Otter Tail Power Company and Western Minnesota Municipal Power Agency (SD PUC EL24-015)

Grant, SD

Developer: Otter Tail Power Company and Western Minnesota Municipal Power Agency

Capacity
345 kV
Waiting
Stage
Approved, awaiting construction
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the South Dakota Public Utilities Commission's public docket pages, scoped to Energy Conversion and Transmission Facility permit applications (SDCL 49-41B) filed in the Electric docket series — see the ingestion module header for the real caption phrasings this is scoped to. "Still waiting" vs. resolved here is determined by scanning this docket's own "Orders:" list for real grant/deny/withdraw order language, not by the docket page's own Pending/Closed status badge — that badge was confirmed live to go stale after a real grant (see the ingestion module header). A docket with no grant/deny/withdraw order yet is treated as still pending. Capacity shown is the transmission line's voltage rating (kV), not a MW capacity figure — this source does not publish line MW ratings. Located in Grant County, South Dakota, per the docket's own caption text.