Capacity
286 MW
Waiting
5.4 yrs
Stage
Interconnection study
Verification
Verified (primary source)
Queue stage
System Impact Study
Grid region
CAISO
Point of interconnection
Imperial Valley Substation 230 kV
Queue cluster
C14
Estimated investment waiting
$379.7M
≈ 286,130 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: No exact site address/lat-lon is published in this dataset, and this project's county couldn't be matched to a centroid (missing or unrecognized FIPS code); it will not appear on the map until geocoded another way.