Circular EnerG, LLC (NY DPS Case 18-F-0150)

Seneca, NY

Developer: Circular EnerG, LLC

Capacity
80 MW
Waiting
8.5 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: No published typical capital cost is used for fuel type "other" in v1, so no dollar estimate is shown for it.

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the New York Department of Public Service's public Document and Matter Management system, Article VII of the New York Public Service Law (major transmission facility siting). This system does not publish a case/matter "Status" field at all; "still waiting" here is inferred from scanning every publicly filed document's title for a granting/denying determination — see the ingestion module header for how this was calibrated, including a track-specific gotcha (renewable-siting grants are filed as plain correspondence, not as an Order or Decision document type). Capacity figure is parsed from the docket title text, not a structured field — not independently verified. Fuel/technology type could not be confidently determined from the docket title text. Located in Seneca County, New York, per the docket title — no structured coordinates are published, so this project will not appear on the map until geocoded another way.