Briscoe, TX

Developer: NextEra Energy Interconnection Holdings, LLC

Capacity
410 MW
Waiting
2.8 yrs
Stage
Interconnection study
Verification
Verified (primary source)
Queue stage
Facility Study
Grid region
ERCOT
Point of interconnection
Tap 345kV 23914 Tule Canyon - 79001 Cross_W1

Estimated investment waiting

$544.1M

410,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.