined Cycle Energy Facility (Unit 1) | Gas | GA | — | 459 MW | Planned, approvals not yet initiated | — |
| Smarr Combined Cycle Energy Facility (Unit 2) | Gas | GA | — | 345 MW | Planned, approvals not yet initiated | — |
| Homer City Generating Station (Unit CA4) | Gas | PA | — | 268 MW | Planned, approvals not yet initiated | — |
| Homer City Generating Station (Unit CT4) | Gas | PA | — | 360 MW | Planned, approvals not yet initiated | — |
| Amerada (Unit AMERA) | Solar | TX | — | 300 MW | Regulatory approvals pending | — |
| Lazy U ESS 2 (Unit LUBA2) | Storage | TX | — | 250 MW | Planned, approvals not yet initiated | — |
| Lazy U Solar 1 (Unit LUPV1) | Solar | TX | — | 250 MW | Planned, approvals not yet initiated | — |
| Lazy U Solar 2 (Unit LUPV2) | Solar | TX | — | 250 MW | Planned, approvals not yet initiated | — |
| Comanche (OK) (Unit 2G1) | Gas | OK | — | 409 MW | Planned, approvals not yet initiated | — |
| Comanche (OK) (Unit 2S1) | Gas | OK | — | 278 MW | Planned, approvals not yet initiated | — |
| Comanche (OK) (Unit 3G1) | Gas | OK | — | 409 MW | Planned, approvals not yet initiated | — |
| Comanche (OK) (Unit 3S1) | Gas | OK | — | 278 MW | Planned, approvals not yet initiated | — |
| Humidor Storage I (Unit HEHUM) | Storage | CA | — | 300 MW | Planned, approvals not yet initiated | — |
| Oak Valley Solar (Unit OAK) | Solar | TX | — | 251 MW | Planned, approvals not yet initiated | — |
| Lower Snake Solar Generation BESS (Unit LOSN1) | Solar | WA | — | 300 MW | Regulatory approvals pending | — |
| Lower Snake Solar Generation BESS (Unit LOSN2) | Storage | WA | — | 300 MW | Regulatory approvals pending | — |
| Lowman Energy Center (Unit LEC3) | Gas | AL | — | 438 MW | Regulatory approvals pending | — |
| Homer City Generating Station (Unit CA1) | Gas | PA | — | 268 MW | Planned, approvals not yet initiated | — |
| Homer City Generating Station (Unit CT1) | Gas | PA | — | 360 MW | Planned, approvals not yet initiated | — |
| Jefferson Power Station (Unit JPS1) | Gas | AR | — | 342 MW | Regulatory approvals pending | — |
| Jefferson Power Station (Unit JPSCT) | Gas | AR | — | 478 MW | Regulatory approvals pending | — |
| Blue Hills Wind Project (Unit BHWP) | Wind (onshore) | TX | — | 276 MW | Regulatory approvals pending | — |
| Robinson Solar (Unit CRSB1) | Storage | NV | — | 300 MW | Planned, approvals not yet initiated | — |
| Robinson Solar (Unit CRSS1) | Solar | NV | — | 300 MW | Planned, approvals not yet initiated | — |
| Cazadores Solar (Unit 73509) | Solar | TX | — | 300 MW | Planned, approvals not yet initiated | — |
| Princeton Road Station (Unit CT1) | Gas | NE | — | 265 MW | Planned, approvals not yet initiated | — |
| Princeton Road Station (Unit CT2) | Gas | NE | — | 265 MW | Planned, approvals not yet initiated | — |
| Bellflower Solar (VA) (Unit BELLF) | Solar | VA | — | 600 MW | Planned, approvals not yet initiated | — |
| Bison Generation Station (Unit CA2) | Gas | ND | — | 263 MW | Regulatory approvals pending | — |
| Bison Generation Station (Unit CT2) | Gas | ND | — | 496 MW | Regulatory approvals pending | — |
| Richland Parish Power Station 1&2 (Unit 1A) | Gas | LA | — | 469 MW | Planned, approvals not yet initiated | — |
