Capacity
706 MW
Waiting
0.3 yrs
Stage
Agency permitting
Verification
Verified (primary source)
Estimated investment waiting
$797.8M
≈ 706,000 kW × $1,130/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Public Hearings
- Mar 22, 2027Where: Jacksonville
Pulled from this project’s own docket source. Check the sources below for the latest.
Sources
- FL DEP Siting Coordination Office: JEA St. Johns River Power Park Unit 3 Power Plant Project
- FL PSC Docket No. 20260087
Data quality note: Sourced from the Florida Public Service Commission's Determination of Need dockets (pscweb.floridapsc.com) and the Florida DEP Siting Coordination Office's Applications-in-Process and Certified-Facilities pages (floridadep.gov), which jointly administer siting certification under the Power Plant Siting Act / Transmission Line Siting Act. The PSC docket's own "docketCloseDate" is not reliable evidence that the project is done: a PSC determination-of-need sub-docket can close months before the underlying DEP site-certification process (a separate, longer, multi-agency review) actually concludes. "Still waiting" here is instead determined by whether the project currently appears on DEP's own Applications-in-Process page — see the ingestion module header for how this was calibrated against a real example. Capacity figure is parsed from the DEP project page's descriptive text, not a structured field — not independently verified. Located in Duval County, Florida, per the DEP/PSC project text — no structured coordinates are published, so this project will not appear on the map until geocoded another way. Currently listed on DEP's Applications-in-Process page (fetched at ingestion time) as an active siting application. A Division of Administrative Hearings (DOAH) certification-hearing date was found for this project's own DOAH case — see the ingestion module header for how this was matched and confirmed live.