WaitingForPower
generation · Solar

Entergy Louisiana, LLC (LA PSC Docket U-36697)

LA

Developer: Entergy Louisiana, LLC

Capacity
3,000 MW
Waiting
3.5 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

$3.98B

3,000,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.

Public Hearings

  • Dec 17, 2026 – Dec 18, 2026 · Hearing
    Where: GALVEZ BUILDING, 11TH FLOOR HEARING ROOM

Hearing Details

Pulled from this project’s own docket source. Check the sources below for the latest.

Sources

Data quality note: Sourced from the Louisiana Public Service Commission's public Valence docket portal (Docket Search, Docket Details, and Order Search). LPSC's own per-docket "Status" field (Open/Closed) is not used to determine whether this project is still waiting — it was confirmed unreliable by hand: multiple real dockets with a Commission order already granting certification still show Status "Open" (LPSC keeps a docket open for post-approval compliance monitoring). "Still waiting" here is instead determined by scanning the docket's own Commission orders (via LPSC's separate Order Search) for a dispositive grant/deny/dismissal — see the ingestion module header for how this was calibrated against real orders, including a real 2012 denial and a real procedural-order false positive it's written to avoid. Capacity figure is parsed from the docket's own Synopsis text, not a structured field — not independently verified. No structured location field is published; this project will not appear on the map until geocoded another way.