| Richland Parish Power Station 1&2 (Unit 1B) | Gas | LA | — | 311 MW | Planned, approvals not yet initiated | — |
| Richland Parish Power Station 1&2 (Unit 2A) | Gas | LA | — | 469 MW | Planned, approvals not yet initiated | — |
| Richland Parish Power Station 1&2 (Unit 2B) | Gas | LA | — | 311 MW | Planned, approvals not yet initiated | — |
| Lycan Solar Project (Unit LYCN2) | Storage | CA | — | 400 MW | Planned, approvals not yet initiated | — |
| Lincoln Land Energy Center (Unit GEN1) | Gas | IL | — | 638 MW | Planned, approvals not yet initiated | — |
| Lincoln Land Energy Center (Unit GEN2) | Gas | IL | — | 638 MW | Planned, approvals not yet initiated | — |
| Waterford 6 (Unit CT1) | Gas | LA | — | 478 MW | Planned, approvals not yet initiated | — |
| Waterford 6 (Unit ST1) | Gas | LA | — | 342 MW | Planned, approvals not yet initiated | — |
| Gale 1 Solar (Unit 33UI8) | Solar | UT | — | 300 MW | Planned, approvals not yet initiated | — |
| Westlake Power Station (Unit CA1) | Gas | LA | — | 342 MW | Planned, approvals not yet initiated | — |
| Westlake Power Station (Unit CT1) | Gas | LA | — | 478 MW | Planned, approvals not yet initiated | — |
| Richland Parish Power Station 3 (Unit 3A) | Gas | LA | — | 469 MW | Planned, approvals not yet initiated | — |
| Richland Parish Power Station 3 (Unit 3B) | Gas | LA | — | 311 MW | Planned, approvals not yet initiated | — |
| Richland Parish Power Station 4 (Unit 4A) | Gas | LA | — | 469 MW | Planned, approvals not yet initiated | — |
| Richland Parish Power Station 4 (Unit 4B) | Gas | LA | — | 311 MW | Planned, approvals not yet initiated | — |
| Moonlight Flats Solar Power 1 (Unit MFS1) | Solar | PA | — | 250 MW | Planned, approvals not yet initiated | — |
| Kemmerer Unit 1 (Unit KU1) | Nuclear | WY | — | 500 MW | Regulatory approvals pending | — |
| Saddleback Generation Station (Unit GTGEN) | Gas | AZ | — | 375 MW | Planned, approvals not yet initiated | — |
| Saddleback Generation Station (Unit GTGN2) | Gas | AZ | — | 375 MW | Planned, approvals not yet initiated | — |
| Saddleback Generation Station (Unit STGEN) | Gas | AZ | — | 250 MW | Planned, approvals not yet initiated | — |
| Saddleback Generation Station (Unit STGN2) | Gas | AZ | — | 250 MW | Planned, approvals not yet initiated | — |
| Peach Wood Solar (Unit 74964) | Solar | GA | — | 261 MW | Planned, approvals not yet initiated | — |
| Deep Space Solar (Unit 60215) | Solar | CO | — | 300 MW | Planned, approvals not yet initiated | — |
| Pease River Solar (Unit 58441) | Solar | TX | — | 300 MW | Planned, approvals not yet initiated | — |
| Hop Hill Solar Generation and BESS (Unit HOHI1) | Solar | WA | — | 500 MW | Regulatory approvals pending | — |
| Hop Hill Solar Generation and BESS (Unit HOHI2) | Storage | WA | — | 500 MW | Regulatory approvals pending | — |
| Haymaker Hybrid (Unit HAY) | Wind (onshore) | MT | — | 630 MW | Planned, approvals not yet initiated | — |
| Pointe Coupee Power Station (Unit PC1A) | Gas | LA | — | 469 MW | Planned, approvals not yet initiated | — |
| Pointe Coupee Power Station (Unit PC1B) | Gas | LA | — | 311 MW | Planned, approvals not yet initiated | — |
