generation · Gas
Capacity
738 MW
Waiting
1.6 yrs
Stage
Litigation
Verification
Verified (primary source)
Estimated investment waiting
$833.9M
≈ 738,000 kW × $1,130/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the Indiana Utility Regulatory Commission's public Certificate of Public Convenience and Necessity (CPCN, Ind. Code ch. 8-1-8.5) docket search. IURC's own docket "Case Status" field was independently checked against each docket's filed Final Orders (via IURC's companion API) rather than trusted at face value — see the ingestion module header for how this was calibrated. This docket's Case Status is "Appealed": the Commission has already issued a Final Order, but that order is being challenged further in court, so the underlying CPCN determination is not yet fully final. Capacity figure is parsed from the docket's petition caption text, not a structured field — not independently verified. The caption describes capacity on a per-unit ("...EACH") basis for what appears to be a multi-unit project — the extracted figure is likely a significant undercount of total project capacity. No Indiana county is named in the docket caption — some IURC CPCN cases approve acquisition of an already-existing (possibly out-of-state) generating facility rather than new in-state construction. No structured coordinates are published regardless, so this project will not appear on the map until geocoded another way.