generation · Solar
Los Angeles Department of Water and Power Interconnection Request Q85 (Solar+Battery)
Juab, UT
Developer: Intermountain Power Agency
Capacity
275 MW
Waiting
4.9 yrs
Stage
Interconnection study
Verification
Verified (primary source)
Queue stage
In Progress (unknown study)
Grid region
West
Point of interconnection
IPP-Mona 345kV Line
Estimated investment waiting
$364.9M
≈ 275,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Location
39.7141, -112.7905 — see the map for this project in context with others.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: No exact site address is published in this dataset — the map pin is placed at the project's county centroid, not its actual site.