| Pointe Coupee Power Station (Unit PC2A) | Gas | LA | — | 469 MW | Planned, approvals not yet initiated | — |
| Pointe Coupee Power Station (Unit PC2B) | Gas | LA | — | 311 MW | Planned, approvals not yet initiated | — |
| Cedar Island Solar LLC (Unit PV1) | Solar | OR | — | 800 MW | Regulatory approvals pending | — |
| Pointe Coupee Power Station (Unit PC3A) | Gas | LA | — | 469 MW | Planned, approvals not yet initiated | — |
| Pointe Coupee Power Station (Unit PC3B) | Gas | LA | — | 311 MW | Planned, approvals not yet initiated | — |
| MEC South (Unit MECS) | Gas | MI | — | 500 MW | Regulatory approvals pending | — |
| Black Bear Natural Gas Development | Other | TX | — | Not disclosed | Agency permitting | — |
| Piney Woods Development | Other | TX | — | Not disclosed | Agency permitting | — |
| McClellanville 115 kV Transmission Line Project | Transmission | SC | — | Not disclosed | Agency permitting | — |
| Royal Slope Power Transmission Line Project | Transmission | WA | — | Not disclosed | Agency permitting | — |
| Silver Rock Transmission Project | Transmission | UT | — | Not disclosed | Agency permitting | — |
| Seminoe Pumped Storage Project | Storage | WY | — | Not disclosed | Agency permitting | — |
| Surry-Skiffes Creek-Whealton Aerial Transmission Line | Transmission | VA | — | Not disclosed | Agency permitting | — |
| White Pine Pumped Storage | Storage | NV | — | Not disclosed | Agency permitting | — |
| South System Expansion 4 | Pipeline | MS | — | Not disclosed | Agency permitting | — |
| Kosciusko Junction Pipeline Project | Pipeline | MS | — | Not disclosed | Agency permitting | — |
| Crow Creek Pipeline Project | Pipeline | ID | — | Not disclosed | Agency permitting | — |
| Southern Bighorn Solar Projects | Solar | NV | — | Not disclosed | Agency permitting | — |
| G3 Expansion Project | Pipeline | IL | — | Not disclosed | Agency permitting | — |
| Campo Wind Project with Boulder Brush Facilities | Wind (onshore) | CA | — | Not disclosed | Agency permitting | — |
| Texas Gateway Project | Pipeline | TX | — | Not disclosed | Agency permitting | — |
| Silver Star Solar | Solar | NV | — | Not disclosed | Agency permitting | — |
| Vineyard Northeast | Other | MA | — | Not disclosed | Agency permitting | — |
| Vineyard Mid-Atlantic Offshore Wind Project | Wind (offshore) | MA | — | Not disclosed | Agency permitting | — |
| Kitty Hawk South Offshore Wind Project | Wind (offshore) | NC | — | Not disclosed | Agency permitting | — |
| Bonanza Solar Project | Solar | NV | — | Not disclosed | Agency permitting | — |
| Perkins Renewable Energy Project | Other | CA | — | Not disclosed | Agency permitting | — |
| Bluepoint Wind 1 | Wind (onshore) | NY | — | Not disclosed | Agency permitting | — |
| Mosey Solar Project | Solar | NV | — | Not disclosed | Agency permitting | — |
| Atlantic Shores North | Other | NJ | — | Not disclosed | Agency permitting | — |
| Kawich Solar Project | Solar | NV | — | Not disclosed | Agency permitting | — |
| Robert C. Byrd Hydroelectric Project | Hydro | WV | — | Not disclosed | Agency permitting | — |
| Samantha Solar | Solar | NV | — | Not disclosed | Agency permitting | — |
