Capacity
Not disclosed
Waiting
0.5 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).
Timeline
- Jan 23, 2026ORDER NO. 1 - REQUIRING STATUS REPORT — PL
- Feb 3, 2026SHECO's Response to Order No. 1 — PL
- Mar 16, 2026ORDER OF REFERRAL AND PRELIMINARY ORDER — PL
- Mar 24, 2026SOAH ORDER NO. 1- PROJECT DESCRIPTION; JURISDICTION, DEADLINE FOR DECISION, INTERVENTION DEADLINE; COMMENTS ON SUFFICIENCY OF APPLICATION AND NOTICE; SETTING PREHEARING CONFERENCE; CAUTION TO INTERESTED PARTIES; AND GENERAL PROCEDURAL REQUIREMENTS — PL
- Apr 9, 2026SOAH ORDER NO. 2- RESETTING PREHEARING CONFERENCE — PL
- Apr 28, 2026SOAH ORDER NO. 3- MEMORIALIZING PREHEARING CONFERENCE; GRANTING MOTIONS TO INTERVENE; ADOPTING PROCEDURAL SCHEDULE; SCHEDULING HEARING ON THE MERITS; ADVISORY TO INTERVENORS; AND PREAND POST-HEARING EXHIBIT SUBMISSION PROCEDURES — PL
- Jun 22, 2026SOAH ORDER NO. 4- GRANTING JOINT MOTION TO ABATE — PL
- Jul 23, 2026SOAH ORDER NO. 5- EXTENDING ABATEMENT AND REQUIRING STATUS REPORT — PL
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. No structured location field is published; this project will not appear on the map until geocoded another way.