generation · Solar
Capacity
170 MW
Waiting
1.0 yrs
Stage
Local/state review
Verification
Verified (primary source)
Estimated investment waiting
$225.6M
≈ 170,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the South Carolina Public Service Commission's public Docket Management System. The docket's own "Status" field is not reliable (observed to read "Open" even on long-granted dockets); "still waiting" here is inferred from scanning the docket's Orders tab for a granting/denying/dismissing order — see the ingestion module header for how this was calibrated. Capacity figure is parsed from the docket caption text, not a structured field — not independently verified. Located in Sumter County, South Carolina, per the docket caption — no structured coordinates are published, so this project will not appear on the map until geocoded another way.