| Beacon Wind | Wind (onshore) | CT | — | Not disclosed | Agency permitting | — |
| Pantheon Solar Project | Solar | NV | — | Not disclosed | Agency permitting | — |
| Larrea Solar Project | Solar | NV | — | Not disclosed | Agency permitting | — |
| Ocean Wind 1 Project | Wind (onshore) | — | — | Not disclosed | Agency permitting | — |
| SouthCoast Wind Energy LLC (SouthCoast Wind) | Wind (onshore) | MA | — | Not disclosed | Agency permitting | — |
| Dominion Energy South Carolina Interconnection Request 20240829009 (Gas) | Gas | SC | — | 338 MW | Interconnection study | — |
| Dominion Energy South Carolina Interconnection Request 20240829004 (Solar+Battery) | Solar | SC | — | 250 MW | Interconnection study | — |
| Dominion Energy South Carolina Interconnection Request 20240829001 (Solar+Battery) | Solar | SC | — | 250 MW | Interconnection study | — |
| Dominion Energy South Carolina Interconnection Request 20240829011 (Gas) | Gas | SC | — | 338 MW | Interconnection study | — |
| Dominion Energy South Carolina Interconnection Request 20240829010 (Gas) | Gas | SC | — | 338 MW | Interconnection study | — |
| Pepper Hammock Solar and Storage (Unit PEHA1) | Solar | GA | — | Not disclosed | Regulatory approvals pending | — |
| Sunstone Solar (Unit PGR45) | Solar | OR | — | Not disclosed | Regulatory approvals pending | — |
| Sunstone Solar (Unit PGB45) | Storage | OR | — | Not disclosed | Regulatory approvals pending | — |
| Vista Sands Solar (Unit VISTA) | Solar | WI | — | Not disclosed | Regulatory approvals pending | — |
| Steward Creek Solar Phase 1 (Unit SC1) | Solar | IL | — | Not disclosed | Planned, approvals not yet initiated | — |
| Deschutes Solar and BESS (Unit DECH2) | Storage | OR | — | Not disclosed | Regulatory approvals pending | — |
| Deschutes Solar and BESS (Unit DECH1) | Solar | OR | — | Not disclosed | Regulatory approvals pending | — |
| Project Matador Nuclear (Unit PMN1) | Nuclear | TX | — | Not disclosed | Planned, approvals not yet initiated | — |
| Project Matador Nuclear (Unit PMN2) | Nuclear | TX | — | Not disclosed | Planned, approvals not yet initiated | — |
| Project Matador Nuclear (Unit PMN4) | Nuclear | TX | — | Not disclosed | Planned, approvals not yet initiated | — |
| Project Matador Nuclear (Unit PMN3) | Nuclear | TX | — | Not disclosed | Planned, approvals not yet initiated | — |
| Algonquin Project Beacon (Algonquin Gas Transmission LLC) | Pipeline | NY,CT,MA,RI | — | 300 MMcf/d | Planned, approvals not yet initiated | — |
| Algonquin Reliable Affordable Resilient Enhancement project (Algonquin Gas Transmission LLC) | Pipeline | MA,RI,CT | — | 75 MMcf/d | Agency permitting | — |
| CCPL Expansion Project (Corpus Christi Stage IV) (Cheniere Corpus Christi Pipeline) | Pipeline | TX | — | 3,000 MMcf/d | Agency permitting | — |
| Apex (Targa Resources) | Pipeline | TX | — | 2,000 MMcf/d | Agency permitting | — |
| Bull Run Extension (Targa Resources) | Pipeline | TX | — | Not disclosed | Agency permitting | — |
| Buffalo Run (Targa Resources) | Pipeline | TX | — | Not disclosed | Planned, approvals not yet initiated | — |
| Capital Area Project (Eastern Gas Transmission and Storage) | Pipeline | PA,MD,VA | — | 68 MMcf/d | Agency permitting | — |
