generation · Solar
SOLTAGE MD DEVCO, LLC AND BERLIN LIVING, LLC (MD PSC Case No. 9826)
Developer: SOLTAGE MD DEVCO, LLC AND BERLIN LIVING, LLC
Capacity
18 MW
Waiting
0.9 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
$23.9M
≈ 18,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the Maryland Public Service Commission's public Document and Matter Management system (Certificate of Public Convenience and Necessity applications). This system does not publish a case "Status" field at all; "still waiting" here is inferred from scanning every publicly filed document in the case for a dispositive Commission/Public Utility Law Judge order — see the ingestion module header for how this was calibrated, including several real phrasing variants and two confirmed-safe corroborating signals. Capacity figure is parsed from the docket caption text, not a structured field — not independently verified. No structured location field is published; this project will not appear on the map until geocoded another way.