generation · Solar
Los Angeles Department of Water and Power Interconnection Request Q50 (Solar+Battery)
Millard, UT
Developer: Intermountain Power Agency
Capacity
400 MW
Waiting
10.7 yrs
Stage
Interconnection study
Verification
Verified (primary source)
Queue stage
In Progress (unknown study)
Grid region
West
Point of interconnection
IPP 345kV Switchyard
Estimated investment waiting
$530.8M
≈ 400,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Location
38.9567, -113.1331 — see the map for this project in context with others.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: No exact site address is published in this dataset — the map pin is placed at the project's county centroid, not its actual site.