generation · Solar
Capacity
Not disclosed
Waiting
8.3 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the New York Department of Public Service's public Document and Matter Management system, Article VII of the New York Public Service Law (major transmission facility siting). This system does not publish a case/matter "Status" field at all; "still waiting" here is inferred from scanning every publicly filed document's title for a granting/denying determination — see the ingestion module header for how this was calibrated, including a track-specific gotcha (renewable-siting grants are filed as plain correspondence, not as an Order or Decision document type). Located in Niagara County, New York, per the docket title — no structured coordinates are published, so this project will not appear on the map until geocoded another way.