Capacity
Not disclosed
Waiting
0.6 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).
Timeline
- Jan 29, 2026Wind Energy Transmission Texas, LLC's Motion for Entry of Protective Order — PL
- Jan 29, 2026Wind Energy Transmission Texas, LLC's Response to Standard Order No. 1 Questions — PL
- Feb 2, 2026ORDER OF REFERRAL AND PRELIMINARY ORDER — PL
- Feb 9, 2026SOAH ORDER NO. 1- PROJECT DESCRIPTION; JURISDICTION, INTERVENTION DEADLINE, AND DEADLINE FOR DECISION; COMMENTS ON SUFFICIENCY OF APPLICATION AND NOTICE; SETTING PREHEARING CONFERENCE; AND GENERAL PROCEDURAL REQUIREMENTS — PL
- Feb 23, 2026SOAH ORDER NO. 2-MEMORIALIZING PREHEARING CONFERENCE; ADOPTING PROTECTIVE ORDER; FINDING APPLICATION AND NOTICE SUFFICIENT; ADOPTING PROCEDURAL SCHEDULE; SETTING HEARING ON THE MERITS; AND ADDRESSING HEARING PROCEDURES — PL
- Apr 7, 2026SOAH ORDER NO. 3 - AMENDING PROCEDURAL SCHEDULE; RESETTING HEARING ON THE MERITS; AND ADDRESSING HEARING PROCEDURES — PL
- Apr 27, 2026SOAH ORDER NO. 4- RESETTING HEARING ON THE MERITS — PL
- May 28, 2026SOAH ORDER NO. 5- CONTINUING HEARING ON THE MERITS AND REQUIRING STATUS REPORT — PL
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. No structured location field is published; this project will not appear on the map until geocoded another way.