generation · Solar
Capacity
250 MW
Waiting
2.6 yrs
Stage
Interconnection study
Verification
Verified (primary source)
Queue stage
In Progress (unknown study)
Grid region
West
Point of interconnection
Ault 345 kV station
Estimated investment waiting
$331.8M
≈ 250,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: No exact site address/lat-lon is published in this dataset, and this project's county couldn't be matched to a centroid (missing or unrecognized FIPS code); it will not appear on the map until geocoded another way.