| Bakken East Pipeline Project (WBI Energy Transmission) | Pipeline | ND | — | 1,000 MMcf/d | Agency permitting | — |
| Borealis Project (Texas Gas Transmission) | Pipeline | OH | — | 2,000 MMcf/d | Planned, approvals not yet initiated | — |
| Carnation Project (Texas Gas Transmission (Boardwalk)) | Pipeline | OH | — | 170 MMcf/d | Agency permitting | — |
| Central Mainline Corridor Expansion (Northern Natural Gas Co. (Berkshire Hathaway Energy)) | Pipeline | NE,IA | — | 535 MMcf/d | Agency permitting | — |
| Constitution Pipeline (Revival) (Constitution Pipeline Co. LLC (Williams)) | Pipeline | PA,NY | — | 650 MMcf/d | Agency permitting | — |
| Critical Energy Reliability Link Project (Cheyenne Connector, LLC; East Cheyenne Gas Storage, LLC; Rockies Express Pipeline LLC) | Pipeline | CO | — | 150 MMcf/d | Agency permitting | — |
| Desert Southwest expansion project (Transwestern) | Pipeline | NM,AZ | — | 2,300 MMcf/d | Agency permitting | — |
| Dearborn County Lateral (Texas Gas Transmission LLC) | Pipeline | IN,KY,OH | — | 265 MMcf/d | Agency permitting | — |
| CTPL Expansion Project (Cheniere Creole Trail Pipeline, L.P) | Pipeline | LA | — | 930 MMcf/d | Agency permitting | — |
| DeLa Express Project (DeLa Express LLC) | Pipeline | TX,LA | — | 2,000 MMcf/d | Agency permitting | — |
| Donlin Gold Mine Pipeline (Donlin Gold, LLC) | Pipeline | AK | — | 73 MMcf/d | Agency permitting | — |
| Clarington Connector (EQT Corp.) | Pipeline | OH,PA | — | 400 MMcf/d | Planned, approvals not yet initiated | — |
| Crossroads Expansion Project (Crossroads Pipeline Co. (TC Energy)) | Pipeline | OH,IN | — | 1,500 MMcf/d | Planned, approvals not yet initiated | — |
| Dalton Lateral Expansion II Project (Transcontinental Gas Pipe Line Company, LLC) | Pipeline | GA | — | 460 MMcf/d | Planned, approvals not yet initiated | — |
| Aspire Energy Express (Aspire Energy Express LLC) | Pipeline | OH | — | 300 MMcf/d | Planned, approvals not yet initiated | — |
| Delta Express Pipeline Project (Delta Express Pipeline LLC (Venture Global LNG)) | Pipeline | LA | — | 2,000 MMcf/d | Agency permitting | — |
| Florida Gas Transmission Phase 9 Expansion (Florida Gas Transmission (Energy Transfer)) | Pipeline | FL | — | 550 MMcf/d | Planned, approvals not yet initiated | — |
| Dude Lateral Project (Double E Pipeline LLC) | Pipeline | NM | — | 400 MMcf/d | Agency permitting | — |
| Gillis West Expansion (Transcontinental Gas Pipe Line Company, LLC) | Pipeline | LA | — | 115 MMcf/d | Agency permitting | — |
| Green Chile Project (Energy Transfer (Transwestern)) | Pipeline | NM | — | 400 MMcf/d | Agency permitting | — |
| Greater Philadelphia Expansion (Texas Eastern Transmission, LP (subsidiary of Enbridge)) | Pipeline | PA | — | 475 MMcf/d | Agency permitting | — |
| Guardian Pipeline Project (DT Midstream) | Pipeline | WI,IL | — | 537 MMcf/d | Agency permitting | — |
| Forza pipeline (Forza Pipeline LLC & Bull Run Pipeline LLC (Targa Resources)) | Pipeline | NM,TX | — | 750 MMcf/d | Agency permitting | — |
| Hillabee Expansion Phase 3 (Transcontinental Gas Pipe Line Company, LLC) | Pipeline | AL | — | 106 MMcf/d | Agency permitting | — |
