Idaho energy projects waiting for approval

18 projects currently waiting on a permitting decision in Idaho, tracked live from public federal and state sources. See every state →

18
Projects
5,477 MW
Capacity waiting
3,695 MW
Clean energy capacity waiting
9/18 projects are zero-carbon generation
$9.95B
Est. investment waiting
13/18 projects have an applicable estimate
Documented estimates, not precise figures. See methodology.
18 projects
Project Fuel Location Waiting Capacity Stage Queue stage
HELLS CANYON (FERC No. P-1971)HydroID23.1 yrs1,167 MWAgency permitting
BPA Power Services Interconnection Request G0492 (Hydro)HydroID13.1 yrs300 MWInterconnection studyFacility Study
Idaho Power Company Interconnection Request 737 (Solar)SolarID3.0 yrs280 MWInterconnection studyCluster Study
Interconnection Request G0956 (Wind)Wind (onshore)ID2.9 yrs400 MWInterconnection studyIn Progress (unknown study)
Idaho Power Company Interconnection Request 763 (Wind)Wind (onshore)ID1.4 yrs300 MWInterconnection studyCluster Study
Idaho Power Company Interconnection Request 772 (Solar+Battery)SolarID1.4 yrs300 MWInterconnection studyCluster Study
Idaho Power Company Interconnection Request 759 (Gas)GasID1.4 yrs526 MWInterconnection studyCluster Study
Idaho Power Company Interconnection Request 760 (Gas)GasID1.4 yrs526 MWInterconnection studyCluster Study
Idaho Power Company Interconnection Request 792 (Battery)StorageID1.4 yrs330 MWInterconnection studyCluster Study
Idaho Power Company Interconnection Request 793 (Solar+Battery)SolarID1.4 yrs250 MWInterconnection studyCluster Study
PacifiCorp Interconnection Request T2-029 (Solar+Battery)SolarID1.0 yrs398 MWInterconnection study
PacifiCorp Interconnection Request T2-025 (Wind)Wind (onshore)ID1.0 yrs300 MWInterconnection study
PacifiCorp Interconnection Request T2-040 (Gas)GasID1.0 yrs400 MWInterconnection study
IDAHO POWER COMPANY (Idaho PUC Case IPC-E-26-04)OtherID0.5 yrsNot disclosedLocal/state review
PACIFICORP DBA ROCKY MOUNTAIN POWER (Idaho PUC Case PAC-E-26-06)TransmissionID0.4 yrsNot disclosedLocal/state review
IDAHO POWER COMPANY (Idaho PUC Case IPC-E-26-09)TransmissionID0.4 yrsNot disclosedLocal/state review
AVISTA UTILITIES, INC (Idaho PUC Case AVU-E-26-10)TransmissionID0.2 yrsNot disclosedLocal/state review
Crow Creek Pipeline ProjectPipelineIDNot disclosedAgency permitting