generation · Solar
Capacity
240 MW
Waiting
3.7 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
$318.5M
≈ 240,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the Kentucky Public Service Commission's public case search and case detail pages (Certificate of Public Convenience and Necessity / Certificate of Construction dockets). "Still waiting" here is primarily determined by the PSC's own case search "Include Closed" filter (a case not returned when closed cases are excluded), cross-checked against the case's own filed documents for a Final Order granting/denying/dismissing the application — see the ingestion module header for how this was calibrated against real dockets, including one confirmed still-pending docket with no PSC action of any kind since 2022. Capacity figure is parsed from the case caption text, not a structured field — not independently verified, and may be a preliminary/pre-application figure if the case's application ultimately proposed a different size. Located in Ballard County, Kentucky, per the case caption — no structured coordinates are published, so this project will not appear on the map until geocoded another way. Filing date is approximate (Kentucky PSC's own case record only discloses the filing year for this case, not the exact date).