WaitingForPower
transmission · Transmission

Hanging Rock-Baku 765 kV Transmission Line (OH OPSB Case 26-0870-EL-BTX)

Lawrence,Pike,Scioto, OH

Developer: AEP Ohio Transco

Capacity
Not disclosed
Waiting
0.1 yrs
Stage
Planned, approvals not yet initiated
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the Ohio Power Siting Board's public case list. Located in Lawrence,Pike,Scioto County, Ohio, per OPSB — no structured coordinates are published, so this project will not appear on the map until geocoded another way.