transmission · Transmission
CITY OF SAN ANTONIO, ACTING BY AND THROUGH THE CITY PUBLIC SERVICE BOARD (CPS ENERGY) (TX PUCT Docket 57206)
Capacity
Not disclosed
Waiting
1.8 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).
Timeline
- Nov 4, 2024ORDER OF REFERRAL AND PRELIMINARY ORDER — PL
- Nov 7, 2024SOAH ORDER NO. 1 - PROJECT DESCRIPTION; JURISDICTION AND DEADLINES FOR INTERVENTION AND DECISION; SETTING PREHEARING CONFERENCE; AND GENERAL PROCEDURAL REQUIREMENTS — PL
- Nov 18, 2024SOAH ORDER NO. 2 - MEMORIALIZING PREHEARING CONFERENCE — PL
- Nov 21, 2024SOAH ORDER NO. 3 - ADOPTING AGREED PROCEDURAL SCHEDULE — PL
- Dec 18, 2024SOAH ORDER NO. 4 - ADDRESSING SUFFICIENCY OF APPLICATION AND NOTICE; ADMITTING EVIDENCE; AND REMANDING TO THE COMMISSION — PL
- Jan 16, 2025ORDER NO. 1 - REQUIRING CLARIFICATION — PL
- Jan 22, 2025Response to Order No. 1 and Motion to Admit Evidence — PL
- Jan 23, 2025ORDER NO. 2 - ADMITTING ADDITIONAL EVIDENCE — PL
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. No structured location field is published; this project will not appear on the map until geocoded another way.