Capacity
Not disclosed
Waiting
0.7 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).
Timeline
- Jan 8, 2026Wind Energy Transmission Texas, LLC's Motion for Entry of Protective Order — PL
- Jan 8, 2026Wind Energy Transmission Texas, LLC's Response to Standard Order No. 1 Questions — PL
- Jan 9, 2026ORDER OF REFERRAL AND PRELIMINARY ORDER — PL
- Jan 15, 2026SOAH ORDER NO. 1 - PROJECT DESCRIPTION; JURISDICTION, DEADLINE FOR DECISION, INTERVENTION DEADLINE; COMMENTS ON SUFFICIENCY OFAPPLICATION AND NOTICE; ADOPTING PROTECTIVE ORDER; SETTING PREHEARING CONFERENCE; CAUTION TO INTERESTED PARTIES; AND GENERAL PROCEDURAL REQUIREMENTS — PL
- Jan 27, 2026SOAH ORDER NO. 2- CANCELING PREHEARING CONFERENCE; ADOPTING PROCEDURAL REQUIREMENTS AND PROCEDURES; SETTING AND PROVIDING ZOOM INSTRUCTIONS FOR HEARINGS; ADDRESSING HEARING PROCEDURES, AND PROVIDING NOTICE OF POTENTIAL DISMISSAL OF INTERVENORS — PL
- Feb 9, 2026ORDER NO. 3- HEARING ON THE MERITS — PL
- Feb 12, 2026SOAH ORDER NO. 4- ADDRESSING SUFFICIENCY OF NOTICE AND APPLICATION AND ESTABLISHING PARTIES — PL
- Mar 19, 2026SOAH ORDER NO. 5 - GRANTING AGREED MOTION FOR PAPER HEARING; CANCELING LIVE HEARING;ADOPTING BRIEFING SCHEDULE;REQUIRING PROPOSED FINDINGS OF FACT AND CONCLUSIONS OF LAW; BRIEFING GUIDELINES — PL
- Mar 23, 2026SOAH ORDER NO. 6- ADMITTING EVIDENCE; ADOPTING BRIEFING OUTLINE — PL
- Jul 30, 2026ORDER REMANDING PROCEEDING TO SOAH — PL
- Jul 30, 2026OUTGOING COMMISSION-SIGNED ORDER MAIL LOG — PL
- Aug 6, 2026SOAH ORDER NO. 7- SETTING DEADLINE FOR PROCEDURAL SCHEDULE, STATUS REPORT, OR REQUEST FOR PREHEARING CONFERENCE — PL
- Aug 17, 2026ORDER NO. 8- REQUIRING A STATUS REPORT — PL
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. No structured location field is published; this project will not appear on the map until geocoded another way.