WaitingForPower
generation · Other

IDAHO POWER COMPANY (Idaho PUC Case IPC-E-26-04)

ID

Capacity
Not disclosed
Waiting
0.5 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the Idaho Public Utilities Commission's public electric case search (Certificate of Public Convenience and Necessity applications, Idaho Code §61-528). "Still waiting" here is primarily determined by IPUC's own case search "Open"/"Closed" status (this source's own Status field on the case detail page is not published to be more granular than that once a case closes — see the ingestion module header for why disposition text isn't separately parsed here). Fuel/technology type could not be confidently determined from the case description text. No structured location field is published; this project will not appear on the map until geocoded another way.