| Huntingdon Connector (Northwest Pipeline, LLC) | Pipeline | WA | — | 87 MMcf/d | Agency permitting | — |
| Great Basin Expansion Project (Great Basin Gas Transmission Co.) | Pipeline | NV | — | 800 MMcf/d | Planned, approvals not yet initiated | — |
| Midwest Market Access Project (Southern Star Central Gas Pipeline) | Pipeline | OK,KS | — | 160 MMcf/d | Agency permitting | — |
| MoGas Expansion Project (Spire Moga's Pipeline LLC) | Pipeline | MO | — | 75 MMcf/d | Agency permitting | — |
| Kosciusko Junction Pipeline Project (Gulf South Pipeline Company, LLC ; Texas Gas Transmission. LLC) | Pipeline | MS | — | 1,180 MMcf/d | Agency permitting | — |
| Line 31 Expansion Project (Enbridge (Texas Eastern)) | Pipeline | MS | — | 125 MMcf/d | Agency permitting | — |
| Line Section 32 Project (WBI Energy Transmission Inc.) | Pipeline | ND | — | 190 MMcf/d | Agency permitting | — |
| Maysville Expansion Project (Columbia Gulf Transmission) | Pipeline | KY | — | 340 MMcf/d | Agency permitting | — |
| Midwestern Gas Transmission Expansion (Midwestern Gas Transmission Co. (DT Midstream)) | Pipeline | IL,TN | — | 1,500 MMcf/d | Planned, approvals not yet initiated | — |
| Elba Express Bridge Project (EEBP) (Elba Express Company LLC) | Pipeline | GA,SC | — | 325 MMcf/d | Agency permitting | — |
| NGPL Gulf Coast Southbound Project (Phase III) (Nat Gas P L Co of America) | Pipeline | IA,IL,MO,AR,TX | — | 260 MMcf/d | Agency permitting | — |
| Northwoods Project (ANR Pipeline Co. (TC Energy)) | Pipeline | MI,WI | — | 390 MMcf/d | Agency permitting | — |
| MVP Boost Expansion (Mountain Valley Pipeline, LLC) | Pipeline | WV,VA | — | 600 MMcf/d | Agency permitting | — |
| Northern Loop Project (Columbia Gas of Ohio) | Pipeline | OH | — | Not disclosed | Agency permitting | — |
| NKY Gate Enhancement Project (TC Energy (Columbia Gas Transmission)) | Pipeline | KY,OH | — | 0 MMcf/d | Agency permitting | — |
| Nueva Era Dos Pipeline Project (Nueva Era Pipeline LLC) | Pipeline | TX, MX | — | 1,000 MMcf/d | Agency permitting | — |
| North Extension Project (Natural Gas Pipeline Company of America LLC) | Pipeline | IA,IL,WI | — | 210 MMcf/d | Agency permitting | — |
| Pelican Thrasher Lateral (WhiteWater Midstream) | Pipeline | LA | — | Not disclosed | Planned, approvals not yet initiated | — |
| Permian West Expansion (Kinder Morgan (El Paso Natural Gas)) | Pipeline | TX | — | 82 MMcf/d | Agency permitting | — |
| Pulaski Expansion Project (Columbia Gulf Transmission) | Pipeline | KY | — | 260 MMcf/d | Agency permitting | — |
| Texas Gateway Project (Gulf South Pipeline Co. LLC) | Pipeline | TX,LA | — | 1,450 MMcf/d | Agency permitting | — |
| Texas-Arkansas Power Project (TAPP) (Kinder Morgan (NGPL)) | Pipeline | TX,AR | — | 400 MMcf/d | Agency permitting | — |
| South Mississippi Project (Energy Transfer) | Pipeline | TX,LA,MS | — | 2,000 MMcf/d | Planned, approvals not yet initiated | — |
| Sabine Crossing Pipeline (Cheniere Energy (Sabine Crossing Pipeline, LLC)) | Pipeline | TX,LA | — | 2,500 MMcf/d | Agency permitting | — |
| South Florida Reliability Project (Florida Gas Transmission (Energy Transfer)) | Pipeline | FL | — | Not disclosed | Planned, approvals not yet initiated | — |
