Capacity
Not disclosed
Waiting
1.1 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).
Timeline
- Jul 23, 2025ORDER NO. 1 - REQUIRING COMMISSION STAFF RECOMMENDATION AND ENTERING PROTECTIVE ORDER — PL
- Aug 26, 2025ORDER NO. 2 - FINDING APPLICATION ADMINISTRATIVELY COMPLETE, NOTICE SUFFICIENT, AND ESTABLISHING PROCEDURAL SCHEDULE — PL
- Oct 6, 2025ORDER NO. 3 - GRANTING MOTION TO INTERVENE — PL
- Dec 3, 2025ORDER NO. 4 - ADMITTING EVIDENCE — PL
- Dec 5, 2025PROPOSED ORDER WITH MEMORANDUM — PL
- Dec 18, 2025ERCOT EXCEPTION TO PROPOSED ORDER — PL
- Dec 19, 2025Texas-New Mexico Power Company’s Exceptions To Proposed Order — PL
- Jan 6, 2026REVISED PROPOSED ORDER WITH MEMORANDUM — PL
- Apr 23, 2026ORDER REMANDING PROCEEDING TO DOCKET MANAGEMENT — PL
- Apr 23, 2026OUTGOING COMMISSION-SIGNED ORDER MAIL LOG — PL
- Apr 27, 2026ORDER NO. 5 - SETTING DEADLINE — PL
- May 6, 2026ORDER NO. 6- DEFERRING ENTRY OF PROCEDURAL SCHEDULE — PL
- May 12, 2026ORDER NO. 7- ENTERING PROCEDURAL SCHEDULE — PL
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. No structured location field is published; this project will not appear on the map until geocoded another way.