pipeline · Pipeline
Woodward Park North Columbus High Pressure (NCHP) System Pipeline Project (OH OPSB Case 25-0838-GA-BTX)
Franklin, OH
Developer: Columbia Gas of Ohio
Capacity
Not disclosed
Waiting
1.0 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the Ohio Power Siting Board's public case list. Located in Franklin County, Ohio, per OPSB — no structured coordinates are published, so this project will not appear on the map until geocoded another way.