SOUTHWESTERN ELECTRIC POWER COMPANY (TX PUCT Docket 60204)

TX

Think you know when this project will be approved?

No sign-in needed

Capacity
200 MW
Waiting
0.0 yrs
Stage
Local/state review

Estimated investment waiting

$263.2M

200,000 kW × $1,316/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.

Timeline

  • Sep 9, 2026
    ORDER OF REFERRALPL
  • Sep 11, 2026
    SOAH ORDER NO. 1 - FILING DESCRIPTION, JURISDICTION, REQUIRING FILINGS, AND ADDRESSING GENERAL PROCEDURESPL

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Verified (primary source)
Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. Capacity figure is parsed from the case-style description text, not a structured field — not independently verified. No structured location field is published; this project will not appear on the map until geocoded another way.