storage · Storage
Black Hills Cheyenne Light Fuel and Power Transmission Interconnection Request 37316 (Gas+Battery+Other Storage)
Laramie, WY
Capacity
600 MW
Waiting
1.1 yrs
Stage
Interconnection study
Verification
Verified (primary source)
Queue stage
Cluster Study
Grid region
West
Point of interconnection
Tap 230 kV transmission line between West Cheyenne and Sweetgrass substations 2 miles from Sweetgrass substation.
Queue cluster
Cluster 1
Estimated investment waiting
$789.6M
≈ 600,000 kW × $1,316/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Location
41.2928, -104.6604 — see the map for this project in context with others.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: No exact site address is published in this dataset — the map pin is placed at the project's county centroid, not its actual site.