WaitingForPower
transmission · Transmission

Florida Power & Light Company (FPL) (FL Siting Case TA26-21)

Broward/Miami-Dade, FL

Developer: Florida Power & Light Company (FPL)

Capacity
Not disclosed
Waiting
0.3 yrs
Stage
Agency permitting
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

  • Oct 22, 2026
    Where: Miami

Hearing Details

Pulled from this project’s own docket source. Check the sources below for the latest.

Sources

Data quality note: Sourced from the Florida Public Service Commission's Determination of Need dockets (pscweb.floridapsc.com) and the Florida DEP Siting Coordination Office's Applications-in-Process and Certified-Facilities pages (floridadep.gov), which jointly administer siting certification under the Power Plant Siting Act / Transmission Line Siting Act. The PSC docket's own "docketCloseDate" is not reliable evidence that the project is done: a PSC determination-of-need sub-docket can close months before the underlying DEP site-certification process (a separate, longer, multi-agency review) actually concludes. "Still waiting" here is instead determined by whether the project currently appears on DEP's own Applications-in-Process page — see the ingestion module header for how this was calibrated against a real example. Located in Broward/Miami-Dade County, Florida, per the DEP/PSC project text — no structured coordinates are published, so this project will not appear on the map until geocoded another way. Currently listed on DEP's Applications-in-Process page (fetched at ingestion time) as an active siting application. A Division of Administrative Hearings (DOAH) certification-hearing date was found for this project's own DOAH case — see the ingestion module header for how this was matched and confirmed live.