Capacity
Not disclosed
Waiting
0.4 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).
Timeline
- Apr 10, 2026ORDER OF REFERRAL AND PRELIMINARY ORDER — PL
- Apr 20, 2026SOAH ORDER NO. 1- PROJECT DESCRIPTION; JURISDICTION, INTERVENTION DEADLINE, AND DEADLINE FOR DECISION; COMMENTS ON SUFFICIENCY OF APPLICATION AND NOTICE; SETTING PREHEARING CONFERENCE; CAUTION TO INTERESTED PARTIES; AND GENERAL PROCEDURAL REQUIREMENTS — PL
- May 4, 2026SOAH ORDER NO. 2-MEMORIALIZING PREHEARING CONFERENCE GRANTING MTI FINDING APPLICATION&NOTICE SUFFICIENT ADOPT PROCEDURAL SCHEDULE SETTING ROUTE ADEQUACY HEARING&HEARING ON MERITS ADDRESS HEARING PROCEDURES& PROVIDE NOTICE POTENTIAL DISMISSAL INTERVENORS — PL
- Jun 15, 2026SOAH ORDER NO. 3- REQUIRING STATUS REPORT — PL
- Jun 16, 2026SOAH ORDER NO. 4- CANCELING HEARING ON THE MERITS; ADMITTING EVIDENCE; REMANDING TO THE COMMISSION; AND DISMISSING FROM SOAH’S DOCKET — PL
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. No structured location field is published; this project will not appear on the map until geocoded another way.