storage · Storage
SOUTHWESTERN ELECTRIC POWER COMPANY (TX PUCT Docket 60204)
Think you know when this project will be approved?
No sign-in needed
Capacity
200 MW
Waiting
0.0 yrs
Stage
Local/state review
Estimated investment waiting
$263.2M
≈ 200,000 kW × $1,316/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Timeline
- Sep 9, 2026ORDER OF REFERRAL — PL
- Sep 11, 2026SOAH ORDER NO. 1 - FILING DESCRIPTION, JURISDICTION, REQUIRING FILINGS, AND ADDRESSING GENERAL PROCEDURES — PL
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
✓ Verified (primary source)Data quality note: Sourced from the Texas Public Utility Commission's public Interchange docket search. PUCT publishes no docket-level status field; "still waiting" here is inferred from the filing history (no final order, order on rehearing, or similar closing filing found) — see the ingestion module header for how this was calibrated and its known limits. Capacity figure is parsed from the case-style description text, not a structured field — not independently verified. No structured location field is published; this project will not appear on the map until geocoded another way.