WaitingForPower
generation · Solar

Golden Knight Solar, LLC (NY DPS Case 24-03062)

St. Lawrence, NY

Developer: Golden Knight Solar, LLC

Capacity
140 MW
Waiting
1.9 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

$185.8M

140,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the New York Department of Public Service's public Document and Matter Management system, Article VIII of the New York Public Service Law / its predecessor Executive Law § 94-c (major renewable energy facility siting). This system does not publish a case/matter "Status" field at all; "still waiting" here is inferred from scanning every publicly filed document's title for a granting/denying determination — see the ingestion module header for how this was calibrated, including a track-specific gotcha (renewable-siting grants are filed as plain correspondence, not as an Order or Decision document type). Capacity figure is parsed from the docket title text, not a structured field — not independently verified. Located in St. Lawrence County, New York, per the docket title — no structured coordinates are published, so this project will not appear on the map until geocoded another way.