EL PASO ELECTRIC COMPANY (TX PUCT Docket 59690)

TX

Capacity
Not disclosed
Waiting
0.4 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Timeline

  • May 1, 2026
    ORDER OF REFERRALPL
  • May 8, 2026
    SOAH ORDER NO. 1-FILING DESCRIPTION; JURISDICTION; ADOPTING PROTECTIVE ORDER; DEADLINE FOR DECISION; SETTING PREHEARING CONFERENCE; AND ADDRESSING GENERAL PROCEDURESPL
  • Jun 11, 2026
    DRAFT PRELIMINARY ORDER WITH MEMORANDUMPL
  • Jun 15, 2026
    SOAH ORDER NO. 2- CONSOLIDATING CASES; ADOPTING PROCEDURAL SCHEDULE; SETTING HEARING ON THE MERITS; AND ADDRESSING HEARING PROCEDURESPL
  • Jun 18, 2026
    PRELIMINARY ORDERPL
  • Jun 18, 2026
    OUTGOING COMMISSION-SIGNED ORDER MAIL LOGPL

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. No structured location field is published; this project will not appear on the map until geocoded another way.