transmission · Transmission
Capacity
Not disclosed
Waiting
0.3 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).
Public Hearings
- Sep 29, 2026Where: APSC/ HR#1/ Commission
Pulled from this project’s own docket source. Check the sources below for the latest.
Sources
Data quality note: Sourced from the Arkansas Public Service Commission's public "olsv2" docket search (Certificate of Environmental Compatibility and Public Need, Ark. Code Ann. §23-18-501 et seq.; Certificate of Convenience and Necessity, Ark. Code Ann. §23-3-201 et seq.; or, for an out-of-state facility, Notice and Authority to Proceed under Ark. Code Ann. §23-18-104). APSC's own docket-level "Open" flag is not used to determine whether this project is still waiting — it was confirmed unreliable by hand: real dockets with a Commission/ALJ order already granting a certificate still show "Open: True" (APSC keeps a docket open for post-approval Independent Monitor oversight and quarterly construction-status reporting). "Still waiting" here is instead determined by scanning the docket's own numbered Commission/ALJ orders for a dispositive grant/deny/dismissal — see the ingestion module header for how this was calibrated against real orders, including a real confirmed grant and a real confirmed false-positive (routine "granted" language about an intervention or protective-order motion, not the certificate itself) that the resolution check is written to avoid. Some real orders state no disposition at all in APSC's own docket-log summary text, in which case that specific order's own PDF is fetched and read directly. No structured location field is published; this project will not appear on the map until geocoded another way.