WaitingForPower

Florida energy projects waiting for approval

11 projects currently waiting on a permitting decision in Florida, tracked live from public federal and state sources. See every state →

11
Projects
5,418 MW
Capacity waiting
2,600 MW
Clean energy capacity waiting
2/11 projects are zero-carbon generation
$21.54B
Est. investment waiting
8/11 projects have an applicable estimate
Documented estimates, not precise figures. See methodology.
11 projects
Project Fuel Location Waiting Capacity Stage Queue stage
Duke Energy Florida Interconnection Request 4 (Gas)GasFL27.4 yrs537 MWInterconnection studyIn Progress (unknown study)
Florida Power & Light Interconnection Request 108 (Nuclear)NuclearFL19.0 yrs1,300 MWInterconnection studyFacility Study
Florida Power & Light Interconnection Request 107 (Nuclear)NuclearFL19.0 yrs1,300 MWInterconnection studyFacility Study
Jacksonville Electric Authority Interconnection Request JEA-Q008 (Gas)GasFL8.5 yrs645 MWInterconnection studyFeasibility Study
Florida Power & Light Interconnection Request 620 (Battery)StorageFL2.7 yrs400 MWInterconnection studySystem Impact Study
Duke Energy Florida Interconnection Request FC100382 (Gas)GasFL0.7 yrs265 MWInterconnection studyIn Progress (unknown study)
Duke Energy Florida Interconnection Request FC100386 (Gas)GasFL0.7 yrs265 MWInterconnection studyIn Progress (unknown study)
Florida Power & Light Company (FPL) (FL Siting Case TA26-21)TransmissionFL0.3 yrsNot disclosedAgency permitting
JEA (FL Siting Case PA81-13A2)GasFL0.3 yrs706 MWAgency permitting
Florida Gas Transmission Phase 9 Expansion (Florida Gas Transmission (Energy Transfer))PipelineFL550 MMcf/dPlanned, approvals not yet initiated
South Florida Reliability Project (Florida Gas Transmission (Energy Transfer))PipelineFLNot disclosedPlanned, approvals not yet initiated