Interconnection Request 28INR0166 (Battery)

Brown, TX

Developer: Brookesmith Storage LLC

Capacity
351 MW
Waiting
1.4 yrs
Stage
Interconnection study
Verification
Verified (primary source)
Queue stage
Facility Study
Grid region
ERCOT
Point of interconnection
Tap Brown Switch #1444 – Russell Gap Switch #3348

Estimated investment waiting

$461.9M

351,000 kW × $1,316/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.

Location

31.7641, -98.9985 — see the map for this project in context with others.

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources