WaitingForPower
transmission · Transmission

LONE STAR TRANSMISSION, LLC (TX PUCT Docket 58632)

TX

Capacity
Not disclosed
Waiting
0.9 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Timeline

  • Oct 3, 2025
    ORDER NO. 1 - REQUIRING RECOMMENDATION FROM COMMISSION STAFF ON SUFFICIENCY OF APPLICATION AND NOTICE, AND ADDRESSING OTHER PROCEDURAL MATTERSPL
  • Oct 10, 2025
    Lone Star Transmission, LLC's Response to Order No. 1PL
  • Oct 22, 2025
    ORDER NO. 2 -GRANTING EXTENSIONPL
  • Oct 28, 2025
    ORDER NO. 3 - REQUIRING MEMORANDUMPL
  • Oct 31, 2025
    ORDER NO. 4 -FINDING APPLICATION ADMINISTRATIVELY COMPLETE, FINDING NOTICE SUFFICIENT, FINDING RESPONSES SUFFICIENT, AND ESTABLISHING PROCEDURAL SCHEDULEPL
  • Nov 7, 2025
    ORDER NO. 5 - GRANTING EXTENSION AND REVISING PROCEDURAL SCHEDULEPL
  • Dec 12, 2025
    ORDER NO. 6 - ADMITTING EVIDENCEPL

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. No structured location field is published; this project will not appear on the map until geocoded another way.