WaitingForPower
transmission · Transmission

AEP TEXAS INC. (TX PUCT Docket 57245)

TX

Capacity
Not disclosed
Waiting
1.8 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Timeline

  • Nov 22, 2024
    ORDER OF REFERRAL AND PRELIMINARY ORDERPL
  • Nov 22, 2024
    SOAH ORDER NO. 1 - PROJECT DESCRIPTION; JURISDICTION; REQUIRING COMMENTS ON SUFFICIENCY; SETTING PREHEARING CONFERENCE; GENERAL PROCEDURESPL
  • Dec 12, 2024
    SOAH ORDER NO. 2 - MEMORIALIZING PREHEARING CONFERENCE, ADOPTING PROCEDURAL SCHEDULE, AND SCHEDULING HEARINGPL
  • Jan 2, 2025
    SOAH ORDER NO. 3 - FINDING APPLICATION AND NOTICE SUFFICIENTPL
  • Jan 15, 2025
    SOAH ORDER NO. 4 - GRANTING MOTION TO INTERVENEPL
  • Jan 27, 2025
    SOAH ORDER NO. 5 - ADMITTING EVIDENCE, REMANDING CASE, AND DISMISSING FROM SOAH DOCKETPL

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. No structured location field is published; this project will not appear on the map until geocoded another way.