generation · Gas

Ashville Energy Center (OH OPSB Case 26-196-EL-BGN)

Pickaway, OH

Developer: PowerConneX, Inc.

Capacity
Not disclosed
Waiting
0.5 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

  • Sep 9, 2026 · Evidentiary hearing
    Where: Offices of the Public Utilities Commission of Ohio, 180 E. Broad St., Columbus, Ohio 43215

Hearing Details

Pulled from this project’s own docket source. Check the sources below for the latest.

Sources

Data quality note: Sourced from the Ohio Power Siting Board's public case list. Located in Pickaway County, Ohio, per OPSB — no structured coordinates are published, so this project will not appear on the map until geocoded another way.