WaitingForPower
transmission · Transmission

CITY PUBLIC SERVICE BOARD (CPS ENERGY) (TX PUCT Docket 59549)

TX

Capacity
Not disclosed
Waiting
0.4 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Timeline

  • Apr 10, 2026
    ORDER OF REFERRAL AND PRELIMINARY ORDERPL
  • Apr 20, 2026
    SOAH ORDER NO. 1- PROJECT DESCRIPTION; JURISDICTION, INTERVENTION DEADLINE, AND DEADLINE FOR DECISION; COMMENTS ON SUFFICIENCY OF APPLICATION AND NOTICE; SETTING PREHEARING CONFERENCE; CAUTION TO INTERESTED PARTIES; AND GENERAL PROCEDURAL REQUIREMENTSPL
  • May 4, 2026
    SOAH ORDER NO. 2-MEMORIALIZING PREHEARING CONFERENCE GRANTING MTI FINDING APPLICATION&NOTICE SUFFICIENT ADOPT PROCEDURAL SCHEDULE SETTING ROUTE ADEQUACY HEARING&HEARING ON MERITS ADDRESS HEARING PROCEDURES& PROVIDE NOTICE POTENTIAL DISMISSAL INTERVENORSPL
  • Jun 15, 2026
    SOAH ORDER NO. 3- REQUIRING STATUS REPORTPL
  • Jun 16, 2026
    SOAH ORDER NO. 4- CANCELING HEARING ON THE MERITS; ADMITTING EVIDENCE; REMANDING TO THE COMMISSION; AND DISMISSING FROM SOAH’S DOCKETPL

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. No structured location field is published; this project will not appear on the map until geocoded another way.