Interconnection Request 27INR0453 (Solar)

Coke, TX

Developer: Roboman Solar, LLC

Capacity
273 MW
Waiting
1.2 yrs
Stage
Interconnection study
Verification
Verified (primary source)
Queue stage
Facility Study
Grid region
ERCOT
Point of interconnection
Tap 345 kV (#76009) Twin Buttes – (#76090) Divide Ckt 1

Estimated investment waiting

$361.7M

272,600 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.