Capacity
400 MW
Waiting
4.5 yrs
Stage
Interconnection study
Verification
Verified (primary source)
Queue stage
Feasibility Study
Grid region
PJM
Point of interconnection
Fall Creek 345 kV
Estimated investment waiting
$530.8M
≈ 400,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: No exact site address/lat-lon is published in this dataset, and this project's county couldn't be matched to a centroid (missing or unrecognized FIPS code); it will not appear on the map until geocoded another way.