| Shippingport Lateral Project (National Fuel Gas Supply Corporation) | Pipeline | PA | — | 205 MMcf/d | Agency permitting | — |
| Ryckman Creek Lateral Loop Project (Northwest Pipeline LLC (Williams)) | Pipeline | WY | — | 30 MMcf/d | Agency permitting | — |
| Texas Access Project (Kinder Morgan Louisiana Pipeline LLC) | Pipeline | TX,LA | — | 1,300 MMcf/d | Agency permitting | — |
| Tiger Pipeline Expansion Project (Energy Transfer) | Pipeline | LA | — | 1,000 MMcf/d | Planned, approvals not yet initiated | — |
| Transco Power Express Pipeline (Transcontinental Gas Pipe Line (Williams)) | Pipeline | VA | — | 950 MMcf/d | Planned, approvals not yet initiated | — |
| Vector Pipeline Expansion (Vector Pipeline (DT Midstream / Enbridge JV)) | Pipeline | IN,MI,IL | — | 400 MMcf/d | Agency permitting | — |
| Transco Wharton West project (Transcontinental Gas Pipe Line (Williams)) | Pipeline | TX | — | 310 MMcf/d | Agency permitting | — |
| Ventura to Farmington A-line Replacement and Northern Lights 2027 Expansion Project (Northern Natural Gas Company) | Pipeline | IA,MN | — | 79 MMcf/d | Agency permitting | — |
| Viola Project (Southern Star Central Gas Pipeline) | Pipeline | KS | — | 116 MMcf/d | Agency permitting | — |
| Yuma Pipeline Project (LED Enterprises LLC) | Pipeline | AZ | — | 800 MMcf/d | Agency permitting | — |
| Western Massachusetts Natural Gas Reliability Project (Eversource) | Pipeline | MA | — | Not disclosed | Agency permitting | — |
| Wright Interconnect Project (Iroquois Gas Transmission) | Pipeline | NY | — | 650 MMcf/d | Agency permitting | — |
| Tioga to Emerson Project (WBI Energy Transmission) | Pipeline | ND,MN | — | 600 MMcf/d | Agency permitting | — |
| Cedar Springs Wind IV (WY ISC Docket 2022-06) | Wind (onshore) | WY | — | Not disclosed | Local/state review | — |
| Cheyenne Prairie Generating Station Expansion Project (WY ISC Docket 25-05) | Other | WY | — | Not disclosed | Local/state review | — |
| South Cheyenne Solar (WY ISC Docket 2021-08) | Solar | WY | — | Not disclosed | Local/state review | — |
| Sierra Solar Hybrid (Unit SSES1) | Storage | NV | — | 400 MW | Regulatory approvals pending | — |
| Banita Creek- Spindlepop Solar (Unit MIDBS) | Storage | TX | — | 303 MW | Regulatory approvals pending | — |
| Rowdy Creek Solar and BESS (Unit RDYBS) | Storage | TX | — | 350 MW | Regulatory approvals pending | — |
| Sycamore Riverside Energy, LLC (Unit SYRVS) | Gas | IN | — | 964 MW | Planned, approvals not yet initiated | — |
Browse by state
- Texas550
- New York200
- Arizona170
- California149
- Oregon121
- Illinois91
- Maryland88
- Nevada87
- Louisiana84
- Washington67
- Indiana58
- Colorado55
- Michigan53
- Missouri52
- Oklahoma51
- North Dakota46
- Utah44
- Wisconsin44
- Arkansas41
- Kansas39
- New Mexico36
- Ohio36
- Minnesota35
- Pennsylvania32
- Georgia31
- Iowa29
- Wyoming27
- Kentucky26
- Virginia26
- Nebraska22
- Massachusetts21
- South Carolina21
- New Jersey20
- Idaho18
- Montana18
- North Carolina18
- Mississippi15
- Tennessee15
- Delaware13
- Vermont13
- Connecticut12
- Maine12
- Florida11
- South Dakota11
- Rhode Island9
- Alabama7
- West Virginia7
- Mexico3
- Alaska1
- New Hampshire1