EL PASO ELECTRIC COMPANY (TX PUCT Docket 59836)

TX

Capacity
Not disclosed
Waiting
0.3 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Timeline

  • Jun 5, 2026
    ORDER REQUESTING LISTS OF ISSUESPL
  • Jun 8, 2026
    ORDER NO. 1-ENTERING PROTECTIVE ORDERPL
  • Jun 16, 2026
    ORDER NO. 2 - GRANTING MOTION TO INTERVENEPL
  • Jun 26, 2026
    ORDER REQUESTING BRIEFING ON THRESHOLD ISSUESPL
  • Jul 7, 2026
    ORDER NO. 3 - GRANTING MOTION TO INTERVENEPL
  • Jul 14, 2026
    ORDER GRANTING UNOPPOSED REQUEST FOR EXTENSIONPL
  • Aug 12, 2026
    DRAFT PRELIMINARY ORDER WITH MEMORANDUMPL
  • Aug 20, 2026
    PRELIMINARY ORDERPL
  • Aug 20, 2026
    ORDER OF REFERRALPL

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. No structured location field is published; this project will not appear on the map until geocoded another way.