generation · Wind (onshore)
Capacity
400 MW
Waiting
0.8 yrs
Stage
Interconnection study
Verification
Verified (primary source)
Queue stage
In Progress (unknown study)
Grid region
West
Point of interconnection
Craig - Ault 345-kV
Estimated investment waiting
$687.2M
≈ 400,000 kW × $1,718/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.