Capacity
500 MW
Waiting
3.8 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
$663.5M
≈ 500,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the Washington Energy Facility Site Evaluation Council (EFSEC)'s public facility pages, not the Washington Utilities and Transportation Commission (WUTC) — WUTC's own case-docket system has no CPCN/siting-certificate authority over generation or transmission facilities in Washington (confirmed by hand: searching its Electric-industry dockets for certificate/siting/CPCN terms returns essentially nothing relevant); that authority sits with EFSEC under RCW 80.50 instead, so this module ingests EFSEC's facility list. EFSEC's own facility-status field was checked against a real decided case (Desert Claim, node 114) rather than trusted by default — its status correctly reads "Withdrawn," reflecting an SCA termination resolution dated 2025-06-25, even though that facility's separate free-text description paragraph is stale and still describes it as an active, certified, awaiting-construction project. See the ingestion module header for the full check. Application-received date is published as month/year only (no day) — recorded as the 1st of that month. Capacity figure is EFSEC's own published max-generating-capacity figure where available, otherwise parsed from the facility description text — not independently verified. Located in Benton County, Washington, per EFSEC's facility record — no structured coordinates are published, so this project will not appear on the map until geocoded another way.