Cleco Power LLC (LA PSC Docket U-38035)

LA

Developer: Cleco Power LLC

Capacity
Not disclosed
Waiting
0.2 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

  • Sep 17, 2026 – Sep 17, 2026 · Status Conference
    Where: Galvez Building 11th Floor Conference Room and remote access via teleconferencing

Hearing Details

Pulled from this project’s own docket source. Check the sources below for the latest.

Sources

Data quality note: Sourced from the Louisiana Public Service Commission's public Valence docket portal (Docket Search, Docket Details, and Order Search). LPSC's own per-docket "Status" field (Open/Closed) is not used to determine whether this project is still waiting — it was confirmed unreliable by hand: multiple real dockets with a Commission order already granting certification still show Status "Open" (LPSC keeps a docket open for post-approval compliance monitoring). "Still waiting" here is instead determined by scanning the docket's own Commission orders (via LPSC's separate Order Search) for a dispositive grant/deny/dismissal — see the ingestion module header for how this was calibrated against real orders, including a real 2012 denial and a real procedural-order false positive it's written to avoid. Fuel/technology type could not be confidently determined from the docket's own Synopsis text. No structured location field is published; this project will not appear on the map until geocoded another way.