WaitingForPower
transmission · Transmission

Baku-Gavin 765 kV Transmission Line (OH OPSB Case 26-0426-EL-BTX)

Gallia,Jackson,Pike, OH

Developer: AEP Ohio Transmission Company, Inc.

Capacity
Not disclosed
Waiting
0.4 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

  • Oct 27, 2026 · Local public hearing
    Where: Jackson High School Auditorium, 500 Vaughn St., Jackson, Ohio 45640

Hearing Details

Pulled from this project’s own docket source. Check the sources below for the latest.

Sources

Data quality note: Sourced from the Ohio Power Siting Board's public case list. Located in Gallia,Jackson,Pike County, Ohio, per OPSB — no structured coordinates are published, so this project will not appear on the map until geocoded another way.