WaitingForPower
generation · Solar

BLOOMINGTON HILL 1, LLC AND BLOOMINGTON HILL 2, LLC (MD PSC Case No. 9812)

Garrett, MD

Developer: BLOOMINGTON HILL 1, LLC AND BLOOMINGTON HILL 2, LLC

Capacity
9.9 MW
Waiting
1.0 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

$13.1M

9,900 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the Maryland Public Service Commission's public Document and Matter Management system (Certificate of Public Convenience and Necessity applications). This system does not publish a case "Status" field at all; "still waiting" here is inferred from scanning every publicly filed document in the case for a dispositive Commission/Public Utility Law Judge order — see the ingestion module header for how this was calibrated, including several real phrasing variants and two confirmed-safe corroborating signals. Capacity figure is parsed from the docket caption text, not a structured field — not independently verified. Located in Garrett County, Maryland, per the docket caption — no structured coordinates are published, so this project will not appear on the map until geocoded another way.