WaitingForPower
generation · Gas

Salt River Project Agricultural Improvement and Power District (AZ ACC Docket L-00000B-26-0375-00268)

Pinal, AZ

Capacity
Not disclosed
Waiting
0.1 yrs
Stage
Local/state review
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

  • Sep 21, 2026 · AZ Power Plant and Line Siting Committee Hearing
  • Sep 21, 2026 · Public Comment
  • Sep 22, 2026 · AZ Power Plant and Line Siting Committee Hearing
  • Sep 23, 2026 · AZ Power Plant and Line Siting Committee Hearing
  • Sep 24, 2026 · AZ Power Plant and Line Siting Committee Hearing
  • Sep 25, 2026 · AZ Power Plant and Line Siting Committee Hearing

Hearing Details

Pulled from this project’s own docket source. Check the sources below for the latest.

Sources

Data quality note: Sourced from the Arizona Corporation Commission's public eDocket system, Line Siting Committee dockets. The docket's own "Status" field is not reliable (observed to still read "Open" on a docket whose certificate had already been granted); "still waiting" here is inferred from whether the docket has any recorded Commission decision — see the ingestion module header for how this was calibrated. Located in Pinal County, Arizona, per the docket description — no structured coordinates are published, so this project will not appear on the map until geocoded another way.