generation · Solar

Interconnection Request 23INR0006 (Solar)

Zapata, TX

Developer: Sierra Madre Solar LLC

Capacity
255 MW
Waiting
6.6 yrs
Stage
Interconnection study
Verification
Verified (primary source)
Queue stage
Facility Study
Grid region
ERCOT
Point of interconnection
tap 345kV 80307 Del Sol - 80225 Cenizo

Estimated investment waiting

$338.6M

255,150 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.