Xcel Energy and Otter Tail Power Company and PowerOn Midwest (SD PUC EL26-026)
Developer: Xcel Energy and Otter Tail Power Company and PowerOn Midwest
Think you know when this project will be approved?
No sign-in needed
Capacity
765 kV
Waiting
0.0 yrs
Stage
Local/state review
Estimated investment waiting
Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).
Public Hearings
- Sep 22, 2026Where: Room 413, Capitol Building Pierre, South Dakota
Pulled from this project’s own docket source. Check the sources below for the latest.
Sources
✓ Verified (primary source)Data quality note: Sourced from the South Dakota Public Utilities Commission's public docket pages, scoped to Energy Conversion and Transmission Facility permit applications (SDCL 49-41B) filed in the Electric docket series — see the ingestion module header for the real caption phrasings this is scoped to. "Still waiting" vs. resolved here is determined by scanning this docket's own "Orders:" list for real grant/deny/withdraw order language, not by the docket page's own Pending/Closed status badge — that badge was confirmed live to go stale after a real grant (see the ingestion module header). A docket with no grant/deny/withdraw order yet is treated as still pending. Capacity shown is the transmission line's voltage rating (kV), not a MW capacity figure — this source does not publish line MW ratings. No county is named in the docket's own caption text; this project will not appear on the map until geocoded another way.