WaitingForPower
generation · Solar

STMO Bn, LLC (Starfire) (KY PSC Case 2026-00180)

Knott and Perry, KY

Developer: STMO Bn, LLC (Starfire)

Capacity
200 MW
Waiting
0.0 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

$265.4M

200,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the Kentucky Public Service Commission's public case search and case detail pages (Certificate of Public Convenience and Necessity / Certificate of Construction dockets). "Still waiting" here is primarily determined by the PSC's own case search "Include Closed" filter (a case not returned when closed cases are excluded), cross-checked against the case's own filed documents for a Final Order granting/denying/dismissing the application — see the ingestion module header for how this was calibrated against real dockets, including one confirmed still-pending docket with no PSC action of any kind since 2022. Capacity figure is parsed from the case caption text, not a structured field — not independently verified, and may be a preliminary/pre-application figure if the case's application ultimately proposed a different size. Located in Knott and Perry County, Kentucky, per the case caption — no structured coordinates are published, so this project will not appear on the map until geocoded another way.