generation · Wind (onshore)
AMEREN ILLINOIS Interconnection Request J2690 (Wind+Battery)
Washington, IL
Capacity
500 MW
Waiting
4.0 yrs
Stage
Interconnection study
Verification
Verified (primary source)
Queue stage
Cluster Study
Grid region
MISO
Point of interconnection
Other_
Queue cluster
DPP-2022 Central
Estimated investment waiting
$859.0M
≈ 500,000 kW × $1,718/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Location
38.3531, -89.4172 — see the map for this project in context with others.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.