The 13 dirtiest projects pending approval and how to advocate against them

No permitting docket publishes an emissions number. So “dirtiest” here means the largest fossil-fuel infrastructure still awaiting approval. That means gas plants ranked by megawatts and pipelines ranked by MMcf/d. Each one was individually verified, not just size-sorted. Click through for the docket, hearing dates, and how to advocate.

Gas-fired power plants

  1. 1

    Indiana Michigan Power Company · Indiana

    A 1,520 MW gas plant proposed for I&M's Rockport site to replace retiring coal units. Citizens Action Coalition has formally objected, arguing it's part of a data-center-driven gas buildout that would emit more climate pollution than five Indiana coal plants combined.

    Advocate against this project →
  2. 2

    Monongahela Power Company and The Potomac Edison Company · West Virginia

    A ~$2.48B, 1,200 MW gas plant proposed for the existing Fort Martin coal site, paired with 70 MW of solar. At a July 2026 PSC hearing, all 32 public commenters — including coal miners — spoke against it, arguing it doesn't serve ratepayers.

    Advocate against this project →
  3. 3

    Invenergy Services LLC · Indiana

    Invenergy's third gas plant proposed for Sullivan County, Indiana, sited next to a retired coal plant AEP is separately seeking approval to acquire. No documented community controversy beyond routine public hearings — included here for scale, not for a distinctive fight.

    Advocate against this project →
  4. 4

    Duke Energy Indiana, LLC · Indiana

    The Cayuga Generating Station expansion — two combined-cycle units at roughly 738 MW each (~1,476 MW combined), approved by the IURC in October 2025 and now contested. Citizens Action Coalition projects bills could rise $29/month by 2031 while Duke earns an estimated $550M in profit from the units.

    Advocate against this project →
  5. 5

    JEA · Florida

    A ~$1.6B, 706 MW gas unit approved in August 2026 for JEA's old St. Johns River Power Park site. St. Johns Riverkeeper and the Sierra Club opposed it, citing JEA's continued coal reliance and the site's river and climate impacts.

    Advocate against this project →
  6. 6

    SL Energy Power Plant I, LLC · Texas

    Two combined-cycle units (SLES1 + SLES2) totaling roughly 1,200 MW near Blue, Texas; site clearing was reportedly underway as of this check. A local group, "Move the Gas Plant," challenged the state air permit over ammonia and soot emissions; Texas regulators denied the challenge and issued the permit in 2024.

    Advocate against this project →
  7. 7

    Lincoln Land Energy Center LLC · Illinois

    Two hydrogen-capable gas units (GEN1 + GEN2) near Pawnee in Sangamon County, Illinois, with a state construction permit already issued and combined capacity estimated at roughly 1,100–1,200 MW depending on the source. No documented community-controversy campaign found beyond routine public review.

    Advocate against this project →
  8. 8

    Nexus Fulcrum LLC · Nevada

    A 510 MW gas plant proposed at the former Sierra BioFuels site in the Tahoe-Reno Industrial Center. It's one of several private, "behind-the-meter" gas plants proposed at the same industrial park that drew two hours of public opposition in September 2026 over concerns they sidestep Nevada's renewable energy law.

    Advocate against this project →

Interstate gas pipelines

  1. 1

    Texas

    Part of Cheniere's Corpus Christi Stage IV LNG expansion, still under FERC environmental review. The Sierra Club and South Texas Environmental Justice Network have long criticized the broader Corpus Christi LNG complex for air pollution affecting the Coastal Bend community.

    Advocate against this project →
  2. 2

    Texas, Louisiana

    A roughly 56-mile pipeline from Texas into Louisiana supplying Cheniere's Sabine Pass Stage 5 LNG expansion, included in FERC's April 2026 draft environmental review. No documented controversy specific to this pipeline segment beyond the broader LNG buildout it feeds.

    Advocate against this project →
  3. 3

    New Mexico, Arizona

    A roughly 520-mile expansion recently upsized by Energy Transfer, crossing 234 miles of tribal land including the Navajo Nation. The Sierra Club's Grand Canyon Chapter and Chispa Arizona publicly criticized Arizona Gov. Katie Hobbs for supporting it, citing fossil-fuel lock-in and New Mexico's weak spill/emissions enforcement record.

    Advocate against this project →
  4. 4

    Texas, Louisiana, Mississippi

    An Energy Transfer pipeline targeted for a 2028 in-service date; the company's own open-season materials describe initial capacity of 1 Bcf/d, "scalable to more than 2 Bcf/d," so the larger figure isn't yet a firm commitment. Tracked by the Southern Environmental Law Center as one of several Southeast pipeline projects to watch.

    Advocate against this project →
  5. 5

    Texas, Louisiana

    A roughly 155-mile pipeline from Carthage, Texas to the Gillis Hub in Louisiana, recently granted expedited federal review under the FAST-41 process. No distinct grassroots opposition campaign found beyond routine landowner and easement concerns.

    Advocate against this project →